MIU IV BUILDING PROJECT January 2008 August 2008

MIU IV BUILDING PROJECT January 2008 August 2008. Cecelia H. Yauger Executive Director February 4, 2008 (Original) Building Staff Meeting UPDATE MARCH 10, 2008 (1 st ) UPDATE MARCH 31, 2008 (2 nd ). MOVING SUGGESTIONS- Preparing for the TaC Project- March 31, 2008.

johana
Download Presentation

MIU IV BUILDING PROJECT January 2008 August 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MIU IV BUILDING PROJECT January 2008August 2008 Cecelia H. Yauger Executive Director February 4, 2008 (Original) Building Staff Meeting UPDATE MARCH 10, 2008 (1st) UPDATE MARCH 31, 2008 (2nd)

  2. MOVING SUGGESTIONS- Preparing for the TaC Project- March 31, 2008 • If you are scheduled to move to the LGI area we will be providing a table (2’ x 6’) for you to work at during the TAC project. Please plan to take your chair. • Your phone will be relocated and you will have network access. • We are planning to have 2 networked printers in each of the LGI’s that everyone will use for printing. • Please plan to take what ever you will need to perform your duties for the time that you will be relocated. • If you have a 2 drawer file cabinet it may be moved under your table for your use. Other larger file cabinets may need to be in the hall outside of the LGI’s. If you anticipate the need to move a large file cabinet please see Cecelia Yauger

  3. MOVING SUGGESTIONS- Preparing for the TaC Project- March 31, 2008 • For Safety reasons, access to your office area will be greatly restricted. • All areas will be covered with plastic sheets. You will not be able to return to your work area alone • When packing your area please remove ALL items from the top of your desk, countertops, any cabinets, and from your walls. • I would suggest that you take any personal items home for safe keeping during the renovation. • All flat surfaces must be cleared. • Do not store boxes, crates under your desk or counters as we will also be completing additional network wiring at your work stations during the project. What a great time to spring clean!!!

  4. Parking and Construction Equipment Arrival- March 31, 2008 • A dumpster and trailer will be located in the 5 parking spots next to the island on Maple Street. • It should arrive on April 7, 2008. • If you park in this area you will need to plan accordingly for parking.

  5. Sharing A Common Area Reminders…..March 31, 2008 • 1. When someone adjacent to you asks someone a question for which you know the correct answer, resist the urge to volunteer this information. • 2. Do not enter another common area unless you are invited. Refrain from standing outside a common area to conduct a conversation. • 3. Do not use sign language or whisper to attract the attention of someone who is on the phone. Return later to carry out a conversation if you see someone dialing, checking e-mail or voice mail, or involved in another activity.

  6. Sharing a Common Area Reminders…..March 31, 2008 • 4. Think twice before interrupting someone who appears to be deep in thought. • 5. Be aware of how your voice carries. Always use your "library voice" when speaking in a common area environment. • 6. Avoid using your speakerphone for conversations and voicemail retrieval. Also if you listen to compact discs in your CD drive or to Internet radio, use your headphones. • 7. Do not exchange confidential information in a common area. Try to find a private area, or take your conversation outside.

  7. Sharing A Common Area Reminders….. March 31, 2008 • 8. The smell, noise, and mess of snack foods may be offensive to others. • 9. Follow the practice of saying "Excuse me," or otherwise letting your presence be known before launching a discourse.

  8. JOINT PURCHASING DELIVERY- March 31, 2008 REMINDER • Mark your joint purchasing purchase order with the following: • Delivery Due the week of August 25, 2008. • Deliveries will no be accepted before this date due to renovations.

  9. Approval of Project- February 4, 2008 • The MIUIV Board of Directors approved a 1.4 million dollar Renovation Program with the T.A.C Energy Solutions at the December 19, 2007 meeting. • The T.A.C. Firm will begin work on site in April 2008.

  10. Scope of Work Prior to Project February 4, 2008 • Building Modeling • Data Loggers Placed and Data Analyzed • TAC Engineer Site Visits • Roofing Specialist Site Visits • Building Envelope Specialist Site Visit • Mid-Term Findings Review with Admin and Board Members • Contractor Site Visits • Audit Finalized and Project Reviewed

  11. Review Project February 4, 2008 • Improve Building Infrastructure • Update and Improve Building Systems • Prepare Building for Future • Improve Environmental Quality • Indoor Air Quality • Lighting Quality • Comfortable Space • Improve Energy and Operational Efficiency

  12. Review Project February 4, 2008 ECM 1: HVAC System Upgrades and Improvements • Current System Issues: • Nearing end of useful life • Contributor of poor Indoor Air Quality (IAQ) • Contributor to building comfort problems • Inefficient system combined with no ventilation • Recommended Solution: • Redesigned Variable Refrigerant Volume Heat Pump System • Result: Improved building comfort and indoor air quality as well as reduced energy and maintenance costs

