Continual Assessment/Evaluation Protocol Review. Integrity Management Workshop July 23-34, 2002. Program Element Requirement. §452 (f) An operator must include, at minimum, each of the following elements in its written integrity management program:

Download Presentation

Continual Assessment/Evaluation Protocol Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Continual Assessment/Evaluation Protocol Review Integrity Management Workshop July 23-34, 2002

  2. Program Element Requirement • §452 (f) An operator must include, at minimum, each of the following elements in its written integrity management program: • (5) A continual process of assessment and evaluation to maintain a pipeline’s integrity (see paragraph (j) of this section)

  3. Objectives • Verify Operator’s Commitment to Continual Assessment and Evaluation • Verify Risk-Based Process to Determine: • Future Assessment Schedules • Future Assessment Methods • Compliance with 5-Year Maximum Re-Assessment Intervals

  4. Continual Assessment/Evaluation • Process • Procedures • Documentation • Institutionalization • Responsibility and Accountability

  5. Continual Assessment/Evaluation • Continual Integrity Evaluations • Evaluation Frequency • Based on Risk Factors • Adequate to Ensure P/L Integrity • Consideration of Prior Integrity Information • Assessments • Risk Analyses • Remediation History

  6. Continual Assessment/Evaluation • Periodic Assessments • Evaluation Frequency • Based on Risk Factors • Adequate to Ensure P/L Integrity • 5-Year Maximum Interval • Assessment Methods • Based on Same Process Used for Baseline Assessment • Consider All Applicable Risk Factors • Need to be Changed Based on Newly Identified Risk Factors

  7. Continual Assessment/Evaluation • Assessment Interval Variance Requests • Engineering Basis • 270-day Notification • Strong Technical Basis • Unavailable Technology • 180-day Notification • Bona Fide Effort to Meet Schedule • Specific Reasons Why Schedule Can Not Be Met • Interim Measures for Equivalent Understanding of P/L

  8. Continual Assessment/Evaluation • Expectations • Continual Assessment and Evaluation Process • Institutionalization of Continual Process • Ongoing Assurance of P/L Integrity • Basis for Variance Notifications