objective ity adq
Download
Skip this Video
Download Presentation
Objective ITY-ADQ

Loading in 2 Seconds...

play fullscreen
1 / 16

Objective ITY-ADQ - PowerPoint PPT Presentation


  • 102 Views
  • Uploaded on

Objective ITY-ADQ. ESSIP Plan 2013. Ana Paula FRANGOLHO DSS/EIPR 13.09.2013. Objective ITY-ADQ. Introduction Explanation and scope Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material Implementation Support

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Objective ITY-ADQ' - iona


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
objective ity adq

Objective ITY-ADQ

ESSIP Plan 2013

Ana Paula FRANGOLHO

DSS/EIPR

13.09.2013

objective ity adq1
Objective ITY-ADQ
  • Introduction
  • Explanation and scope
  • Link to European ATM Master Plan
  • Most important SLoA(s)
  • Finalisation Criteria and Closed Questions
  • Supporting Material
  • Implementation Support
  • Objective Coordinator’s Analysis & Conclusions
  • Links and contacts

ESSIP Plan 2013 / Objective ITY-ADQ

why an ity adq essip objective
Why an ITY – ADQ ESSIP objective?

ESSIP Plan 2013 / Overview LSSIP 2012

explanation and scope
Explanation and scope
  • ITY ADQ was derived from Regulation (EU) No 73/2010 of 26 January 2010 laying down requirements on the quality of aeronautical data and aeronautical information (Official Journal L23/6, dated 27.01.2010);
  • The aim is to improve the quality of aeronautical data/information in terms of accuracy, resolution and integrity;
  • In accordance with [Article 2(3)] it applies up to the moment when the aeronautical data and/or aeronautical information are made available by the aeronautical information service provider to the next intended user.

ESSIP Plan 2013 / Overview LSSIP 2012

explanation and scope1
Explanation and scope
  • It applies to EATMN systems, their constituents and associated procedures involved in the origination, production, storage, handling, processing, transfer and distribution of aeronautical data/information [Article 2(1)]
  • Following aeronautical products made available by Member States are included [Article 2(1)]:
  • Integrated Aeronautical Information Package (IAIP), with the exception of aeronautical information circulars;
  • Electronic obstacle and electronic terrain data or elements thereof;
  • Aerodrome mapping data.

ESSIP Plan 2013 / Overview LSSIP 2012

explanation and scope2
Explanation and scope
  • In accordance with [Article 2(2)] it applies to:
    • ANSPs and AIS Providers;
    • Operators of those aerodromes and heliports for which IFR or Special-VFR procedures have been published in national aeronautical information publications;
    • Public or private entities providing:
      • Services for the origination and provision of survey data;
      • Procedure design services;
      • Electronic terrain data;
      • Electronic obstacle data.

ESSIP Plan 2013 / Overview LSSIP 2012

ity adq essip ir 73 2010
ITY-ADQ ESSIP & IR 73/2010

Key obligations

Affected

Parties

ADQ IR 73/2010

Chapter I

General Provisions

NSA

Implement data quality and processrequirements

Chapter II

Interoperability &

Performance

ANSP/AISP

APO

Establish formal arrangements

Chapter III

Quality, Safety

Security Req.

Translated into

Public & Private

entities

Establish consistency mechanisms and implement timeliness requirements

Chapter IV

Conformity &

Additional Req.

ITY-ADQ ESSIP

Implement personnel

performance requirements

Chapter V

Final Provisions

StakeholderLines of Action

Implement a QMS fulfill safety & security objectives

Annexes

Supporting

material

Implement common dataset digital exchange

What?

Ensure Compliance…

How?

Measurable

finalisation

criteria

Implement all data requirements

ESSIP Plan 2013 / Overview LSSIP 2012

link to european atm master plan

Improved Supply Chain for Aeronautical Data through Common Quality Measures

IS

0202

AIMS

13

Controlled and Harmonised Aeronautical

Information Network Activity

Facilitated Aeronautical Data Exchangesthrough Digitalised Information

IS

0204

Link to European ATM Master Plan

ESSIP Plan 2013 / Overview LSSIP 2012

sloas

ITY-ADQ

SLoAs

Decompose IR into main legal obligations

Allocate obligations per Stakeholder group

Group necessary actions per Stakeholder

Link them with IR Articles, Annexes and Timing

ESSIP Plan 2013 / Overview LSSIP 2012

most important sloa s
Most important SLoA(s)
  • ASP06 - Implement the common dataset and digital exchange format
  • ASP01 - Implement data quality and process requirements
  • APO04 - Implement the common dataset and digital exchange format requirements
  • APO01 - Implement data quality and process requirements
  • IND04 - Implement the common dataset and digital exchange format requirements
  • IND01 - Implement data quality and process requirements
  • REG03 - Verify the compliance with the common dataset specifications and the data exchange format requirements
  • REG01 - Verify the compliance with data quality requirements and supervise safety assessments

ESSIP Plan 2013 / Overview LSSIP 2012

finalisation criteria

ITY-ADQ

Data quality requirements implemented and documented

Safety assessment (1)

EC Declarations & Technical file (2)

Certificates (QMS) issued by third parties

Formal arrangements between parties

Finalisation criteria

Note (1): The supporting material indicated in objective SRC-CHNG (Implementation of Safety Oversight of Changes to ATM by NSA) is relevant for the safety assessment

Note (2): EC declarations forms are made available at: http://www.eurocontrol.int/ses/public/standard_page/ca_guidance.html

ESSIP Plan 2013 / Overview LSSIP 2012

closed questions finalisation criteria
Closed Questions/Finalisation Criteria
  • Closed questions included in the database are coming from the finalization criteria in the form of a direct question

ESSIP Plan 2013 / Overview LSSIP 2012

supporting material

ITY-ADQ

Supporting Material

Non-Mandatory: EUROCONTROL Specifications

Non-Mandatory: EUROCONTROL Guidelines

Non-Mandatory: Material i.e. ISO Standards

ESSIP Plan 2013 / Overview LSSIP 2012

implementation support
IMPLEMENTATION SUPPORT
  • The EUROCONTROL ADQ Implementation Support Cell was set up to assist the States with the implementation of the Aeronautical Data and Information Quality (ADQ) implementing rule in the following keys areas:
  • Support to the establishment and provision of means of compliance;
  • Support to the implementation of the provisions of the implementing rule;
  • Support to the National Supervisory Authorities;
  • Support to the overall implementation and compliance monitoring process.Any question with regard to the ADQ IR can be addressed to the Implementation Support Cell at:

[email protected] or Tel: +32 2 729 9818

ESSIP Plan 2013 / Overview LSSIP 2012

objective coordinator s analysis conclusions
Objective Coordinator’s Analysis & Conclusions
  • New objective based on a complicated regulation to address/solve a data quality problem
  • Challenging for implementation due to the large spectrum of data/information
  • May imply significant investments and/or adaptations of existing systems
  • Involves a large group of stakeholders including industry/manufacturers
  • Too much regulation and many administrative tasks (overregulation?) required

ESSIP Plan 2013 / Overview LSSIP 2012

links and contacts
Links and contacts
  • Objective Coordinator: FrangolhoA-P., +32 2 729 4702

[email protected]

Alfaro Oscar, +32 2 729 4665

[email protected]

  • DSS Objective Expert(s): Unterreiner M., +32 2 729 [email protected]
  • Implementation Support Cell: Tel: +32 2 729 9818

[email protected]

ESSIP Plan 2013 / Overview LSSIP 2012

ad