Project Title
This presentation is the property of its rightful owner.
Sponsored Links
1 / 1

Project Title Project # PowerPoint PPT Presentation


  • 76 Views
  • Uploaded on
  • Presentation posted in: General

Project Title Project #. Sponsor Logo. Project Team Principal Investigatorname Co-Principal Investigatorname (s) Graduate Assistantname (s) Undergraduate Assistantname (s). Project Motivation Gallo Company

Download Presentation

Project Title Project #

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Project title project

Project Title

Project #

Sponsor

Logo

Project Team

Principal Investigatorname

Co-Principal Investigatorname (s)

Graduate Assistantname (s)

Undergraduate Assistantname (s)

Project Motivation

  • Gallo Company

    • The world’s foremost winery in the art and science of grape growing and winemaking

    • Produces wines in every category, to suit every taste

  • Gallo’s tank piping network

    • Age/store

    • Blend

    • Bottle

  • Problems in current pipe routing

    • Manual tank selection

    • Reactive scheduling

Project Objectives

  • Model and analyze the current Cellar Tank Piping Network

  • Research optimal pipe routing path algorithm

  • Develop customer solution software

Project Activities

  • Current Process Analysis

  • Problem Formulation

  • Data Collection and Model Building

  • Experimental Design

  • Documentation

  • Implementation

  • Validation

Research Methodology

Network Optimization

  • Optimization-based piping network analysis

  • Heuristic-based minimum path analysis with blocking considerations

  • Analysis of the impact of resource relaxation (i.e., adding pipelines to improve throughput)

Model E&J Gallo’s Piping Network

  • Multi-objective decision making

    • Minimizes wine damage (routing distance)

    • Minimizes labor requirement

    • Maximizes throughput

  • Resource and piping constraints

    • Order

    • Wine assortment

    • Barrel/tank size

    • Existing piping network

  • Proactive scheduling

    • Order history

    • Predictive allocation

GRAPHIC

GRAPHIC

GRAPHIC


  • Login