1 / 18

Southern Morava Region Sewerage and Wastewater Treatment Master Plan

Preparation of a Sewerage & Wastewater Strategic Master Plan for the Southern Morava Region and Tender Documents for Construction of a "Model" WWTP An EU funded project managed by the European Agency for Reconstruction.

jake
Download Presentation

Southern Morava Region Sewerage and Wastewater Treatment Master Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparation of a Sewerage & Wastewater Strategic Master Plan for the Southern Morava Region and Tender Documents for Construction of a "Model" WWTP An EU funded project managed by the European Agency for Reconstruction Izrada Strateškog plana razvoja kanalizacione mreže i tretmana otpadnih voda u slivu Južne Morave i priprema tenderske dokumentacije za konstrukciju “Modela” postrojenja za preradu otpadnih voda Projekat je finansiran od strane Evropske Unije pod upravom Evropske Agencije za Rekonstrukciju Southern Morava Region Sewerage and Wastewater Treatment Master Plan

  2. Project Area: Southern Morava Region Sewerage and Wastewater Treatment Master Plan Područje projekta:

  3. Characteristics of the Project Area: About 16,000 km2 About 1 million inhabitants 25 Municipalities 24 Named Urban Centres About 100 major industries Karakteristike projektnog područja: Oko 16 000 km2 Oko milion stanovnika 25 opštine 24 gradska centra Oko 100 većih industrijskih pogona Southern Morava Region Sewerage and Wastewater Treatment Master Plan

  4. Project Objectives: To strengthen the protection of water resources, water quality and public health Provision of improved conditions for increased investment in wastewater treatment and sewerage, and protection of ground and surface water Project Outputs Sewerage and Wastewater Treatment Master Plan WWTP Design and Tender Documents Ciljevi projekta: - Povećati zaštitu izvora vode, kvalitet vode i javnog zdravlja - Obezbediti bolje uslove za veća ulaganja u sisteme za prečišćavanje otpadnih voda i kanalizaciju i zaštitu podzemnih i površinskih voda Rezultati projekta - Strateški plan razvoja kanalizacije i tretmana otpadnih voda - Izrada tehničke dokumentacije postrojenja za preradu otpadnih voda i priprema tenderske dokumentacije Southern Morava Region Sewerage and Wastewater Treatment Master Plan

  5. Full Master Plan ready for financing GIS based data base for whole region Preliminary design of priority investments Design Manual for good practice Detailed design for small WWTP Potpun Strateški plan spreman za finansiranje GIS baza podataka za čitavo područje Preliminarni projekat o prioritetnim ulaganjima Smernice za pripremu tehničke dokumentacije Glavni projekat za manje prostrojenje za prečišćavanje otpadanih voda Major Outputs Glavni rezultati

  6. 2 years Project office in Nis Permanent staff of 8 Total staff of 49 20 international experts 21 Serbian experts 2 godine Projektna kancelarija u Nišu 8 osoba sa stalnim angažmanom tokom projekta Ukupan broj angažovanih na projektu je 49 20 medjunarodnih stručnjaka 21 stručnjak iz Srbije Southern Morava Region Sewerage and Wastewater Treatment Master Plan

  7. Main findings: 50% of the population connected to sewer systems In total 1,085 km of primary sewers. 29 pumping stations 5 wastewater treatment plants with capacity of 49,000 PE (5% of the total domestic wastewater flow) Three plants need major reconstruction Najbitniji zaključci: - 50% stanovništva povezano na kanalizacioni sistem - ukupna dužina primarne mreže iznosi 1 085km - ukupno postoji 29 pumpnih stanica - postoji 5 postrojenja za prečišćavanje otpadne vode kapaciteta 49 000 ES (5% ukupne količine otpadne vode iz domaćinstava) - potrebna kompletna rekonstrukcija tri (3) postrojenja za prečišćavanje Southern Morava Region Sewerage and Wastewater Treatment Master Plan

  8. Future Requirements 60 projects identified Future wastewater load in project area: 250,000 m3/day 1.1 million PE 21 wastewater treatment plants 105 pumping stations 749 km of connecting sewers Investments needed 300 million Euros for the master plan 200 million Euros for local sewer networks Buduće potrebe Identifikovano 60 projekata Buduće opterećenje otpadnom vodom na području projekta: - 250 000 m3/dan - 1,1 milion ES 21 postrojenje za prečišćavanje 105 pumpnih stanica 749 km primarne kanalizacione mreže Potrebne investicije - 300 miliona Evra za master plan - 200 miliona Evra za lokalne kanalizacione mreže Southern Morava Region Sewerage and Wastewater Treatment Master Plan

  9. Ranking of Projects Phase 1: 0-5 years Phase 2: 6-15 years Phase 3: 16-25 years Rangiranje projekata - Faza 1: 0-5 godina - Faza 2: 6-15 godina -Faza 3: 16-25 godina Southern Morava Region Sewerage and Wastewater Treatment Master Plan

  10. Methodology used for ranking Multi Criteria Analysis (MCA) Costs Environment and Hygiene Social aspects Southern Morava Region Sewerage and Wastewater Treatment Master Plan Primenjena metodologija pri rangiranju • Višekriterijumska analiza (VA) • Troškovi • Životna sredina i higijena • Socijalni aspekti

  11. Southern Morava Region Sewerage and Wastewater Treatment Master Plan Top-10 results

  12. Phase 1: Prokuplje Niš Leskovac Pirot Vranje 105,000,000 Euro Faza 1: Prokuplje Niš Leskovac Pirot Vranje 105,000,000 Euro Southern Morava Region Sewerage and Wastewater Treatment Master Plan

  13. Southern Morava Region Sewerage and Wastewater Treatment Master Plan Thank You Hvala

More Related