DRHOUSE PROJECT. ACRONYM: DRHOUSE PROJECT NAME: D evelopment of R apid H ighly-specialized O perative U nits for S tructural E valuation FRAMEWORK: Preparatory action on an EU rapid response capability (DG Echo – Civil Protection) STARTING DATE: 1 June 2010

Download Presentation

DRHOUSE PROJECT

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Drhouse project

DRHOUSE PROJECT


Drhouse project

ACRONYM: DRHOUSE

PROJECT NAME:

Development of Rapid Highly-specialized Operative Units for Structural Evaluation

FRAMEWORK:

Preparatory action on an EU rapid response capability

(DG Echo – Civil Protection)

STARTING DATE: 1 June 2010

DURATION: 24 months

EXTENSION: 10 months


Drhouse project

COST OF THE PROJECT: 1.879.664,00 €

EU FUNDINGS (90%): 1.691.697,60 €

COFINANCING (10%): 187.966,40 €


Drhouse project

COORDINATING BENEFICIARY

ASSOCIATED BENEFICIARIES (2)

  • ItalianCivilProtectionDepartment (CPD)

  • EUCENTRE (EUC)

  • Department of Fire, Public rescue and Civil Defence(VVF)


Drhouse project

AIMS

Implementation of a EuropeanCivilProtection “Macromodule” for building damage and safetyassessment and building propping and shoring.

MACROMODULE NAME

BUILD-SAFE

(Request of the Commission)


Drhouse project

AIMS

The macromoduleiscomposed of 3 differentmodules:

BSA=Basic SafetyAssessmentModule

(Residentialbuildings)

Responsible DPC

ASA=Advanced SafetyAssessmentModule

(Strategic buildings)

Responsible EUC

STC=Short TermCountermeasureModule

(Alltypes of buildings, monumental)

Responsible VVF


Drhouse project

COMPOSITION OF THE

BUILD-SAFE MACROMODULE

Pre-Team

MissionLeader

DPC

1

Admin

Log.

S&S

IM

IT

LO

Nurse

Media

DPC

EUC

VVF

Logistic Cell

3~ 5

BSA

ASA

STC

TL

TL

TL

DPC

EUC

VVF

15

15-25

25


Drhouse project

Project Tasks

Task A.Project Management

Task B.Module design and implementation

Task C.Exercise

Task D.Deployment

Task E.Training

Task F.Dissemination

Task G.European network of experts


Drhouse project

Task B. Module design and implementation

B.1 Inventory of resources

B.2 Modulerequirements

B.3 Module Design

B.4 Self-sufficiency

B.5 ASA-BSA-STC interoperability

B.6 SOPs

B.7 Stand-by arrangements


Drhouse project

Task B.4 Selfsufficiency

Lodging (hotel or tent camp)

Food (K-rations, dehydrated,..)

Sanitation

Water (drinkable or not)

Energy (local network or generators)

On site transportation (rentedcars/van/truck, local drivers)

Telecommunication (GSM, satellite, internet)

Language (interpreters)

Safety and security

Health

…………….


Drhouse project

TENT CAMP

(tents, filedkitchen, generators, air conditioning, showers, latrines, desks, …)


Drhouse project

K-rations= breakfast + lunch + dinner

Dehydratedfood


Drhouse project

  • Task E.Training

  • About 100 trained technicians for each module

  • Advanced training mainly based on

  • Foreign methodologies for safety and damage assessment

  • Information Technology

  • EU Civil Protection Mechanism,

  • Intervention in MS and outside EU (cultural awareness, Safety and security, media contacts, LEMA, OSOCC, etc)

  • Interoperability


Drhouse project

Task D. Deployment

On MIC request

Up to 15.000 Km

Up to 15 days

According to the actualneeds, the wholemacromodule or just one or twomodules can be deployed


Drhouse project

ROAD DEPLOYMENT

Up to thousands of Kilometers

AIR DEPLOYMENT

For greaterdistance.

In such a case cars/vanswill be rented on site.

SEE DEPLOYMENT

Ifnecessary (Islands)


Drhouse project

Air deployment, oneaircraft

(verycostly)

Pax

Pallets

KC 767A

COMBI (10 pallets+96 pax)


Drhouse project

P

A

Air deployment,

more thanoneaircraft

(more affordable)


Drhouse project

  • Additional addressed deployment issues

  • Passport

  • Visa

  • Vaccination

  • IT transportation

  • Stand-by arrangements

  • Cargo arrangements

  • Insurance

  • ……….


Drhouse project

Task C. Exercise

Only if the Commission does not require the deployment


Drhouse project

Task F.Dissemination

F.1 Media, brochures, ..

F.2 Raiseawareness

F.3 Technical dissemination

F.4 Technical publications

Internet site, e-brochure, logo


Drhouse project

Logo, clothing and EU visibility


Drhouse project

DPC InvolvedPersonnel

Project Responsible: Prof. Mauro Dolce

DPC

BSA moduleresponsible: A. Goretti

Sandro Coppari(IT), Francesco Giordano (Deployment), Tiziana Lo Presti (Reporting), Cosmo Mercuri (DB Technicians), Claudio Moroni (SOP), Elena Speranza (Training), Lorella Salvatori e Stefano Ciavela (Emergency management), Grazia Curalli, Danilo Bilotta, Ambra Sorrenti ed Eleni Kapocianni(International Unit), Marco Agnoloni, Valter Macioci, Giambattista Artesi, Roberto Quinzi e Claudio Monteferri (Logistics), Marc’Antonio Santacroce (Aeronautics), Annalisa Montanari (Health), Cesare Castiglioni (Telecommunications), Biagio Prezioso (IT), Gianluca Garro e Ilaria Salvi (Press), Valeria Bernabei (Dissemination), Matteo Valente, Romeo Frisina(Documentation), Lavinia Di Meo (Legal Issues), Virginia Giallanza e Andreana Valente (Administration), Davide Savone(SW development), Giancarlo Marcari (project management)

Back


  • Login