An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lunar Reconnaissance OrbiterGround System Requirements

  2. LRO Ground System Document Tree(Key Ground System Requirements Documents)

  3. Lunar Reconnaissance Orbiter (LRO)Ground SystemLevel 2 Flow Down KeyRequirements(Ground Networks General Driving Requirements)

  4. Lunar Reconnaissance Orbiter (LRO)Ground SystemLevel 2 Flow Down KeyRequirements(Ground Networks General Driving Requirements)

  5. Lunar Reconnaissance Orbiter (LRO)Ground SystemLevel 2 Flow Down KeyRequirements(White Sands Complex Ground Station Driving Requirements)

  6. Lunar Reconnaissance Orbiter (LRO)Ground SystemLevel 2 Flow Down KeyRequirements(White Sands Complex Ground Station Driving Requirements)

  7. Lunar Reconnaissance Orbiter (LRO)Ground SystemLevel 2 Flow Down KeyRequirements(S-Band Network Ground Station Driving Requirements)

  8. Lunar Reconnaissance Orbiter (LRO)Ground SystemLevel 2 Flow Down KeyRequirements(S-Band Network Ground Station Driving Requirements)

  9. Lunar Reconnaissance Orbiter (LRO)Ground SystemLevel 2 Flow Down KeyRequirements(Emergency/Backup Network Ground Station Driving Requirements)

  10. Lunar Reconnaissance Orbiter (LRO)Ground SystemLevel 2 Flow Down KeyRequirements(Mission Operations Center Driving Requirements)

  11. Lunar Reconnaissance Orbiter (LRO)Ground SystemLevel 2 Flow Down KeyRequirements(Mission Operations Center Driving Requirements)

  12. Lunar Reconnaissance Orbiter (LRO)Ground SystemLevel 2 Flow Down KeyRequirements(Mission Operations Center Driving Requirements)

  13. Lunar Reconnaissance Orbiter (LRO)Ground SystemLevel 2 Flow Down KeyRequirements(Flight Dynamics Driving Requirements)

  14. Lunar Reconnaissance Orbiter (LRO)Ground SystemLevel 2 Flow Down KeyRequirements(Flight Dynamics Driving Requirements)

  15. Ground System Architecture Overview

  16. Ground System Preliminary Verification Approach • Ground system verification and readiness will be performed through a series of ground system verification tests, operations tests and simulations.

  17. A baseline mission concept of operations for the mission and ground system have been developed Current LRO Ground System concept supports the LRO development schedule and Mission concepts Additional ground system reviews will be performed Ground System Requirements Review Ground System Design Review Summary Ground System requirements are sufficiently defined and the design is ready to proceed to detailed ground system requirements and design review