1 / 6

Job Performance Requirement 10-30

Job Performance Requirement 10-30. Setting Up for a Drafting Operation. A The placement of a hard sleeve and strainer directly into a water source requires engine placement near the water source—slightly at an angle. JPR 10-30A. B Connect the hard sleeve to the engine inlet. JPR 10-30B.

hortonr
Download Presentation

Job Performance Requirement 10-30

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Job PerformanceRequirement 10-30 Setting Up for a Drafting Operation

  2. A The placement of a hard sleeve and strainer directly into a water source requires engine placement near the water source—slightly at an angle. JPR 10-30A

  3. B Connect the hard sleeve to the engine inlet. JPR 10-30B

  4. C Attach a strainer and guide rope to the other end of the sleeve. JPR 10-30C

  5. D The hard sleeve and strainer are attached to the pumper’s inlet and the engine moves forward as the crew positions the sleeve into the water. JPR 10-30D

  6. E If a non-floating strainer is used, the rope also keeps the strainer from resting on the bottom. Non-floating strainers should be well under the water’s surface to prevent drawing in of air. When in place, the engine is stopped, the line is secured, and drafting operations begin. JPR 10-30E

More Related