1 / 13

ADQ Implementation Support Cell

ADQ Implementation Support Cell. ADQ Implementation Workshop. Miguel Rodrigues Paulo ADQ ISC 28-29 May 2013. + 32 2 7299818 adq@eurocontrol.int www.eurocontrol.int/adq. ADQ Implementation Support Cell. Focal Point Awareness and Training Web Site ADQ Guide Specifications and Guidelines.

darice
Download Presentation

ADQ Implementation Support Cell

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ADQ Implementation Support Cell ADQ Implementation Workshop Miguel Rodrigues Paulo ADQ ISC 28-29 May 2013

  2. + 32 2 7299818 adq@eurocontrol.int www.eurocontrol.int/adq ADQ Implementation Support Cell • Focal Point • Awareness and Training • Web Site • ADQ Guide • Specifications and Guidelines ADQ Implementation Support Cell

  3. Essential Requirements EU Regulation 552/2004 (interoperability) Directly applicable law in Member States Implementing Rules EU Regulation 73/2010 (aeronautical data quality) Latest compliance: for data published before 1 July 2013and not amended ERs Apply from IRs Derogations: Data Set and Exchange format 30th June 2017 1st July 2013 Community Specifications Publication in OJEU 1st July 2014 27th January 2010 Regulation Framework and Dates Single European Sky Framework ADQ Implementation Support Cell

  4. Integrated aeronautical information package Electronic obstacle data ANSP’s Originators and providers of survey data Electronic terrain data Aerodrome mapping data Regulated Parties Operators of aerodromes and heliports with IFR (or special VFR) procedures Providers of electronic obstacle data Procedure design services Providers of electronic terrain data Regulation Scope “[…] EATMN systems, their constituents and associated procedures […]” Article 2(2) regulated parties Article 2(1) aeronautical data and aeronautical information ADQ Implementation Support Cell

  5. MOC: AIX MOC: AIX MOC: AIX RegulatoryProvisions(interoperability & performance) MOC: DQR • DATA QUALITY REQUIREMENTS: • Accuracy • Resolution • Integrity • Timeliness NEXT INTENDED USER COMMON DATA SET COMMON EXCHANGE FORMAT COMMON DATA SET ANSP ANSP MOC: eAIP AERODROME Evidence Requirements Tools and Software DATA ORIGINATOR Automation Error Report and Feedback MOC: CRC Personnel MOC: DO Consistency MOC: DAL ADQ Implementation Support Cell

  6. EUROCONTROL Specifications • EUROCONTROL Specification for the electronic Aeronautical Information Publication (eAIP), Edition 2.0 published 14/02/2011 • Natural evolution from the informal 1.0 specification • EUROCONTROL Specification for Data Assurance Levels (DAL), Edition 1.0 published 15/03/2012 • A qualitative method for data quality assurance (process definition approach) • EUROCONTROL Specification for Aeronautical Information Exchange (AIX), Edition 1.0 published 14/12/2012 • Standalone or making a possible bridge to the AIXM 5.1 standard • EUROCONTROL Specification Data Quality Requirements (DQR), Edition 1.0 published 18/01/2013 • Based on ICAO data quality requirements and prepared for evolution • EUROCONTROL Specification for the Origination of Aeronautical Data (DO), Edition 1.0 published 04/02/2013 • Volume 1: Compliance Material, a matrix to the provisions • Volume 2: Guidance Material, an evolution from the WGS 84 Manual ADQ Implementation Support Cell

  7. How to access ADQ documents? http://www.eurocontrol.int/adq http://www.eurocontrol.int/lists/publications/all-publications ADQ Implementation Support Cell

  8. Overall Implementation Issues observed • Data Originators • Identification and formal arrangements • Interface • Common data set and direct electronic connection • Non regulated data originators • Safety Assessment • Specific for aeronautical data systems • Tools and Software • Large number of tools • Software safety assurance • Long procurement processes • Implementation Dates • Too challenging • Conformity Assessment • When needed? • Who does what? ADQ Implementation Support Cell

  9. Conformity Assessment Conduct verification of the systems NOTIFIED BODY SYSTEM OR CONSTITUENT MANUFACTURER ANSP Conduct verification of the systems Assess conformity or suitability for use NSA EC DECLARATION OF SUITABILITY FOR USE EC DECLARATION OF VERIFICATION OF SYSTEMS ADQ Implementation Support Cell

  10. ADQ Regulators Working Group (ARWG) • Established in February 2011 • “An opportunity to create synergies among the national bodies (Regulators, NSAs, CAAs) involved in the oversight of the implementation of the Regulation (EU) 73/2010 (ADQ) and it is believed to be a crucial contribution to achieve a common understanding of the provisions of the regulation.” • 2/3 meetings per year • 21 States already represented • Tour de Table ADQ Implementation Support Cell

  11. Legal issues identifiedCommon understanding achieved • VFR Aerodromes • data related with VFR Aerodromes, even if published in the AIP, is outside the scope of the ADQ IR. • Data Protection • allow the implementation of data integrity protection through the use of alternative and equivalent standards other than the CRC32Q • Scope of the Regulation • quantifiable data quality requirements for accuracy, resolution and integrity, as required by Article 6(1), apply only to a sub-set of data items. However, the scope of the remaining provisions shall include all of the aeronautical data and aeronautical information that is referenced on the second sub-paragraph of Article 2(1) • Possible modifications • collected a list of possible modifications to the Regulation, mainly references and definitions • Terrain Exchange Formats • recognised that the existing formats do not fully meet the requirements of the ISO 19100 series as required by ADQ • endorsed the activity of the TOD WG in identifying the user preferred terrain formats ADQ Implementation Support Cell

  12. Legal issues identifiedUnder discussion • NOTAMs • “Regulation (EU) No 73/2010 apply to the NOTAM, except when to do so will inhibit the distribution of aeronautical information necessary to ensure the safety of flight.” • Provision of eTOD • provided by non-regulated parties (e.g. geo institutes) • ADQ inhibiting the provision of eTOD • Implementation Timescales ADQ Implementation Support Cell

  13. ADQ Implementation Support Cell

More Related