Rural Water Programme 2006 Evaluation of Progress John Fitzgerald Engineering Inspector - PowerPoint PPT Presentation


  • 94 Views
  • Uploaded on

Rural Water Programme 2006 Evaluation of Progress John Fitzgerald Engineering Inspector. Procurement Guidance Documents. Part A: Rural Water Modulw (DBO) Part B: Small Wastewater Projects Part C: Small Water Supply Projects. Part C: Small Water Supply Projects.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Rural Water Programme 2006 Evaluation of Progress John Fitzgerald Engineering Inspector' - hilda-warren


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Rural Water Programme

2006

Evaluation of Progress

John Fitzgerald

Engineering Inspector


Procurement Guidance Documents

Part A: Rural Water Modulw (DBO)

Part B: Small Wastewater Projects

Part C: Small Water Supply Projects


Part C: Small Water Supply Projects

Chapter 12: Conventional Procurement for GWSS


Prior to Group employing Consulting Engineer Local Authority will

(a) Prepare Brief

(b) Determine indicative scale of fee acceptable for grant purposes – if scheme advances to construction.


Scale of fees: will

(a) Fee per member for preparation of design drawings and calculations still valid.

(b) Scale of fees based on Circ. 11/87

Preliminary Report 0 – 20%

Design and Tender Drawings. Up to 30%

Conditions of Contract / Specifications. 0 – 20%

Construction Stage. 0 – 30%

(c) PSDS accures separate fee.

(ACEI scale of fee dated 9/2/96)


OJEU will

OJEU

National

Newspapers

National

Newspapers

Three Prices

Three Prices

One Price

One Price

L. Doyle

Services

The Procurement “Goalposts”

Waste Water

Directive 04/18/EC

Water

Directive 04/17/EC

€ 422,000

€ 211,000

€ 127,000

€ 12,700


L. Doyle will

The Procurement “Goalposts”

Works

Waste Water

Directive 04/18/EC

OJEU

€ 5,278,000

National

Newspapers

Water

Directive 04/17/EC

€ 127,000

Three Prices

€ 12,700

One Price


Water Quality will

Water Conservation


New & Upgrade (85%) will

Takeover (100%)


DBO will

Civil (85%)

M&E (100%)


Metering grants for DBO willonly.

Universal Metering

Domestic (85% grant subject to max €300)

Non-domestic (85%) grant subject to max €250)

Additional CLAR funding


ad