An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The E-ELT J.-G. Cuby, LAM

  2. ESO, December 2011 • Proposal for a 39-m diameter telescope • Cost to completion : 1180 M€ • Including 100 M€ for (4) instruments • 100 M€ contingency • Start of operations Q4 2022 • Approval: possibly in 2012, contingent on Brazil joining ESO and member states approving their extra contribution to finance the E-ELT • France has ! LIA-Origins Workshop 2012

  3. The European Extremely Large Telescope ESO (14 European member states + Brazil) 5-mirror design, 10 arcmin field of view Adaptive Optics Telescope Deformable mirror Laser Guide Stars (6-8) 39-m segmented M1 (1100 m2), 798 / 931 segments, 1.45 m M2: 4.1-m M3: 3.7-m M4: 2.4-m (adaptive) M5: 2.6-m LIA-Origins Workshop 2012

  4. LIA-Origins Workshop 2012

  5. The Adaptive Optics Zoo Extreme Adaptive Optics SCAO, MCAO, LTAO, GLAO, MOAO, XAO • 2 Families: • High correction over ~1-2' arcmin fov (MCAO), or locally over 5-10' fov (MOAO)‏ • MCAO / MOAO • IQ From 5-10 mas to 100 mas • Low correction over a 5-10' fov • noAO / GLAO • IQ ~ 300-600 mas LIA-Origins Workshop 2012

  6. E-ELT Instrument Suite • Phase A conceptual studies: eight instruments + 2 Adaptive Optics modules • Two first light instruments selected: • Micado. Diff. limited near-IR imager, 1 arcminfov. • Harmoni, multi-mode IFU, 5” x 10” • (this represents ~ 50% of the TMT first light instrument capabilities) • Then (#3) a mid-IR instrument (ELT-MIR) • Then ELT-MOS and ELT-HIRES (#4 and #5, order TBD) • ELT-6 TBD • ELT-PCS (XAO high contrast imager for exoplanets) as technological maturity allows LIA-Origins Workshop 2012

  7. E-ELT MOS • 3 concepts have been studied as part of the ELT instrument phase A studies • EAGLE (IFUs) • OPTIMOS-DIORAMAS (slits) • OPTIMOS-EVE (fibres) LIA-Origins Workshop 2012

  8. E-ELT HIRES • 2 instrument have been studied as part of the ELT instrument phase A studies, one in the optical (with extreme stability – laser comb) and one in the near IR (CODEX and SIMPLE) • E-ELT HIRES will rely on one of these two concepts, or a combination of both LIA-Origins Workshop 2012

  9. Science cases • Similar to all ELT projects • Strong synergies with ALMA, JWST, etc. • Headings of the TMT science cases • The first luminous objects • High-redshiftUniverse • Dissecting galaxies • The physics of galaxy formation and evolution • Stellar Populations in the Local Universe • Black holes and active galactic nuclei • Physics of Star and Planet Formation • Characterizing exoplanets • Spectroscopy of exoplanetatmospheres • Doppler detection of terrestrial planets • Atmospheres of terrestrial planets • Solar system studies • Some projects somewhat specific to the E-ELT: acceleration of the Universe, Galactic Center, etc. LIA-Origins Workshop 2012

  10. ELT parameter space • 10 to 20 arcminfov (max). In practice, 5 to 10 arcmin • Spatial resolution (from a few milli-arcsec to 500 mas) • Mostly Red / Near IR / mid IR • Same paradigm as with HST and current generation of 8-10 m telescopes: Imaging in space (JWST), Spectroscopy from the ground (ELT) LIA-Origins Workshop 2012

  11. Exoplanets • Radial velocity down to 1 cm.s-1 • High contrast imaging (XAO + coronagraph • Near IR high-Res spectroscopy of transiting planets Earth-like planets from RV Simulation of the direct imaging of exoplanets with the E-ELT. Near-infrared spectrum of an Earth-like atmosphere (transit spectroscopy) LIA-Origins Workshop 2012

  12. Stellar-Archaelogy ACS: F814W [~3x3 arcmin] Anonymous galaxy, 2 Mpc ACS image

  13. Stellar-Archaelogy 9 arcsec ACS image ACS image

  14. Stellar-Archaelogy 9 arcsec ACS image Simulated E-ELT 3D-cube plane DRSP: 1000 stars in ~ 25 hrs ACS image

  15. The physics of highredshift galaxies The physics of galaxies at z = 3-6 On-going and future studies with VLT (SINFONI, KMOS,…) • E-ELT Instruments: • Harmoni • EAGLE • Optimos-EVE • Optimos-Dioramas Programme of 100 galaxies at the VLT (SINFONI). z = 1-2 LIA-Origins Workshop 2012

  16. The most distant galaxies The physics of the ‘first light’ galaxies (z > 7). UV continuum spectroscopy. Doing at z ~ 8 what Keck has done at z =3 (LBGs) z = 7-8 galaxies in the HUDF (HST/WFC3) • E-ELT Instruments: • Harmoni • EAGLE • OPTIMOS-Dioramas Shapley et al., 2003 Bouwens et al., 2011, ApJ737

  17. The redshift drift • The estimated amplitude of this redshift drift over a decade is only about 6 cms-1. • Effect detectable with a ultra-high stability and precision spectrograph (a few cm/s) over 10 – 20 yrs: 4000 hours over 20 years willunequivocallyprove the existence of darkenergywithoutassumingflatness, usinganyothercosmologicalconstraints or makinganyotherastrophysicalassumption • Providesindependent confirmation of SNIaresults, using a different method and a complementaryredshiftrange LIA-Origins Workshop 2012

  18. Conclusions • Stay tuned, funding decision hopefully in 2012 • Start of operations 2022 • With two or three instruments • More instruments developed one every ~ 2 yrs LIA-Origins Workshop 2012

  19. ELT projects • TMT • 30m • 20’ fov • First light ~ 2022 • GMT • 21m • 20’ fov • E-ELT • 39m • 10’ fov

  20. Instrumentation 38 Institutes in 10 ESO countries +1 in Chile, >100FTEs ~ 2 M€ (out of 2.8 in Phase B) to external institutes for the studies + 25 ESO FTEs • First two instruments are being chosen to be included in proposal for construction • Pool of 4-5 instruments to be progressively deployed at the telescope • Schedule and process unclear at this point LIA-Origins Workshop 2012

  21. Context • Wide field surveys on 4-m and 8-m telescopes from ground (VLT, VISTA, Big-Boss, PFS, etc.) and from space (Euclid) • Narrow field facilities for deep surveys (VLT, ALMA, JWST, etc.).

  22. SF2A, Marseille 17 May 2012 LIA-Origins Workshop 2012

  23. A dynamical measurement ofthe expansion history of the Universe • 4000 hours over 20 years willunequivocallyprove the existence of darkenergywithoutassumingflatness, usinganyothercosmologicalconstraints or makinganyotherastrophysicalassumptionwhatsoever. • Providesindependent confirmation of SNIaresults, using a different method and a complementaryredshift range. 27 LIA-Origins Workshop 2012

  24. Some numbers • 984 /1148 segments • Industrial challenge for manufacturing • ~ 2 segments to coat per day • 6-m active M2 • 2.5-m Adaptive M4 and Tip-tilt M5 • 4500 tons SF2A, Marseille

  25. TMT

  26. 1.0 m/s HARPS Exoplanets Direct Detection High contrast imaging, extreme Adaptive Optics ESO Design Reference Mission Doppler detection down to ~ 1cm/s SF2A, Marseille