1 / 5

Japan’s Follow-up Actions to the 1 st Mekong-Japan Summit – Comprehensive Development (I) –

Progress from October 2010 to July 2011. Japan’s Follow-up Actions to the 1 st Mekong-Japan Summit – Comprehensive Development (I) –. Hard and Soft Infrastructure. *[ ] indicates the index number of “Mekong-Japan Action Plan 63.

jesus
Download Presentation

Japan’s Follow-up Actions to the 1 st Mekong-Japan Summit – Comprehensive Development (I) –

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress from October 2010 to July 2011 Japan’s Follow-up Actions to the 1st Mekong-Japan Summit– Comprehensive Development (I) – Hard and Soft Infrastructure *[ ] indicates the index number of “Mekong-Japan Action Plan 63 Formulation of Action Plan of “MJ-CI” on the occasion of Second Mekong- Japan Economic Ministers' Meeting (Oct. 29, 2010)[1.6] ・The Joint Training Program among the network of the Japan Centers in CLV countries and HQ of JICA (6th: May 31, 2011) ・Annual Chief Adviser Consultation on Japan Center (Feb, 2011) [1.11] Mekong Region Electricity Network Planning (Apr. 2011 complete, Laos) [1.2] Construction of Sekaman Bridge (Mar. 2011 complete, Laos ) [1.2] 【Support for ASEAN Connectivity】 Organizing JAPAN’s taskforce on ASEAN Connectivity/ The 1st joint Committee on ASEAN Connectivity between JAPAN and ASEAN connectivity coordinating committee[1.14] Vietnam: Terminal 2 Construction Project in NoiBai International Airport (Yen Loan up to 12.6 bil. JPY, E/N Date: Mar. 2, 2010) [1.3] Projects of Part A (Introduction of X-ray check machine, construction of common control area, dispatch of experts) in the program for the EWEC and SEC for Improving Efficiency of Logistics and Distribution [1.7,1.8] Seminar on Core Nodal Development (Mar. 2011, Hanoi) [1.10] Completion of 80-90% disbursements for the 20 million USD assistance to the CLV-Development Triangle Area [1.2] Designation of “Infrastructure Experts” for promoting package infrastructure export [1.1] Logistics Workshop organized by MLIT & JETRO (Mar. 2011 at Ho Chi Minh ) [1.8] Feasibility Studyto develop and improve hard infrastructure by METI (5 projects in Viet Nam, one in Laos in FY2010) [1.10] Dispatch of Marketing Operation Experts to Cambodia SEZ (Mar. 2011) [1.9] Cambodia: Dispatch of Transport Policy Advisor (May 2009- May 2011)[1.3] Research to the CLV-Development Triangle Area [1.2] Maintenance of Sihanoukville Port, Cambodia [1.2] Cambodia: Construction Ceremony for The Project for Construction of NeakLoeung Bridge (Grant Aid up to 119.4 bil. JPY, E/N Date: Jun. 23, 2010,) [1.1] Greater Mekong Telecommunication Backbone Network Project, Cambodia [1.4] Advisor for Sihanoukville Autonomous Port (Jun. 2009-Jun. 2011)[1.3] *JPNFY: April to next March

