FIELDS Concept of Operations Team Meeting Dec 1, 2012

FIELDS Concept of Operations Team Meeting Dec 1, 2012. S. Harris (UCB). Orbit Phase 1 - 5. 100% inst duty cycle TPS to sun s/c +x near ram Momentum dumps. Ram S/C to Sun S/C Coord (translated to ~center of gravity, cg). Aphelion. 1.02AU – 0.88AU. x cg. z cg. Cruise/Downlink

jenski
Download Presentation

FIELDS Concept of Operations Team Meeting Dec 1, 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FIELDS Concept of OperationsTeam MeetingDec 1, 2012 S. Harris (UCB)

  2. Orbit Phase 1 - 5 • 100% inst duty cycle • TPS to sun • s/c +x near ram • Momentum dumps Ram S/C to Sun S/C Coord (translated to ~center of gravity, cg) Aphelion 1.02AU – 0.88AU xcg zcg Cruise/Downlink ~158-110 days Primary Science ~11 days • DL science data • TPS to sun except, slews • >0.82AU (thermal) • cooling system activation • >0.7AU (data DL) • s/c rotates about s/c-sun line • Power avail for inst <0.82AU if s/c not DL data, etc 0.25 AU Perihelion 35Rs – 28Rs 0.25 AU MDR charts: 12_Spacecraft – MKLockwood

  3. Orbit Phase 6 - 24 • 100% inst duty cycle • TPS to sun • s/c +x near ram • Momentum dumps Ram S/C to Sun S/C Coord (translated to ~center of gravity, cg) xcg Cruise/Downlink ~102-77 days Aphelion 0.82AU – 0.73AU zcg Primary Science ~11 days 0.25 AU • DL science data • TPS to sun except, slew • >0.7AU (data DL) • s/c rotates about s/c-sun line (momentum management) • Power avail for inst if s/c not DL data, etc Perihelion 20Rs – 9.5Rs 0.25 AU MDR charts: 12_Spacecraft – MKLockwood

  4. Instrument Operation (1 of 2) • Solar Encounter – solar distance < 0.25AU • FIELDS MEP will be ON • All Sensors ON • Survey data will flow directly to S/C SSR • Plan to create 3 levels of Survey Data • 1% data is decimated by 100, lowest resolution, given highest priority for Downlink • 10% data is decimated by 10, given mid-level D/L priority • 89% data is full resolution, given lowest level D/L priority • Why do this? To provide quick look at encounter • Enables us to uplink playlists for Select Data • Provides some flexibility in dealing with D/L schedule • Burst data, or “Select” data will flow to FIELDS Flash Memory • After reviewing Survey data, will decide which Select data to D/L • Total allocation, Survey + Select, is 20Gbit / encounter • Encounter – safe mode and recovery • If S/C enters Safe mode, instruments will be powered off • FIELDS must autonomously return to previous operational mode after recovery

  5. Instrument Operation (2 of 2) • Solar distance > 0.25AU • No requirement for science data for solar distance > 0.25AU • However, there is power for instruments for distances < 0.8AU • Must still operate within D/L data allocation • FIELDS MEP must be ON to transfer “Select” data to S/C SSR, however • MEP is OFF during Ka-band operation (power constraint to operate TWTAs) • MEP is OFF if S/C operations require more power, e.g. Side B health checks • MEP is OFF for Trajectory Correction Maneuvers • MEP is OFF for Venus flybys (Maybe) • Other times, as well • So, managing data transfer from MEP Flash Memory to S/C SSR requires some planning • S/C charging (primarily due to TPS) will deviate outside of 10V

  6. Ka-band Downlink Constraints • All science data is downlinked via Ka-band, no other channel • DSN passes are generally scheduled for 6 hours (8 including margin) • Despite this, instruments will remain OFF if D/L scheduled for consecutive days • On some orbits it creates a race condition for us to review data, upload playlists For example: Orbit 5: ~5 days to D/L Orbit 4 data ~9 days to D/L Orbit 5 data Assuming we want to transfer 10Gbits to S/C SSR, using 80kbps telemetry interface, would take 1.5days • Some orbits have very stretched out D/L periods, results in reduced opportunities for science data operation • e.g. Orbit 13, 17 • So, all orbits have to be planned individually, for science operation and data transfer