1 / 22

Reducing Queue Lock Pessimism in Multiprocessor Schedulability Analysis

This research focuses on reducing the pessimism in existing analysis for multiprocessor scheduling systems with resource sharing. A new model of spinning is proposed, along with schedulability analysis. Empirical evaluations show promising results.

just
Download Presentation

Reducing Queue Lock Pessimism in Multiprocessor Schedulability Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reducing Queue Lock Pessimism in Multiprocessor Schedulability Analysis Yang Chang, Robert Davis and Andy Wellings Real-time Systems Research Group University of York

  2. Overview • Background • Multiprocessor scheduling • Multiprocessor resource sharing • Pessimism in existing work • A new model of spinning • Schedulability analysis • Empirical evaluations • Conclusion and future work

  3. Background: processors Pentium 4 Core i7

  4. Background: multiprocessor scheduling • Partitioned scheduling • A task can only run on a specific processor • Existing exact analysis for single processors can be used • NP-hard to find an optimal task allocation • Global scheduling • Allows tasks to migrate among processors • More appropriate for open systems • Overheads related to task migration • Tractable exact analysis is so far unknown for sporadic tasks • Fixed task-priority / fixed job-priority / dynamic-priority • Focus on fixed task-priority global scheduling (global FP)

  5. Background: multiprocessor resource sharing protocols • Fully Partitioned multiprocessor system • MPCP of Rajkumar et al. 1988 • MSRP of Gai et al. 2001 • Global multiprocessor system • FMLP of Block et al. 2007 • Devi et al. 2006 • P-PCP of Easwaran and Anderson, 2009 • Red ones use queue locks (FIFO-queue-based non-preemptive spin locks) as their building blocks

  6. Background: Queue Locks • Upon resource request • Task becomes non-pre-emptible • Checks if the requested resource has been locked • If not, it enters the critical section and accesses the resource non-preemptively • Otherwise, it is inserted into a FIFO queue for the resource and busy waits until the resource becomes available • Upon resource release • Releases the associated lock • Becomes pre-emptible again • The task at the head of the FIFO queue will get the resource next

  7. Background: current analysis of queue-lock based systems • Existing analyses e.g. [GAI2001], [BLOCK2007], [DEVI2006] inflate the worst-case execution time to include the time wasted spinning • For each resource request, it is assumed that requests to the same resource always interfere with it. • m is the total number of processors • is the total number of tasks that access resource • Hence, each resource request can spin for at most total of the longest critical sections of all tasks regarding resource • Then, use some existing global FP analysis (that does not consider resource sharing)

  8. Pessimism in existing analysis(1) • If there are 4 tasks on a 4 processor system and 3 tasks access the same resource only once while the other task accesses the same resource 100 times, existing analysis estimates that 309 time units will be wasted …99 times… • This is overly pessimistic. The real worst-case scenario for this configuration is: So at most 9 time units will be wasted on spinning

  9. Pessimism in existing analysis(2) • Under global FP scheduling, when analyzing a task at priority k, all tasks with lower priorities can be ignored. • When k is a low priority, many higher priority tasks may have inflated execution times. Pessimism can accumulate at low priorities. This greatly reduces the number of tasksets that can be recognised as schedulable. Aim to provide a less pessimistic model of spinning for lower priority tasks

  10. A less pessimistic modeling of spinning (1) • For each task k, our new model calculates the maximum amount of spinning caused by any task’s accesses to each resource during task k’s deadline Dk. • Our model safely ignores those resource accesses that can never run in parallel with others • Suppose we know the maximum number of requests to a resource every task can have during Dk • For each 2<=x<=m, we calculate the maximum number of resource request groups in which x requests for the same resource could happen in parallel

  11. A less pessimistic modeling of spinning (2) • Calculate the maximum computation time that could be wasted on busy waiting (spinning) by x parallel accesses to the same resource • The worst case can be further improved by considering the duration of resource accesses

  12. Dk Ck ta td Schedulability analysis (1) • Built on Bertogna and Lipari’s sufficient analysis for global FP systems • Total interference to the problem job within its problem window Dk is the total of any execution time that occurs when the problem job is not executing within the problem window • Global FP is work conserving, so if the total interference is less than m*(Dk - Ck) , task k will be guaranteed to be schedulable

  13. Schedulability analysis (2) • With resource sharing, there are 3 differences: 1. Tasks with priorities lower than the problem job can also interfere 2. Spinning wastes processor time 3. A task may be non-preemptively blocked (Block et al. 2007) - Not work conserving • We re-define total interference to the problem job within its problem window as the total of any idle time, task execution time or spinning time that occurs when the problem job is not executing within the problem window • If the total interference is less than m*(Dk - Ck), task k will be guaranteed to be schedulable. Ck does not include any spinning time.

  14. Schedulability analysis (3) • Upper bound on the total interference made up of: • Upper bound on the interference from higher priority tasks to the problem job derived by Bertogna and Lipari. • Total spinning time within the problem window • Upper bound on the interference to the problem job when this job is non-preemptively blocked : m * Bkwhere Bk is the maximum length of the non-preemptive blocking due to lower priority tasks • When the problem job is not one of the m highest priority ready tasks, spinning, high priority task execution, non-preemptible execution of the low priority tasks (excluding any spinning)may occur • When the problem job is spinning, all processor time is part of the total interference. However, some of this processor time has to be spent on spinning. Since all spinning time has been accounted for previously, we can ignore a minimal amount of inevitable spinning and so avoid double counting

  15. Schedulability analysis (4) • New spinning time modeling approach has two interesting characteristics: 1. Irrespective of the priority of the problem job under analysis, all tasks that access a resource always contribute to the total spinning time 2. It ignores all the resource accesses that can never run in parallel with any other resource accesses when estimating total spinning time This makes schedulability analysis work better than existing approaches when analyzing low priority tasks … but worse when analyzing high priority tasks Solution is to combine existing analysis and new analysis (for each task check schedulability using existing WCET Inflation Analysis (WIA) and only if unschedulable check with new technique (lp-CDW), combined approach referred to as m-CDW)

  16. Evaluation • Experiments were conducted on randomly generated task sets: • Priority assignment policy (DkC monotonic) • Processors (4 or 8) • Number of tasks in each set (25) • Total utilization (between 0 and m*100%) • Periods (log uniform in range [2000, 25000]) • Constrained deadlines (uniform in range [C,T]) • 20,000 tasksets for each configuration • Only one resource in the whole system • Max resource accesses in any job is limited to 5 • Length of each resource access is randomly generated. (More graphs in the technical report)

  17. Evaluation (4 processors)

  18. Evaluation (8 processors)

  19. Evaluation (4 processors) Varying taskset cardinality from 10-25 with other parameters held constant U = 2.0 (50%)

  20. Evaluation (8 processors) Varying taskset cardinality from 10-25 with other parameters held constant U = 4.0 (50%)

  21. Conclusion and Future Work • Contribution: • A more effective way of modeling the impact of queue locks on task schedulability – works well when there are a large number of tasks – unlike previous techniques • A new schedulability analysis to work with the new spinning time modeling approach • Future work includes: • Taking nested resource accesses into consideration • Applying this approach to other resource sharing protocols that use queue locks and suspension-based locks (e.g. FMLP)

  22. Questions 22