1 / 36

Designing the Zero Energy House

Designing the Zero Energy House. Marcie Meditch - AIA & Mike Binder – Assoc. AIA, LEED-AP. Who We Are. Meditch Murphey Architects is a small firm based in Chevy Chase, MD. Mostly single family homes but expanding into multi-family housing, small commercial and institutional projects.

hedwig
Download Presentation

Designing the Zero Energy House

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Designing the Zero Energy House Marcie Meditch - AIA & Mike Binder – Assoc. AIA, LEED-AP Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  2. Who We Are • Meditch Murphey Architects is a small firm based in Chevy Chase, MD. • Mostly single family homes but expanding into multi-family housing, small commercial and institutional projects. • Commitment to sustainable design that is comfortable, beautiful and affordable. Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  3. What IS Zero-Energy? • Goal : House is designed to produce as much energy as it consumes on yearly basis. • The power grid is our storage system. Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  4. Our Motivation Chesapeake Zero • To prove that a zero-energy, market-viable speculative house is possible. • Cost competitive • Beautiful • Sustainable • Because American energy independence is important. • Because a healthy natural environment is important Bethesda Zero Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  5. How to achieveZero-Energy • Highly Insulated, Tightly Sealed Envelope • High Efficiency Mechanical System • High-Efficiency Appliances • Taking Advantage of Free Energy • Solar Power – Heat and Electricity Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  6. Beyond Zero-Energy • Water efficiency • Sustainable materials • LEED-H Platinum Rating • Leadership in Energy & Environmental Design for Homes. • Levels (high to low) • Platinum • Gold • Silver • Certified • EnergyStar Home • Public Outreach and Education • Market Viability Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  7. Design Process • Integrated Design Team • Architect • Owner • Builder • Mechanical Electrical and Plumbing Engineer (MEP) • Structural Engineer • Civil Engineer • Landscape Architect • LEED Consultant/Green-Rater • Sustainability from Day-1 • Staying focused on goals • Accepting trade-offs • Energy vs. water vs. materials • Sustainability vs. cost • Up-front vs. recurring costs • Exploit synergy, know when to stop Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  8. The Architectural Design • Comfort • Aesthetics • Efficiency • Sustainability • Cost • Context Living room & Dining room viewed from Kitchen First floor Second floor Kitchen viewed from Dining Room Front of house with entry and pergola. Solar array Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  9. T2 32 29 Site Selection • Infill vs. Virgin Territory • Public Amenities • Transportation 1/4 mi 1/2 mi Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  10. Walt Whitman Senior High School Community Clubhouse Bannockburn Elementary School Community Pool Glen Echo Park Site Selection • Infill vs. Virgin Territory • Public Amenities • Transportation • Community Services Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  11. Site Selection • Infill vs. Virgin Territory • Public Amenities • Transportation • Community Services • Greenspace CLUBHOUSE PARK Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  12. Site Selection • Infill vs. Virgin Territory • Public Amenities • Transportation • Greenspace • Community Services • House Orientation for optimum solar income: • Passive solar design • Solar hot-water and Electricity. Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  13. Building Demolition & Construction Waste • Neighbors offered materials from existing house • Cabinets, • Flooring • Fixtures • Windows & Doors • Contractor salvaged all usable materials for reuse/recycling. • Very little waste sent to landfill. • Framing lumber being ordered to minimize waste. • All waste is being tracked. • Waste materials will be sorted and recycled to greatest degree possible. Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  14. Envelope – Insulation • The cheapest energy to buy is the energy you don’t use. • Continuous Air-Barrier, sealed at all openings and edges. • Basement walls : R-20 (R-13 by code) • Slab : R-10 • Wall : R-33 (R-19 by code) • Roof : R-50 (R-30 by code) • High-reflectivity roofing to reduce heat island Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  15. Envelope – Windows • Windows/Doors • U-factor = 0.32 (R3) • Solar Heat Gain Coeff. (SHGC) = 0.28 Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  16. Envelope – Windows • Windows/Doors • U-factor = 0.32 (R3) • Solar Heat Gain Coeff. (SHGC) = 0.28 • Limit East and West facing Glass • At least 50% more glass on North and South than on East and West. • Shade South-facing Windows and Doors • exclude heat in summer, admit it in winter SOUTH Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  17. EAST WEST NORTH SOUTH • Limit East and West facing Glass • At least 50% more glass on North and South than on East and West. Envelope – Windows Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  18. Envelope – Sustainable Materials • Framing : FSC if you can afford it… we couldn’t. • Soy-based foam insulation • Local or recycled gypsum • Local, recycled, reclaimed or FSC siding. • Reclaimed buildings • Low VOC sealants FOREST STEWARDSHIP COUNCIL Certified Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  19. Passive Mechanical Systems – Nature’s Services • Natural ventilation during swing months • Operable windows • Cross-ventilation • Timed or Humidistat controlled fans in bathrooms. • Awnings and trees reduce cooling requirements in summer. • South orientation allows for some passive heating in winter. Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  20. ZONE 1 ZONE 2 ZONE 3 ZONE 4 BASEMENT Active Mechanical Systems – Heating & Cooling • Geothermal – Ground Source Heat Pump • Energy Recover Ventilator • Sealed duct work, all INSIDE the Envelope. • Mechanical Ventilation – “seal tight, ventilate right” – 0.35 air changes per hour. • House zoned to allow upstairs and basement to be ‘shut down’ when not in use. Master bedroom is also a separate zone for day-night differential control. Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  21. Appliances • EnergyStar Appliances • Refrigerator • Convection ovens • Induction cooktop • Dishwasher • Clothes Washer (no dryer is energy efficient – consider clothesline instead) • Compact Fluorescent (CFL) and LED Lights, EnergyStar Ceiling Fans. • Gas fireplace w/ Electronic Ignition Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  22. Power Generation • 9.5 kW Photovoltaic array • Goal: 100% of annual electricity needs • 49 panels on the roof • Two inverters in the basement • Grid tied : power grid is our storage system • Solar Hot Water system • Goal: 85% of hot water needs • 2 flat panel panels on roof (tubes another option) • 120 gallon pre-heat tank in basement Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  23. Energy Balance • Zero was our goal, but don’t have to go that far to save money and the environment. • High efficiency envelope, HVAC and appliances cuts demand to manageable level. • Cut usage first before buying more PV panels. • Knowing when to stop – the better it is, the harder it is to improve. Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  24. s s s Motion Sensor Motion Sensor Motion Sensor tub shower sink sink warm water recirculates in cold water line RECIRCULATION PUMP Hot water heater Water Efficiency • No irrigation system required. Plants are drought tolerant. • Low-flow fixtures • 1.75 gpm shower head • 1.5 gpm lavatory faucets • 1.1 gallon per flush toilets • Clothes Washer – Water Factor ≤ 5.5 • Recirculation pump – water recirculated to tank until desired temperature is reached. • Fixture-by-fixture graywater reuse – had to delete because of county permit trouble. • Still considering rainwater harvesting AQUS system from AquaPro Solutions Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  25. Finish Materials – Sustainability • LEED Recognizes following materials as ‘environmentally preferred’: • FSC Certified (Forrest Stewardship Council) • Recycled (including rubber) • Reclaimed • Local • Rapidly Renewable (bamboo, linoleum) • Low VOC (Volatile Organic Compounds). • No urea-formaldehyde • No exotic woods • Durability – more about how and where materials are installed than materials themselves. Ray Amos – New Oxford Studios Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  26. Finish Materials on Our project • No added urea-formaldehyde in anything • Low VOC paints, sealants, adhesives. • Hard-floors instead of Carpet • FSC / reclaimed / local Hardwoods • Engineered wood • Linoleum • Rubber • Cabinets • FSC / reclaimed / local woods • NOT planned • FSC framing or trim • Window / Door framing – hard to get. Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  27. Landscaping • Keeping rainwater on-site • Nearly 100% Pervious surfaces. • Light colored surfaces to reduce heat island effect • Rainwater harvesting (still being considered) • Bioswales (not planned) • Green Roof (planned as an OPTION) Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  28. Landscaping • Shading the House (but not the panels) • Saving potable water • 100% Drought tolerant • High-efficiency irrigation system (we need NO irrigation system) • Native Species Only • Protecting house • No materials that attract termites within 2 ft. of house. • Minimize site disturbance, add plantings to eliminate erosion. Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  29. Cost Advantages of Green Building • Basically prepaying your energy bills for next 25 years. • It’s (relatively) inflation-proof • It’s deductible • Comfort • Sustainable materials are healthier for you and your family to live with. • Tight, energy-efficient construction is more comfortable to live in (when properly designed). • Grants and Tax Rebates • Federal • State • Local • Cooperatives offer additional discounts. http://www.dsireusa.org/ Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  30. ROI on Green Building • One Example • $11,900 added cost • $1000 added mortgage payments per YEAR • $1,900 utility savings per year • About $900 / year ROI Near net-zero house in Massachusetts courtesy Steven Winters Associates Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  31. LEED-H • Administered by U.S. Green Building Council (USGBC). • Considered by many to be the de-facto standard for green home construction • LEED-H is administered by approved network of Green Raters. • Other standards exist • EnergyStar (U.S. EPA) • NAHB (National Association of Home Builders). • Others? Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  32. LEED-H – Cost trade-offs • Bragging rights • Marketing tool for sale / resale • Can definitely add to cost, may save money in long run. Really depends. • Point system seems odd at times: • Skewed in places : same points for shoe rack as for all FSC framing. • No-irrigation landscape earns less points than high-efficiency irrigation system. • Tends to suppress innovation. • Zero-energy design not rewarded. Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  33. LEED-H – Our score • Going for PLATINUM (102.5 points), might settle for GOLD. Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  34. Summary – the Fundamentals • Site selection • Energy efficiency • Water efficiency • Sustainable materials • Recycled • Reclaimed • Local • Certified • Demolition and construction waste management. Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  35. Summary • Have to decide what’s important to you. Setting priorities and limits. • Synergy and Holistic design – Look for opportunities to achieve multiple goals with one solution. • Explore LEED but be open to other options too. • You want something that you will love and which will enrich the community. This is why Architects are especially important. • The Zero Energy House Project embodies all these principles and is at frontier of market-rate speculative house construction. Webcam image April 13, 2009 8:21 AM Making Progress Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

  36. Shameless Plug • For more information, visit our website at www.meditchmurphy.com • If you are looking for a good and green architect for • New construction • Additions • Renovations CALL Meditch Murphey Architects @ (301) 657-9400. Meditch Murphey Architects 6900 Wisconsin Ave – Suite 500 phone: (301) 657-9400 Bethesda, MD 20815 www.meditchmurphey.com

More Related