  13. Review Project February 4, 2008 ECM 2: Centralized Digital Control System • Current System Issues: • No central control system • Contributor to high energy usage • Contributor to building comfort problems • Recommended Solution: • Install central, automatic temperature control system integrated with new HVAC systems • Result: Improved building comfort and indoor air quality as well as reduced energy and maintenance costs

  14. Review Project February 4, 2008 ECM 3: Lighting System and Ceiling Improvements • Current Lighting Issues: • Poor lighting layout resulting in poor lighting quality • Outdated and inefficient lighting technology • Contributor to high energy usage • Does not conform to the current energy code • Current Ceiling Issues: • Inconsistent and difficult to maintain ceilings • Occupied spaces without dropped ceiling

  15. Review Project February 4, 2008 ECM 4.2: Air-sealing and Weather-stripping • Current Issues: • Building has numerous points of air-infiltration • Contributes to increased energy costs the building comfort issues • Recommended Solution: • Air-Seal and weather strip areas such as overhangs, soffits, roof edges, duct and pipe penetrations, etc • Will reduce energy consumption and allow HVAC system to operate and maintain space temperature properly

  16. Review Project February 4, 2008 ECM 4.1: Roofing System Improvements • Current Issues: • Roof has leaks, primarily at the intersection of the west additions where there is elevation difference • Roof is out of warranty but in fair condition • Recommended Solution: • Roof Refurbishment

  17. Next Steps- March 10, 2008 • Beginning April 7,2008 the work will be completed in 3 phases. • Relocation of offices will occur on or about the following 4 Target dates: April 7, 2008 April 21-25, 2008 June 1, 2008 July 1, 2008

  18. General InformationFebruary 4, 2008 Main Entrance for visitors and staff of the building will be Campbell Drive. Main Entrance for workers will be Maple Street. Temporary signage will be posted.

  19. Temporary Signage February 4, 2008

  20. Training/Meeting Relocation April 25-August 31, 2008February 4,2008 • To: MIU Management Team Staff • Special Education Supervisors • Frew Mill Administration • From: Cecelia H. Yauger • Re: Facility Options • Date: January 2, 2008 • The MIU Board of Directors voted to authorize the TAC project at the December 19, 2008 board meeting. • As discussed at the staff meetings in October, November, and December the project will temporarily prohibit the use of the training and conference rooms in the MIUIU main office beginning on April 25, 2008. Most, if not all activates scheduled to be hosted at the MIUIV will need to be relocated.

  21. May 2008 RelocationNeeds/Plans- March 10, 2008 April 28- Network Mtg- SB- North Liberty Tac Mtg- SB North Liberty April 29- Sail Mtg- SB- North Liberty April 30- PIL -KZ- Comfort Inn- Mercer May 1- PIL –KZ-Comfort Inn- Mercer LICC Meeting Cancelled May 7- SAC- CY- Grove City Country Club May 8- MATH 3- SB- Moniteau HS LTF- FC- East Main Church May 13- Math Core- SB- North Liberty Sail Core- SB- North Liberty Sped Staff Meeting -Franklin Ed Center Nonpublic Safe /Drug Free Schools & Communities Advisory Council and Nonpublic Administrators Meeting ---both at East Main Church May 14- Emotional Support- SB- North Liberty Interviews – HR May 15- Pupil Transpiration Cord. –Grove City May 16- Sped Contact Meeting – East Main May 19- Network/TAC Mtg- SB- North Liberty Academic Games- Grove City High School May 20 – PA Trust Meeting –BB- Eat Main Church Arts/Humanities- Hoyt Institute of Fine Arts Spec. Ed. Supervisors Mtg. - Franklin Ed Center May 21- Staff, L/M, - East Main Church Board- CY--- Grove City School District Board Room May 22- School Wide Behavior Support- SB- Grove City High School OT/PT Staff- JK- Franklin Ed Center

  22. June 2008 Relocation Needs/Plans March 10, 2008 June 2- Special Ed Staff Mtg. – Mercer Co. Cooperative Extension Office June 5- LICC- AL- Lawrence Co. CAD Office EI Core- AL- Franklin June 11- Emotional Support- SB- Clarence Brown June 17- PANA- JM- Webinar June 18- PIL –KZ- Comfort Inn- Mercer June 19- PIL –KZ- Comfort Inn- Mercer June 20- Special Ed Supervisors Mtg. – Franklin Ed Center June 24- PIL- KZ- Comfort Inn- Mercer Arts/Humanities- to be announced June 25- PIL- KZ- Comfort Inn- Mercer June 26-Strategic Plan Meeting Board- CY- Grove City School District Board Room

