GRUPO: FLÁVIO PIRES DA SILVA; MATEUS SIMON. TRABALHO DE ARRANJO FÍSICO INDUSTRIAL. 1. OBJETIVO; 2. A EMPRESA; 3. ATIVIDADE CONSIDERADA; 4. POSTOS DE TRABALHO; 5. CRONOANÁLISE; 6. ESQUEMA DE PRODUÇÃO; 7. LAYOUT ATUAL; 8. DEFINIÇÃO DO PROBLEMA; 9. PROPOSTAS DE SOLUÇÃO;

Download Presentation

TRABALHO DE ARRANJO FÍSICO INDUSTRIAL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GRUPO: FLÁVIO PIRES DA SILVA; MATEUS SIMON. TRABALHO DE ARRANJO FÍSICO INDUSTRIAL

  2. 1. OBJETIVO; 2. A EMPRESA; 3. ATIVIDADE CONSIDERADA; 4. POSTOS DE TRABALHO; 5. CRONOANÁLISE; 6. ESQUEMA DE PRODUÇÃO; 7. LAYOUT ATUAL; 8. DEFINIÇÃO DO PROBLEMA; 9. PROPOSTAS DE SOLUÇÃO; 10. ESCOLHA DA MELHOR SOLUÇÃO; 11. RESUMO DO TRABALHO. SUMÁRIO

  3. 1 - OBJETIVO AUMENTAR A PRODUTIVIDADE DE UMA LINHA DE PRODUÇÃO ATRAVÉS DE UM NOVO LAYOUT, BASEANDO-SE NA CRONOANÁLISE DOS ELEMENTOS DOS POSTOS DE TRABALHO.

  4. BMB MODE CENTER CENTRO DE MODIFICAÇÃO DE CAMINHÕES E ÔNIBUS DA MARCA VOLKSWAGEM 2 - A EMPRESA

  5. O PROJETO FOI REALIZADO NA LINHA DE MONTAGEM DE VEÍCULOS 6 X 2, ONDE OCORRE A INSTALAÇÃO DO 3º EIXO EM CAMINHÕES DE 23 TONELADAS. 3 - ATIVIDADE CONSIDERADA

  6. 4 - POSTOS DE TRABALHO

  7. 4.1 - POSTOS DE TRABALHO

  8. 4.2 - PRÉ-MONTAGEM E COLOCAÇÃO DAS RODAS

  9. 4.3 - MONTAGEM E MONTAGEM DOS BRAÇOS

  10. 4.4 - ALINHAMENTO

  11. 4.5 - TECTIL

  12. 4.6 - INSPEÇÃO FINAL

  13. 5 - CRONOANÁLISE CONHECIMENTO DO POSTO, DEFINIÇÃO DOS ELEMENTOS, MEDIÇÃO DO TEMPO REAL, T(MÉDIA), AVALIAÇÃO DO RÍTMO, R(LENTO 80 % - NORMAL 100 % - ACELERADO 120%), E DO FATOR DE TOLERÂNCIA, FT (TEMPO PESSOAL 5% - FADIGA BÁSICA 4% - POSIÇÃO NORMAL DE TRABALHO CURVADO 2% - USO DE FORÇA MUSCULAR 2% - NÍVEL DE RUÍDO INTERMITENTE E ALTO 2% - MONOTOMIA MÉDIA 1%) CALCULO DO TEMPO NORMAL(TN): TN = T x R; 3. CÁLCULO DO TEMPO PADRÃO (TP): TP = TN x FT (ACRÉSCIMO DE 16%). 4. CÁLCULOS E RESULTADOS E A FUNDAMENTAÇÃO TEÓRICA FOI RETIRADO DO CAPÍTULO 10 DO LIVRO ADMINISTRAÇÃO DA PRODUÇÃO E OPERAÇÕES, MOREIRA, Daniel A. Ed São Paulo. Pioneira, 1996. 619 p. CONSTAM EM ANEXO.

  14. 6 - ESQUEMA DE PRODUÇÃO PRÉ-MONTAGEM COLOCAÇÃO DAS RODAS MONTAGEM DOS BRAÇOS MONTAGEM ALINHAMENTO TECTIL INSPEÇÃO FINAL CAMINHÃO 6 X 2, 23 TONELADAS, COM 3º EIXO MONTADO BRAÇOS CAMINHÕES EIXOS

  15. 7 - LAYOUT ATUAL ALINHAMENTO 100 m² COLOCAÇÃO DAS RODAS 40m² PRÉ-MONTAGEM 150m² MONTAGEM 220 m² MONTAGEM DOS BRAÇOS 30 m² INSPEÇÃO FINAL 80m² TECTIL 80m² MONTAGEM DE VEÍCULOS ESPECIAIS 600 m² ENTRADA SAÍDA I FLUXO DE CAMINHÕES FLUXO DE EIXOS FLUXO DE BRAÇOS O O I

  16. 7.1 - CRONOANÁLISE DO LAYOUT ATUAL * CONSIDERANDO A JORNADA DE 8 HORAS DIÁRIAS DE TRABALHO.