  2. Progress from October 2010 to July 2011 Japan’s Follow-up Actions to the 1st Mekong-Japan Summit– Comprehensive Development (II) – *[ ] indicates the index number of “Mekong-Japan Action Plan 63 • Promotion of Public-Private Cooperation • Support of the Development of Cross-regional Economic Rules and Systems Assistance to the Mekong Institute (MI)’s project for strengthening of chambers of commerce located at EWEC area (Feb. 2011-Jan. 2013, CMTV) [2.8] Forum on Public-Private Cooperation in the Mekong region (Dec. 2010) /Japan WG Meetings of the Forum (11 times after Feb 2010)[2.2] Training Course on the Enforcement of Intellectual Property Rights under WIPO (Dec. 2010, CTV) [3.1] • Investment seminars (ASEAN-Japan Centre) [2.7] • Viet Nam (Nov. 2010) • Laos(Jan. 2011) • Thailand (classified by industrial field May. 2010) • Cambodia (Jun. 2011) • Myanmar(Jun. 2011) Public and Private Sectors Dialogues (Cambodia-Japan: Dec. 2010, Lao-Japan: Jan. 2011) [2.1] • Dispatch of Investment Missions and experts organized by ASEAN-Japan Centre [2.7] • Mission to Viet Nam(Jun. 2011) • Advisor on Investment Promotion in Laos (Sep. 2009-Jan 2012) • Experts Dispatch to Food Analysis Center in Myanmar (Jul. 2011) Mekong Institute (MI) Region Consultation(Jul. 2011) [2.8] Complex Project for Developing LachHuyen Port in Viet Nam [2.3] SMEs Seminar about Intellectual Property System (May 26, 27, 2011) [3.1] Dispatch of the advisor to the National Office of Intellectual Property in Viet Nam[3.1] Enhancing the Investment-related Service of Council for the Development of Cambodia (Dec. 2010-Mar. 2013) [3.2] Viet Nam : Partner of rare-earth investigation, development and refinement (Oct. 2010) [2.6] Workshop and Performance on truck safety driving in Viet Nam (Mar. 3, 2011) [3.4] Start of The 4st phase of Viet Nam-Japan Joint Initiative (Jul. 2011, Hanoi) [2.1] Dispatch of the advisor on Customs policy and Administration in Cambodia (Jul. 2009 - Jul. 2011)[3.2] The Operations of the Lao National Unexploded Ordnance Programme (UXO Lao) in the South of Lao PDR by public and private cooperation [5.9]

  3. Progress from October 2010 to July 2011 Japan’s Follow-up Actions to the 1st Mekong-Japan Summit– Environment / Climate Change – *[ ] indicates the index number of “Mekong-Japan Action Plan 63 Laos : the Project for Establishment of Disastrous Weather Monitoring System [4.1(6)] The Forest Preservation Programme (CLTV)[4.1(1)] Green Mekong Forum (Jun. 24, 2011 : co-hosted by Japan Thailand) Participatory Land and Forest Management Project for Reducing Deforestation (Laos) [4.4] Laos : Meteorological and Hydrological Services Improvement Project [4.1(6)] Viet Nam : Project for Building Disaster Resilient Societies in Central Region in Viet Nam [4.4] Support for Drought and Flood Project through MRC [4.2] Viet Nam : Programme for the Improvement of Capabilities to Cope with Natural Disasters Caused by Climate Change) [4.4] Project for Promotion of Participatory Irrigation Management for Sustainable Small-Scale Pro Poor Infrastructure Development (Viet Nam)[4.1(3)] Viet Nam: Memorandum on Flood Control, Dispatch of investigators to flood disaster area of middle Viet Nam [4.1(6)] Thailand : The Project on Capacity Development in Disaster Management in Thailand (Phase2) [4.4] Consultation on Bilateral Offset Credit Mechanism (Viet Nam), Feasibility Study on Bilateral Offset Mechanism (LMTV) [4.1(8)] Myanmar : Project for Preservation of Farming Area for Urgent Rehabilitation of Agricultural Production and Rural Life in Areas Affected by Cyclone Nargis [4.1(6)] ・East Asia Biomass Town Concept Promotion Project (Thailand, Viet Nam) ・International Symposium on East Asia Biomass Town Concept Promotion (Thailand) [4.5] Cambodia : The Programme for Improvement of Capabilities to Cope with Ntural Disasters Caused by Climate Change [4.4] Technological assistance of water supply in the Chongburi province of Thailand [4.1(6)] The Integrated Mangrove Rehabilitation and Management Project through Community Participation in the Ayeyawady Delta (Apr. 2007-Mar. 2013) [4.1(1), (2)] Seminar for promoting environmental measures in CMV (The 8th ASEAN and Japan Transport Minister Meeting) [4.1] Ministers’ Declaration (The 8th Ministers’ Forum on Infrastructure Development in the Asia-Pacific Region : Oct. 2010) [4.2]