  23. July 2008 Relocation Needs/Plans February 4, 2008 No meetings scheduled at this time.

  24. August 2008 Relocation Needs/Plans August 4- Special Ed Staff Mtg. – Franklin Ed Center August 13- Staff Meeting- CY- Grove City SD Board Room MIU IV Board Meeting- CY- Grove City SD Board Room August 15- New Employee Orientation- East Main Church August 18- Special Ed Best Practice- Grove City High School August 19- Best Practices/GCHS August 20-22 Sped In-Service-FC- TBA

  25. Group 1 Relocation-April 7, 2008 March 10, 2008 • Charles Dumbaugh -149 (IMS) • Brian Grossman -152 (Fingerprint Room) • Rick Magargee -152 (Fingerprint Room) • Josh Thompson – 149 (IMS) • Margaret King-Wilson -152 (Fingerprint Room) • Fingerprint Station Alcove of LGI

  26. Group 1 ReturnsApril 21-25, 2008 March 10, 2008 • Charles Dumbaugh -158 (Tech Room) • Brian Grossman - 158 (Tech Room) • Rick Magargee - 158 (Tech Room) • Josh Thompson - 158 (Tech Room) • Margaret King-Wilson - 158 (Tech Room)

  27. Group 2 Relocation- April 21-25 2008 March 10, 2008 Teresa Beatty CCIS Jim Bennett 158 (Tech Room) Susan Black LGI 2 PJ Burchfield CCIS Terri Clark LGI 2 Sally Conley 165 (Lobby of LGI) Olivia Exterovich CCIS Veronica Gardner LGI 1 Robert Ghering 158 (Tech Room) Dave Hofing 158 (Tech Room) Linda Howard 152 (Fingerprint Room) Cheryl Karns LGI 1 Marilyn Kay LGI I John Kassi LGI 2 Jacque Kendall 152 (Fingerprint Room) Liz Kingley 119 (TaC Room) Maggie Kishbaugh LGI 1 Susie Lynn LGI 1 Jill Mancka CCIS LeeAnn McDowell LGI 1 Bonnie Miller LGI 1 Greg Merckle 158 ( Tech Room) Dennis Pack 152 (Fingerprint Room) Dianne Sederland 174 (Records Room) Cathy Shaw LGI 1 Marlene Smith LGI 1 Donna Volpe LGI 1 Jim Warrender 158 (Tech Room) Toby Woodward Franklin

  28. GROUP 3 RelocationJune 1, 2008 March 10, 2008 • Nick Bernard- Tac Room • Nancy Breese- LGI 1 • Paula Bredl –Tac Room • Judy Campagna- Tac Room • Judy Dennis- LGI 2 • Denise Ferguson- LGI 1 • Rhett Fertig- Calendar Completed • Carrie Fusco- LGI 1 • Karen Gaggiano- LGI 1 • Beth Glew- Franklin • Dan Gomola- LGI 2 • Marilyn Goodrich- Calendar Completed • Karen Griffiths- LGI 1 • Lorinda Hess- LGI 2 • Marilyn Hillard – LGI 1 • Tina Keller- Calendar Completed • Wendy Kinnear- LGI 2 • Ruth Klingensmith- LGI 1 • Pat Kriley – LGI 2 • Jane Martin- LGI 2 • Jeff McCullough- LGI 2 • Carolyn Moore- LGI 1 • Becky Moore-LGI 1 • Gail Myers- LGI 1 • Kim Nicklin- LGI 1 • Rosemarie Perrotta- LGI 2 • Scott Powner- 144 (Computer Room) • Nancy Power- (Computer Room) • Nancy Richter- Calendar Completed • Lois Roach- LGI 2 • Melissa Wyllie- LGI 2 • Kim Zippie- LGI 2

  29. GROUP 4 Relocation July 1, 2008 March 10, 2008 • Robert Barber- 102 • Dawn Book – Computer Lab • Frank Cloud- 103 • Ken Davis- Computer Lab • Kathy Fox- 101 • April Kisamore- Computer Lab • Shelly Kyko-Computer Lab • Brenda Marino- 104 • Crystal McFeely- 103 • Kathy Molsky- Computer Lab • Candi Surrena- Computer Lab • Janine Welton- Computer Lab • Donna Urey-101 • Laura Urbach – 100A • Cecelia Yauger- 100A

  30. Questions February 4, 2008 REMEMBER….THE FUTURE IS NOW!!!!! MINOR INCONVENIENCE….. MAJOR IMPROVEMENT!!!! POWERPOINT IS AVAILABLE ON THE WEBSITE. QUESTIONS??? HAVE A GREAT DAY!!!! Thanks for all you do always…..