An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HANDBOOK OF SOLAR POWER PLANT UIC APS H409 • Steel Purlin • Field Application • Piling System • 4x9(36) Horizontal Module 1

  2. UIC APS H409 Material List No PARTS CODE DESCRIPTIONS TOTAL QTY (Pcs) LENGTH (mm) 1 KL 1 SHORT COLUMN 6 2 KL 2 TALL COLUMN 6 3 KR BEAM 6 4 AS PURLIN 5 5 PY BRACKET - 6 DC CROSS BEAM 6 7 ASK PURLIN CONNECTOR 30 8 MID MID CLAMP 54 9 END END CLAMP 36 10 CSP BOLT +NUT + WASHER - 11 12 13 14 15 2

  3. UIC APS H409 Assembly Sequence Piling Montage 3

  4. UIC APS H409 Assembly Sequence . PV Module Montage 4

  5. Assembly Procedure Piling • Locate coordinates of each string’s start and end points. • Stretch a string between two posts. • Measure and mark on the string each column’s position with a tape. • Place a mark on column which indicates the level should be on string line. • Check the project and make sure the direction of C profile is whether facing to east or west. • Pile every column by paying attention of its verticality and stop piling when the mark is at the level of string. . Mounting Steel Components • Place the beams and put bolts, nuts and washers in position as shown in project. • Fasten bolts with hand. • Complete putting parts in place by sequence of; beams-brackets-purlins-cross beams. • Measure diagonal dimensions of plane of purlins where modules going to be placed. Make sure that it is exactly rectangular. • Fasten bolts by using torque wrench . Apply torques shown in the torque chart below. • Avoid using wrong size and uncoated items. 4

  6. Assembly Procedure PV Module Installation • Put all aluminium clamps in place and tack bolts by hand. • Start putting PV modules at the lower corner of desk. And do it same with several desks same time before start putting the rest of the PV modules. • Use string to see straightness through east-west direction. • Put PV modules inside of clamps and make sure they fit inside well and no blank space between module and clamp. • Fasten bolts precisely according to torque chart below. . 4

  7. Assembly Procedure Bolts Torque Chart . 4

  8. BGS APS H410 03186 M.KYIV BULVAR JOKOLOIVSKII BUDINOK:19 KYIV /UKRAINE www.uicrenewable.com 5