RF work plan

RF work plan. Test first large amplifier at Daresbury Electric checks are being made now Driver amplifiers being retested now Expect results mid Dec 09

Download Presentation

RF work plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RF work plan • Test first large amplifier at Daresbury • Electric checks are being made now • Driver amplifiers being retested now • Expect results mid Dec 09 • Study of requirements/desires for MICE hall RF layout, coax systems, component sizes and method to construct under MICE hall floor – starting Jan 10 – report after 3 months • CAD visualisation of RF layout required

  2. If funding allows – rebuild and test of large amplifier 2 beginning April 2010 – 6 months • Disassembly of first large amplifier system and power supplies, transport to RAL, install in MICE hall and prepare for test in area, autumn 2010 • Prepare report into RF layout installation for step 5 and specification of design for step 6 if changes are needed

More Related