  4. Japan’s Follow-up Actions to the 1st Mekong-Japan Summit – Overcoming Vulnerability – Progress from October 2010 to July 2011 【Food Security and Safety】 ・Support to Capacity Building and Implementation of International Food Safety Standards in ASEAN Countries / Information sharing for Transboundary Animal Diseases (TADs) in Asia / The Prevention and Control of transboundary animal diseases in Asia and the Pacific (FY 2011-2015) ・Trust Fund Programme for Strengthening Highly Pathogenic Avian Influenza Control in Asia (FY 2008-2012) ・The prevention and controlof major animal infectious diseases to improve diagnostic capacity of veterinary Services in Asia and the Pacific (FY 2009- 2013) [5.9] *[ ] indicates the index number of “Mekong-Japan Action Plan 63 Grant Aid for Japanese NGO Projects (a total of 14 projects in the Mekong region after the the Second Mekong-Japan Summit, from Nov. 2010) [5.14] Grant Aid for Grass Roots and Human Security Projects (a total of 75 projects in the Mekong region after the Second Mekong-Japan Summit, from Nov. 2010) [5.1] Science and Technology Research Partnership for Sustainable Development (FY 2010 ) [5.12] Human resources development assistance for progress in agricultural productivity(CLMV)[5.9] • Dispatch of the long-term experts to improve resilience against water-related disasters [5.5]([4.1(6)]) • Project for Building Disaster Resilient Societies in Central Region in Vietnam (Feb. 2009 – Feb. 2011) 【Mother , Newborn and Child Health】 Viet Nam : Project for Implementing Maternal and Child Health Handbook for Scaling Up Nationwide[5.1] Laos : the Project for Upgrading Diploma Nurses[5.1] Support to Lao National Unexploded Ordnance Programme(JMAS) Operations in Attapeu Province (Mar. 2010 complete) [5.7] Laos : the Project for Strengthening Integrated Maternal, Neonatal and Child Health Services [5.1] Lao PDR: The project for Support to the Operations of the Lao National Unexploded Ordnance Programme (UXO Lao) in the Provinces of Saravance and Sekong, Lao PDR (Phase 3) (May 2011) [5.9] Cambodia : The Project for Improving Maternal and Newborn Care through Midwifery Capacity Development [5.1] 【Infectious diseases】 Myanmar : Major Infectious Diseases Control Project [5.1] Cambodia : The 6th Program for Integrated Mine Clearance and Landmine Victim Assistance (Grant Aid up to 1.3 bil. JPY, E/N date: Mar. 2009) [5.6] Thailand : Project for Research and Development of Therapeutic Products anainst Infectious Diseases, especially Dengue Virus Infection [5.1] Thailand: Projects on Strengthening of Multi-Disciplinary Teams (MDTs) for Protection of Trafficked Persons in Thailand [5.13] Thailand : International Training Course on STIs Case Management Skills [5.1]

  5. Progress from October 2010 to July 2011 Japan’s Follow-up Actions to the 1st Mekong-Japan Summit – Expansion of Cooperation and Exchanges – *[ ] indicates the index number of “Mekong-Japan Action Plan 63 Invitation of approx. 735 youths from the Mekong region to Japan under JENESYS Programmesbetween Nov. 2010 and Jul. 2011 [8.4] Mekong-Japan Symposium on Ancient Capitalsin Nara (Jun. 22, 2010) [10.1] • Activities by Japan association of Travel Agents (JATA) [9.4] • The 2nd Study trip for promoting school trips to Viet Nam(Dec. 2009) • Dispatch of delegation to The 1st ASEAN Tourism Forum (Jan. 2011, Phnom Penh) • The 1st Promoting Mekong Region Tourism Committee (May 2011) • Seminar on Cruising of the Mekong River (Mar. 2010, Tokyo) • Seminar for corporation about Long-Stay family goods for power saving in summer (May 2011) JENESYS Programme for Promoting Tourism from 5 Mekong Countries (Mar. 2011) [9.3,10.2] • Tourism promotion events organized by ASEAN-Japan Centre [9.2] • ASEAN Fair (Sep. 2010, Kagoshima) • Viet Nam Long Stat Seminar (Dec. 2010, Tokyo) • Myanmar Tourism Introduction Seminar (Mar. 2011, Tokyo) Invitation of parties concerned in the project of Officials from Ministry of Education, Culture, Sports, Science and Technology visited the Mekong region Countries for exchange of views and visiting Community Learning Centers (CLCs) [8.6] Japanese Grant Aid for Human Resource Development Scholarship (Cambodia: FY 2011, LMV: FY 2010) [5.1]

More Related