1 / 19

Strengthening National Lab. Network for diagnosis of TB and HIV: Challenges and solutions .

Strengthening National Lab. Network for diagnosis of TB and HIV: Challenges and solutions. Nicholas Wambua MD; MPH; DTCE. Technical Advisor -Tuberculosis CDC –Nairobi WHO/OGAC TB/HIV MEETING KIGALI. Presentation Outline. Overview of TB situation TB laboratory services

harlan
Download Presentation

Strengthening National Lab. Network for diagnosis of TB and HIV: Challenges and solutions .

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Strengthening National Lab. Network for diagnosis of TB and HIV: Challenges and solutions. Nicholas Wambua MD; MPH; DTCE. Technical Advisor -Tuberculosis CDC –Nairobi WHO/OGAC TB/HIV MEETING KIGALI

  2. Presentation Outline • Overview of TB situation • TB laboratory services • Challenges in provision of TB lab services • Possible Solutions

  3. HIV testing in TB sites • Decision on where HIV testing is done depends on: • TB caseload • available manpower • infrastructure • NLTP recommends: • TB Clinic • Next door room • Lab • VCT site • Testing by frontline TB clinicians / nurses/Lab Technicians • Targeting: • TB patient • Ultimately - TB suspect

  4. Results of HIV testing: 2006 • Proportion tested = 60% • HIV prevalence = 52% • On CTX = 80% • On ARVs = 22%

  5. Current Laboratory situation

  6. Funding for TB laboratory services • MOH (NPHLS & NLTP): • Current partners: PEPFAR USAID GFATM MSF WHO/OGAC • Planned Partners: CIDA/KNCV (2007)

  7. Challenges: Availability and accessibility • Inadequate No. of labs • Mal-distribution of laboratories • Inadequate space • Lack of interaction with private sector labs • Insufficient financial resources

  8. Challenges: Human resources • Inadequate human resources at all levels • No career structures and opportunities • Motivation • training

  9. Challenges: Quality Management Systems • Inadequate support supervision • Weak communication between NTP and Lab • Limited implementation of QA system • Poor maintenance of microscopes

  10. Challenges: Weak Central Reference laboratory • Poor coordination (NLTP/NPHL/KEMRI) • Communication • Leadership • Funding • Physical infrastructure • Specimen logistics-transport and tracking • Difficulties in implementing EQA

  11. Solutions: Availability and accessibility • Assess service coverage • Consider pop. distribution, transport, and TB prevalence • Involve private laboratory networks • Encourage use of national SOPs and training modules, supervision and EQA • Include funds for lab expansion in lab budgets

  12. Solutions: Human Resources • Ensure sufficient staffing • Maximize use of existing HR • Provide career opportunities /progression • Improve salaries and work conditions • Training • Ensure current proficiency standards • Training on new techniques

  13. Solutions: Quality Management Systems • Implement a well functioning QA system • Strengthen supervision and management at all levels • Develop a functional and sustainable maintenance system of microscopes

  14. Solutions: Weak Central Reference laboratory • Regular meetings between NTP, CRL • Better planning with involvement of NTP • Include funds for lab expansion in lab budgets

  15. Priorities for FY 08 Human Resources: • Staff training Infrastructure: • Renovations • Purchase of machines/equipment MDR TB • Specimen delivery, tracking and reporting systems • Culture and DST

  16. Priorities for FY 08 Quality Management Systems • Coordination among partners and MOH • National EQA program • Support supervision • M&E

  17. Thank you

More Related