Rural Water Programme
This presentation is the property of its rightful owner.
Sponsored Links
1 / 11

Rural Water Programme 2006 Evaluation of Progress John Fitzgerald Engineering Inspector PowerPoint PPT Presentation


  • 78 Views
  • Uploaded on
  • Presentation posted in: General

Rural Water Programme 2006 Evaluation of Progress John Fitzgerald Engineering Inspector. Procurement Guidance Documents. Part A:Rural Water Modulw (DBO) Part B:Small Wastewater Projects Part C:Small Water Supply Projects. Part C: Small Water Supply Projects.

Download Presentation

Rural Water Programme 2006 Evaluation of Progress John Fitzgerald Engineering Inspector

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Rural water programme 2006 evaluation of progress john fitzgerald engineering inspector

Rural Water Programme

2006

Evaluation of Progress

John Fitzgerald

Engineering Inspector


Rural water programme 2006 evaluation of progress john fitzgerald engineering inspector

Procurement Guidance Documents

Part A:Rural Water Modulw (DBO)

Part B:Small Wastewater Projects

Part C:Small Water Supply Projects


Rural water programme 2006 evaluation of progress john fitzgerald engineering inspector

Part C: Small Water Supply Projects

Chapter 12: Conventional Procurement for GWSS


Rural water programme 2006 evaluation of progress john fitzgerald engineering inspector

Prior to Group employing Consulting Engineer Local Authority will

(a)Prepare Brief

(b)Determine indicative scale of fee acceptable for grant purposes – if scheme advances to construction.


Rural water programme 2006 evaluation of progress john fitzgerald engineering inspector

Scale of fees:

(a)Fee per member for preparation of design drawings and calculations still valid.

(b)Scale of fees based on Circ. 11/87

Preliminary Report 0 – 20%

Design and Tender Drawings. Up to 30%

Conditions of Contract / Specifications. 0 – 20%

Construction Stage. 0 – 30%

(c)PSDS accures separate fee.

(ACEI scale of fee dated 9/2/96)


Rural water programme 2006 evaluation of progress john fitzgerald engineering inspector

OJEU

OJEU

National

Newspapers

National

Newspapers

Three Prices

Three Prices

One Price

One Price

L. Doyle

Services

The Procurement “Goalposts”

Waste Water

Directive 04/18/EC

Water

Directive 04/17/EC

€ 422,000

€ 211,000

€ 127,000

€ 12,700


Rural water programme 2006 evaluation of progress john fitzgerald engineering inspector

L. Doyle

The Procurement “Goalposts”

Works

Waste Water

Directive 04/18/EC

OJEU

€ 5,278,000

National

Newspapers

Water

Directive 04/17/EC

€ 127,000

Three Prices

€ 12,700

One Price


Rural water programme 2006 evaluation of progress john fitzgerald engineering inspector

Water Quality

Water Conservation


Rural water programme 2006 evaluation of progress john fitzgerald engineering inspector

New & Upgrade(85%)

Takeover(100%)


Rural water programme 2006 evaluation of progress john fitzgerald engineering inspector

DBO

Civil (85%)

M&E(100%)


Rural water programme 2006 evaluation of progress john fitzgerald engineering inspector

Metering grants for DBO only.

Universal Metering

Domestic (85% grant subject to max €300)

Non-domestic (85%) grant subject to max €250)

Additional CLAR funding