August Webinar
This presentation is the property of its rightful owner.
Sponsored Links
1 / 17

Agenda of Topics PowerPoint PPT Presentation


  • 89 Views
  • Uploaded on
  • Presentation posted in: General

August Webinar. Agenda of Topics. New XL10 Controller Features, Pricing Commercial Details. Cscape 9.10B Now Available Features, enhancements Web Posting Monday. Lead Time Updates Trends & Problem Items. New XL10!. Next XL series Controller. Feature Set 10.4” TFT VGA Display

Download Presentation

Agenda of Topics

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Agenda of topics

  • August Webinar

  • Agenda of Topics

  • New XL10 Controller

    • Features, Pricing

    • Commercial Details

  • Cscape 9.10B Now Available

    • Features, enhancements

    • Web Posting Monday

  • Lead Time Updates

    • Trends & Problem Items


Agenda of topics

  • New XL10!

  • Next XL series Controller

  • Feature Set

    • 10.4” TFT VGA Display

    • Same I/O Options as rest of XL Series

    • Full Ethernet, USB A&B

    • CsCAN, microSD

    • Two RS-232/RS-485 Ports

    • Slim Profile:

      • 1” depth at perimeter

      • 2” max depth + I/O

$1995 (102 model)

Shipping October!


Agenda of topics

  • New XL10

  • Features & Benefits

10.4” VGA

Screen

1” Depth @ Perimeter, 2” Max Depth


Agenda of topics

  • New XL10

  • Features & Benefits

USB Programming & microSD (hidden)

XL Series I/O Options

USB Host & Built-in Ethernet

CsCAN, MJ1 & MJ2

Full Ethernet with Web Serving, FTP Suppport, Modbus/TCP Master & Slave


Agenda of topics

  • New XL10

  • Part Numbers & Pricing

10.4” VGA All-in-one from $1995 with I/O


Agenda of topics

  • New XL10

  • Important Dates

  • Open for Orders: 9/1

  • Sales Material Online: 9/7

  • Demos Available: 9/15

  • Projected Stock Date: 10/6/10

  • CE mid-4th Quarter

  • UL early 1st Quarter

Accepting Orders 9/1/10


Agenda of topics

  • Cscape 9.10B

  • Important Maintenance Release

  • Cscape 9.1B

    • Important Bug Fixes

    • Some New Features

    • Located on ftp.heapg.com today (not advertised)

    • To Be Posted on www.heapg.com at normal location Monday or Tuesday


Agenda of topics

  • Cscape 9.10B

  • New Models Added (XL10e & QX501)


Agenda of topics

  • Cscape 9.10B

  • Connection Wizard

Addresses one of the biggest difficulties for new customers: Establishing a connection with the OCS!


Agenda of topics

  • Cscape 9.10B

  • Semi-Automatic Web Updates

Users with Internet Access can check for updates, and automatically install those updates if desired


Agenda of topics

  • Cscape 9.10B

  • Important Maintenance Release

The communication medium (Serial/Ethernet/Modem/USB/Can) is now indicated in the status bar

The Connection Method/Details is now indicated on the Status Bar


Agenda of topics

  • Cscape 9.10B

  • IEC Editor Enhancements

User can also configure the compilation sequence of multiple blocks in main loop modules area of an IEC Program by accessing the “IEC Modules Compilation Sequence Configuration” Dialog.

User can now access the main SFC Logic and its secondary editors simultaneously.

User can now have access to the secondary editors set of multiple step/transition blocks of an SFC Logic Module simultaneously.

User can now debug the main SFC Logic as well as the secondary logic and view them simultaneously.


Agenda of topics

  • Cscape 9.10B

  • Bug Fixes

Fixed C/F selection on SmartRail RTD and THM modules not correct.

Fixed IEC program variable window limited width

Fixed RCX filenames and loader IDs.

Reverted to non Unicode build to fix problems caused by download image size increase.

Release Version number is shown on Splash screen again.

Fix for failure to save when two identically named programs are in the same project.

Fixed Search window pop's up after closing Gredit

Fixed firmware update wizard for J1939 options.

Restore registers correctly restores all registers.

Various fixes and Enhancements to the printing functionality.

Various fixes to the font editor, including font size matching, and improved usability.

Fixes to DeviceNet for Smartload, node zero usage and slave nodes with no data not being automatically deleted.

Fix to Bitmap compression algorithm which could lock up the firmware.

Fix for automatic I/O recognition not loading default module settings.

Fixed Remote terminal not working over ethernet.

Fixed firmware update wizard not allowing adding/removing QX backpack.


Agenda of topics

  • Lead Times

  • Review of Current Status

  • XLt

    • High Demand Globally, along with a tight electronics supply chain – have taken us well outside our 2-4 week window

    • XLts will be allocated during September on a need basis

    • 2-4 Week window probably will not be regained until late Oct

105 I/O

  • XL Series 105 I/O Option

    • We’ve been running outside the 2-4 week window

    • By mid-to-late September, we should be back to a 2-4 week level

12 DC In, 12 DC Out,

2 +2 Universal Analog I/O


Agenda of topics

  • Lead Times

  • Review of Current Status

  • SmartStix I/O

    • Have Been Running outside of 2-4 week normal lead time

    • Situation improving for now

    • Distributor Stocking Orders HIGHLY RECOMMENDED for September

  • LX Controller (Mature)

    • Completely out of HE-LX280 & HE-LX280C100

    • Only a few HE-LX300 & HE-LX300C100 left

    • Replaced by HE-XL1M0 & HE-XL100, respectively


Agenda of topics

  • Lead Times

  • Review for New Products

  • HE-RX371

    • Have Been Running 8-10 weeks

    • All orders filled by 9/10

  • HE-CX251

    • Have Been Running 8-10 weeks

    • All orders filled by 9/10

  • SmartRail

    • Running 2-4 weeks

    • CsCAN October

  • SmartBlock

    • THM & ACM only ship next month

    • Balance 4th/1st Quarters


Agenda of topics

  • Next Month

  • Select Agenda Items

  • QX OCS

    • New 10.4” QX Model

  • SmartRail

    • New CsCAN I/O Base

  • SmartBlock

    • Thermocouple & AC Power Monitor Details

  • Wireless

    • New Wireless option for Ethernet-based Controllers


  • Login