SCADA For Automatic Meter Reading System

SCADA For Automatic Meter Reading System. Powertrac Jaipur. What is SCADA…. Automating the process of measurement through digital communication techniques Automatic Remote Meter Reading Automation of Pump START/STOP at predefined timings. Why it is needed ??? .

judygordon
Download Presentation

SCADA For Automatic Meter Reading System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SCADA For Automatic Meter Reading System Powertrac Jaipur

  2. What is SCADA… • Automating the process of measurement through digital communication techniques • Automatic Remote Meter Reading • Automation of Pump START/STOP at predefined timings

  3. Why it is needed ??? • Most important need of the country • Huge focus of the state and central government • International focus for GREEN and CLEAN planet • Good system are based on Development of infrastructure and monitoring the data through IT infrastructure

  4. Why it is needed ??? • Ability to detect tamper events & outage occurrence • Remotely connect disconnect power supply through meter • Remotely automatic detection of faults • Fixed interval data gives accurate load information • Any theft can be logged easily & accurately

  5. Aim… As per the Vision of Honourable Prime Minister Digital India Campaign MAKE In India Design in India Development of Rajasthan Based Industry • Need of the hour is the remote data management thru IT infrastructure in REAL TIME Basis for Efficiency and transparency in System

  6. Why not Big Brands… Reason for Complexity and HIGH PRICING of the Multinationals are Huge Software Cost because of the GENERALLY Suitable to 100s of Utilities and Countries ( Not Specific ) Extremely High Overheads • Where as the IT infrastructure has become so Powerful and Affordable the Dependence of Getting the DATA is on MULTINATIONAL Companies who make the PROJECT very complex and Expensive

  7. Why POWERTRAC… 4 Years of DATA MANAGEMENT Experience Implemented in Noida and ABU with PPP Contractors for Automization • MADE IN JAIPUR TO SUIT THE NEED OF RAJASTHAN PHED • FRACTION OF A COST OF MNC PRICING • PARAMETERS AND VISUAL SCREENS SPECIFICALLY DEVELOPED FOR PHED • NO FRILLS

  8. Why POWERTRAC… VERY COMPACT HIGHLY COST EFFECTIVE More Reliable due to use of Upcoming LATCHING RELAY Technology Advance Microprocessor based • COMBINED DATA of ELECTRICITY and WATER Consumption • Measurement , Control and Communication Thru SINGLE MODULE SOLUTION

  9. Working Principle… • Remotely reads customers meters & transfers the data in to the data base • Reduces the need for operators visits to site on daily basis.

  10. Required Components… • Meter Interface Module / Modem • Communication System • Central Office System / Server

  11. Meter Interface Unit / Modem… • Modem is required for • Translating data in to digital format which is necessary to send data from site to central server • Receiving of commands to start / stop system remotely • To send fault Information to predefined contacts

  12. Communication System… • This is a medium required for data transmission • There is two type systems are available as per requirement: • GSM Communication (For Local Server) • GPRS Communication (For Satic IP Server)

  13. Central Office System / Server… • GPRS System Needs Static IP and Web Development • GSM System Needs • Modem To received data from meter • Central Server • Client Software for data acquisition and data analysis

  14. Our Project of AMR… • ESCO Sirohi • ESCO Bharatpur • Lucknow Jal Board • IOCL • Various sites through our website meterdekho.com

  15. Master Selection… • Division Master • Google Map Showing the location of Divisions • Sub Division Master • Google Map Showing the Location of Pumps • Summary Report showing Cumulative Data of the current Month • Daily Data • Plan for Preventive Mainetnance • Meter Master • User Master • User Rights

  16. WebsiteLogin Through a Password

  17. Region wise view for selection

  18. Site Selection for any region…

  19. Live Data View of site…

  20. Conclusion / Advantages… • Smart automated process instead of manual work • Accurate information from the network load to optimize maintenance & investments • Detection of tampering & theft • Accurate measurement of losses • Better network performance & cost efficiency • More intelligence to business planning • Better company credibility

  21. Thank You