Chinese Petroleum Corp.

Taiwan LNG Prospects. -73-. Chinese Petroleum Corp. Contents. Gas Demand/ Supply in 2000 Latest Energy Issues Status of CPC Infrastructure Outlook for LNG Demand & Supply Summary. -74-. Natural Gas Consumption in 2000. Total Consumption : 6.40 Billion M 3. -75-.

hovan
Download Presentation

Chinese Petroleum Corp.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Taiwan LNG Prospects -73- Chinese Petroleum Corp.

  2. Contents • Gas Demand/ Supply in 2000 • Latest Energy Issues • Status of CPC Infrastructure • Outlook for LNG Demand & Supply • Summary -74-

  3. Natural Gas Consumption in 2000 Total Consumption : 6.40 Billion M3 -75-

  4. Natural Gas Supply in 2000 Total Quantity : 6.55 Billion M3 -76-

  5. Existing Long Term Contracts -77-

  6. LNG Imports in Taiwan -78-

  7. Latest Energy Issues • Gas Fired Power Plants IPP • Ever Power : One Unit in operation • TshinTao : to be operated in end Sep. • Chia-hui : Under construction • Kuao-Kuang : Under construction Taipower - Tung-Tsiao : to be fully converted, end 2001 - Ta-Tan : first unit, end 2003 -79-

  8. Latest Energy Issues (Cont.) B. Natural Gas • Northern LNG Receiving Terminal <Ta-Tan Power Project> -80-

  9. Ta-Tan Power Project • Supply Gas from Northern LNG Receiving Terminal Before July, 2007 • Fuel Procurement Through Open Tender • Taipower amended ITB With Deadline on August 16, 2001 -81-

  10. SUB-SEA PIPELINE YUNG-AN to TUNG HSIAO CONTENTS OF GAS INFRASTRUCTURE EXTENSION OF ON-LAND TRUNKLINE -82- UNDERGROUND GAS STORAGE AT TCS EXPANSION OF YUNG-AN TERMINAL FACILITY

  11. Yung-An LNG Receiving Terminal -83-

  12. Status of Expansion Project SUB-SEA PIPELINE - in operation , end of October,2001 IN-LAND TRUNKLINE - fully completed, end 2001 UNDERGROUND GAS STORAGE - completed in end of September, 2001 -84-

  13. LNG DEMAND -85-

  14. Projected Gas Fired Power Plants -86-

  15. Hsinta 2,200 Mw South 1,090 Mw Talin 1,050 Mw Taipower Gas-Fired Power Plants Tatan 4,000 Mw 2002 Tungsiao 1,060 Mw -87- YungAn Terminal

  16. Map of Gas-Fired IPP Ever Power Kuo Kung 960 MW 600 Mw Jun., 2003 Star Energy Hsin Tao 490 Mw Apr., 2004 600 Mw Sep., 2001 -88- YungAn Terminal Chiahui 670 MW Sep., 2003 Sun Ba 980 Mw Apr., 2004

  17. LNG SUPPLY -89-

  18. CPC LNG Swap Deal • SWAP : Chubu Electric/ CPC, 4 cargoes in 2000, 2 in 2001 • Redirection : KOGAS/ CPC 2 Cargoes in 2000, 3 in 2001 • Time Swap : KOGAS/ CPC 1 cargo in March & April, 2001 • Spot Sale : OSAKA GAS/ CPC 1 cargo in early April, 2001 -90-

  19. Chinese Petroleum Corp. August 2001 -91- 品質、服務、貢獻