  17. 7.2 - CARACTERÍSTICAS DO LAYOUT ATUAL

  18. AUMENTAR A PRODUTIVIDADE ATRAVÉS DA MUDANÇA DO POSICIONAMENTO DOS POSTOS DE TRABALHO, DIMINUINDO AS DISTÂNCIAS E SIMPLIFICANDO OS DESLOCAMENTOS PARA DIMINUIR OS TEMPOS PADRÃO. 8 - DEFINIÇÃO DO PROBLEMA

  19. MUDAR O LAYOUT DIMINUINDO, SIMPLIFICANDO E DESCRUZANDO OS DESLOCAMENTOS DE EIXOS E CAMINHÕES PARA DIMINUIR O TEMPO PADRÃO DE CADA POSTO, AUMENTANDO A PRODUTIVIDADE. 9 - PROPOSTAS DE SOLUÇÃO

  20. 9.1 - LAYOUT PROPOSTO 1 ALINHAMENTO COLOCAÇÃO DAS RODAS MONTAGEM MONTAGEM DOS BRAÇOS O I PRÉ-MONTAGEM INSPEÇÃO FINAL TECTIL MONTAGEM DE VEÍCULOS ESPECIAIS ENTRADA SAÍDA I FLUXO DE CAMINHÕES FLUXO DE EIXOS FLUXO DE BRAÇOS O

  21. 9.2 - CRONOANÁLISE DA PROPOSTA 1 * CONSIDERANDO A JORNADA DE 8 HORAS DIÁRIAS DE TRABALHO.

  22. 9.3 - CARACTERÍSTICAS DA PROPOSTA 1

  23. 9.4 - LAYOUT PROPOSTO 2 ALINHAMENTO m² COLOCAÇÃO DAS RODAS m² MONTAGEM m² MONTAGEM DOS BRAÇOS m² O I PRÉ-MONTAGEM m² INSPEÇÃO FINAL m² TECTIL m² MONTAGEM DE VEÍCULOS ESPECIAIS m² ENTRADA SAÍDA I FLUXO DE CAMINHÕES FLUXO DE EIXOS FLUXO DE BRAÇOS O

  24. 9.5 - CRONOANÁLISE DA PROPOSTA 2 * CONSIDERANDO A JORNADA DE 8 HORAS DIÁRIAS DE TRABALHO.

  25. 9.6 - CARACTERÍSTICAS DA PROPOSTA 2

  26. 10 - ESCOLHA DA PROPOSTA * CONSIDERANDO A JORNADA DE 8 HORAS DIÁRIAS DE TRABALHO.

  27. 10.1 - ESCOLHA DA PROPOSTA ALINHAMENTO ALINHAMENTO m² COLOCAÇÃO DAS RODAS m² COLOCAÇÃO DAS RODAS MONTAGEM m² MONTAGEM MONTAGEM DOS BRAÇOS m² MONTAGEM DOS BRAÇOS O O I I PRÉ-MONTAGEM PRÉ-MONTAGEM m² INSPEÇÃO FINAL INSPEÇÃO FINAL m² TECTIL m² TECTIL MONTAGEM DE VEÍCULOS ESPECIAIS MONTAGEM DE VEÍCULOS ESPECIAIS m² PROPOSTA 1 PROPOSTA 2

  28. PELO AUMENTO DA PRODUTIVIDADE DO GARGALO, POSTO DE TRABALHO MONTAGEM (PROPOSTA 1: 13,54 VEÍCULOS POR DIA); PELA SIMPLIFICAÇÃO E DIMINUIÇÃO DOS DESLOCAMENTOS DE EIXOS E CAMINHÕES (CROQUI DA PROPOSTA 1). 10.2 - ESCOLHA DA PROPOSTA

  29. 11 - QUADRO RESUMO

  30. 11.1 - QUADRO RESUMO

  31. 11.2 - VANTAGENS

  32. 11.3 - DESVANTAGENS

  33. REFLEXÃO “ NÃO TE POSSO DAR O QUE JÁ NÃO EXISTIA EM VOCÊ MESMO. NÃO TE POSSO MOSTRAR UM CAMINHO QUE JÁ NÃO EXISTIA EM SUA PRÓPRIA ALMA. NADA TE POSSO OFERECER A NÃO SER O IMPULSO OU A CHAVE PARA QUE VOCÊ CONSIGA DESVENDAR SEU PRÓPRIO MUNDO, E ISSO É TUDO”. AUTOR DESCONHECIDO