Manufacturing of segment display units

Manufacturing of segment display units. Overview. Safety logic Failsafe PLC. Shop floor control PC (WINCC). Safety-Bus. Profi-Bus. Station 1 “Drilling” PLC S7. Station 4 “Quality” PC & PLC S7. Station 2 “Pin-Insertion” PLC S7. Station 3 “Segment- Mounting” PLC S7.

jorn
Download Presentation

Manufacturing of segment display units

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Manufacturing of segment display units

  2. Overview Safety logic Failsafe PLC Shop floor control PC (WINCC) Safety-Bus Profi-Bus Station 1 “Drilling” PLC S7 Station 4 “Quality” PC & PLC S7 Station 2 “Pin-Insertion” PLC S7 Station 3 “Segment- Mounting” PLC S7

  3. Electrical control cabinet: Failsafe PLC T2: 24V T1: 230V FS-PLC Power Relais Fuses Connection Terminals

  4. Electrical control cabinet: Station 1...4 X3 DI8O8 PLC S7 Safety-Bus X0 Emergency stop relais

  5. Start General control sequence Unblocking FS-PLC Shop floor control Home- position ? Safety-Bus Operating mode Manual / Autom. ? Profi-Bus Station 1 “Drilling” Conveyorbelt Conveyorbelt running

  6. General control sequence FS-PLC Shop floor control Shopfloor- control Shop floor control Read and return pallet code Preparing carriers Stop next pallet Order input Order dates PalIet code Status Station 1 “Drilling” Station 1 “Drilling” Station 1 “Drilling”

  7. General control sequence FS-PLC Shop floor control Shop floor control Shop floor control Read and return pallet code Status Pallet code Order data Pin insertion Station 2 “Pin insertion” Station 2 “Pin insertion” Station 2 “Pin insertion”

  8. Emergency Stop General control sequence Emergency- Stop FS-PLC FS-PLC Shop floor control Shop floor control Shop floor control Mounting Read / return Palletcode Emergency- Stop Station 3 “Segment mounting” Station 3 “Segment mounting”

  9. Shop floor controller PC (WINCC)

  10. Pallet code Pallet code drilling Carrier on pallet Get blanc carrier Order dates Station 1: Control sequence Drilling- unit Robot PLC-S7

  11. Pallet code Pallet code Shop floor controller PC (WINCC)

  12. Station 2: Control sequence • Stop pallet • Pin feeding • Insert pins

  13. Shop floor controller PC (WINCC) Pallet code

  14. Sequence: If new Pallet Read / return palletcode Mounting Segment feed Release pallet If Pushbutton: “Stop” wasn’t pressed • Move gripper and pick segment • Move gripper to carrier • Place segment on carrier • Singulize pallet • Clamp pallet • Unclamp pallet • Release pallet

  15. If new pallet Read / return pallet code Mounting Segment feed Release pallet

  16. Shop floor controller PC (WINCC) Pallet code

  17. Start Signal Pallet code Order dates Order dates Station 4: sequence PC Image processing PLC - S7

  18. Image processing:

  19. Start- Signal Result Fertig Ready Station 4: sequence PC Image processing PLC - S7