1 / 28

SWANA/VRA Annual Meeting Virginia Beach, VA

SWANA/VRA Annual Meeting Virginia Beach, VA. May 7-9 2018. DEQ Updates. Land Protection and Revitalization Program updates: Leslie Beckwith Legislative updates: Justin Williams. DEQ Celebrating 25 th Anniversary. New Governor Ralph Northam. New SNR Matthew Strickler.

keithp
Download Presentation

SWANA/VRA Annual Meeting Virginia Beach, VA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SWANA/VRA Annual Meeting Virginia Beach, VA May 7-9 2018

  2. DEQ Updates Land Protection and Revitalization Program updates: Leslie Beckwith Legislative updates: Justin Williams

  3. DEQ Celebrating 25th Anniversary New Governor Ralph Northam New SNR Matthew Strickler CO Moved to BOA Building 1111 E Main St, Richmond

  4. Regulatory Updates

  5. Regulatory Update • SW Planning & Recycling Regs9 VAC 20-130 • Fast Track Amendment • Updates definitions; • Reorders regulatory sections; • Moves requirement for planning units to maintain/update SWMPs to a stand alone section; • Clarifies major and minor amendments to a SWMP; • Clarifies recycling rate calculation; and • Revises recycling rate credits language to be consistent with §10.1-1411 C of the Code of Virginia. More Info: http://townhall.virginia.gov/L/ViewStage.cfm?stageid=8192

  6. Regulatory Update • Financial Assurance Regulations9 VAC 20-70 • Periodic Review • Comment period ended April 23 • Purpose: • Determine whether regulation should be repealed, amended, or retained in current form • More info: http://townhall.virginia.gov/L/viewpreview.cfm?prid=1628

  7. Regulatory Update • Regulated Medical Waste Regs9 VAC 20-120 • A NOIRA will be published this month • Reorganize to match VSWMR layout • Clarify standards for RMW Generators and Permitted Transfer/Treatment facilities • Address Highly Infectious Waste (i.e. Ebola) • Intend to hold a focused RAP

  8. Guidanceand Other Updates

  9. Composting Exemption Guidance • Clarifies the permit-exempt types of composting • Extends interpretations of some exempt composting types: educational exemptions, pilot projects, composting at universities, one-time composting • Allows agricultural exempt operations under 9 VAC 20-81-397 to accept Category 1 wastes, not just vegetative • Soon to be sent out for comment • DPOR update—All compost facility operators need Class 1 license (includes MSW composting)

  10. Underdrain GuidanceGuidance Memo 2016-02 • Guidance issued 2016 • Annual Reports due Dec 31st on new ALUMS reporting form • Permit modifications if… • Sampling UNDs for full GW suite of constituents • UND sampling not covered in permit

  11. Landfill Gas GuidanceGM 2017-01 – signed September 5, 2017 • Clarifies expected DEQ compliance response to various LFG scenarios • In response to an exceedance (action or compliance level) • Clarifies required reporting (24-hr vs 5-day) • Standardizes an enhanced monitoring frequency • Requests evaluations of existing LFG network • Sets timelines for return to compliance • Sets minimum information in an Alternate Gas Source Demonstration

  12. Landfill Gas GuidanceGM 2017-01 – signed September 5, 2017 • Implementation: • Compliance related changes enforced as of Jan 1, 2018 • LFGMP + LFGRP – update to SI-13 during the next revision of the respective plan. • LFGMP + LFGRP currently under DEQ Review - the plan should be revised to follow the revised SI-13 prior to DEQ approval and permit modification.

  13. Leachate Workgroup • Internal workgroup formed to discuss all issues related to leachate Removal Collection Storage

  14. UECA Update • Uniform Environmental Covenants Act • Imposes activity and use limitations on contaminated property through environmental covenant • Applicability to Landfills addressed in FAQ: http://www.deq.virginia.gov/Portals/0/DEQ/Land/Guidance/UECA.pdf • DEQ has executed 4 UECAs at Solid Waste sites for GW, 2 additional in process

  15. Recycling, Litter Grants and SW Management Updates

  16. Recycling Update • Progress made on developing electronic submittals for RR Report • Completion of this will facilitate a combined SWIA and Recycling Rate Report

  17. Recycling Rates

  18. Litter Prevention and Recycling Grants • DEQ provides funds for litter prevention and recycling grants to localities under a non-competitive grant program based on population and road miles. • Annual taxes are collected through a Litter Tax, Excise Tax on Soft Drinks, and Excise Tax on Beer and Wine Coolers. • Taxes are deposited into Litter Control and Recycling Fund • Since 1981, Virginia businesses have contributed over $54M to the fund to support local government litter control and recycling programs

  19. Litter and Recycling Grants • For FY2018, $1,782,129 was disbursed among 190 applicants (representing 309 local government programs). • For FY2018 a competitive grant component was implemented at the suggestion of the Litter Control and Fund Advisory Board. • $93,987 was disbursed among 13 localities • http://www.deq.virginia.gov/Programs/LandProtectionRevitalization/RecyclingandLitterPreventionPrograms/LitterPreventionandRecyclingGrantPrograms.aspx

  20. Annual SWIA Report • Information on Solid Waste management is submitted by all permitted facilities annually. • This information is used to prepare the Solid Waste Information Assessment Report • Information for 2017 has been submitted and being compiled into the report which will be released June 30, 2018

  21. Total SW Received 2010 - 2016

  22. Methods of SW ManagementComparison 2013 2016

  23. Solid Waste Diverted from LF 2013 2016

  24. Solid Waste Compliance • 749 Site Inspections • 15 Record Review Inspections

  25. Compliance Assistance • Staff have been providing compliance assistance to landfills regarding 3 day cover soil stockpiles to ensure material is capable of suppressing fires, i.e. already excavated (not in a borrow pit), reasonably close to the working face, and managed to control storm water runoff • 24-hr/5-day reporting guidelines are being finalized and example list of items requiring notification will be posted online & distributed to permittees during upcoming inspections

  26. Permitting Time FramesExpectation vs Reality Expected Processing Time Solid waste landfill Part A Completeness review: 30 days Processing of complete application: 90 days (estimated) Public comment: N/A Part B Completeness review: 30 days Processing of complete application: 180 days (estimated) Public comment: 90 days (estimated) Solid waste treatment and storage Permits-by-Rule Completeness review: 30 days

  27. Solid Waste Universe

More Related