ITRS 2001 Factory Integration Chapter Probe/Test Manufacturing Backup Section. Details and Assumptions for Technology Requirements and Potential Solutions. Backup Outline. How Metrics were Selected Disruptive Test Technologies Probe/Test Manufacturing Technology Requirements Table

Download Presentation

ITRS 2001 Factory Integration Chapter Probe/Test Manufacturing Backup Section

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Itrs 2001 factory integration chapter probe test manufacturing backup section

ITRS 2001 Factory Integration Chapter Probe/Test Manufacturing Backup Section

Details and Assumptions for Technology Requirements and Potential Solutions

ITRS Factory Integration TWG


Backup outline

Backup Outline

  • How Metrics were Selected

  • Disruptive Test Technologies

  • Probe/Test Manufacturing Technology Requirements Table

  • Translating Probe/Test Manufacturing Technology Requirements to Reality

  • Supporting Material for Probe/Test Manufacturing Technology Requirements

ITRS Factory Integration TWG


How test fi metrics were selected

How Test FI Metrics were selected

  • Limited scope to metrics that targeted integration time and product set up time improvements

    • Equipment Integration and Product Setup benchmark data from other areas of semi-conductor manufacturing is readily available (i.e. Wafer Fabrication, Package Assembly)

    • Technical expertise is readily available to derive viable improvement targets

  • Use relative values rather than absolute values

    • Protect IC Manufacturer competitive info.

    • Protect ITRS Test TWG and SEMATECH Test Benchmarking Project member competitive info.

  • Test metrics are not necessarily tied to the technology nodes as in other chapters such as Lithography

    • However, nodes offer convenient interception points to bring in new capability, tools, software and other operational potential solutions

  • Inclusion of each metric is dependent on consensus agreement

We think the metrics provide a good summary of stretch goals for

most companies in today’s challenging environment.

ITRS Factory Integration TWG


Itrs test fi team membership 8 3 01

Name

Company

Role

Paul Patton

Advantest

Product Manager

Roy Odhner

Agere

Probe and Test Equipment Control and Data Collection

Bill O’Grady

Agilent

Automated Test Group Factory Automation Program Manager

Kazu Nishitsuru

Agilent

Agilent ITRS representative

Clift Richardson

Delta

Automated Products Group Technical Lead

David Barton

Gem City

Controls and Software Engineering Manager

Duane Howard

IBM

300mm Backend Software Program Manager

Steve Stringer

IBM

IBM SEMI Standards Expert

Agnes Kwan

Intel

Logic Technology Development Automation Pathfinding Manager

Rohan Nageswaran

Intel

Wafer/Package Test Equipment Control Manager

Don Hartman

Motorola

Front End Probe and Test Automation

Andreas Piependrink

Multitest

Electronics Engineering Manager

Peter Kaul

Multitest

Electronics Development

Gino Crispieri

SEMATECH

300mm Project Manager for Front End Standards

Jim Ammenhauser

SEMATECH

Project Manager Test Benchmark Committee

Atlant Smith

Teradyne

Semiconductor Test SW Lead Developer

Jim Schillawski

Teradyne

Semiconductor Test SW Lead Developer

Tony Auwn

Teradyne

Semiconductor Test SW Manager

ITRS Test FI Team Membership(8/3/01)

ITRS Factory Integration TWG


Impact of key technologies to test

Impact of Key Technologies to Test

ITRS Factory Integration TWG


Itrs test factory integration technical requirements table

ITRS Test Factory Integration Technical Requirements Table

  • Test Product Changeover Notes / Assumptions:

  • No known solutions for targeted improvements from 2004 and beyond (Industry Action is Required)

  • Expect to see larger improvements in complex devices vs. simple devices due to

  • significantly longer Test Program download and compile times.

  • Test Equipment Integration Notes / Assumptions:

  • No known solutions for targeted improvements from 2005 and beyond.

  • Expect to see larger improvements in 1st article equipment integration due to the usage of 3rd party SW and

  • industry developed test plans.

  • Improvement targets are based on known SECS/GEM equipment integration times relative to Test.

ITRS Factory Integration TWG


Translating test metrics to reality

Translating Test metrics to Reality

ITRS Factory Integration TWG


Probe test manufacturing potential solutions

Driven by SEMI Test SEM Revision Task Force

Potential Solution Roadmap

Driven by SEMATECH Test Interface Standards Focus Group

Glossary

Research Required covers the requirements gathering, problem definition and potential solution discovery activities required to address a specific technology requirement.

Legend

Development Underway covers the requirements gathering, analysis, design, implementation and testing of standards compliant software and hardware systems.

Qualification / Pre-Production covers the high volume factory insertion and ramp of product on standards compliant HW and SW systems.

Probe/Test Manufacturing Potential Solutions

ITRS Factory Integration TWG


Test equipment control and data collection vision state architecture

Legend:

ICM Owned SW

Supplier Owned SW

HW Boundary

Factory Information and Control System

“Setup / Init”

MES, Equipment Control and Equipment Engineering Systems

1a

“Start

Lot”

2

HSEM (E30.2)

PSEM (E91)

Proc Mgmt (E40)

Ctrl Job (E94)

Carr Mgmt (E87)

Subs Trk (E90)

Mat Handoff (E84)

“EOT”

TSEM (E30.3)

Proc Mgmt (E40)

Ctrl Job (E94)

3b

“End

Lot”

“Index to Next Unit”

4a

3c

“End Lot

Complete”

Next Gen Prober / Handler

Tester SECS/GEM Interface

4c

Prober/Handler SECS/GEM Interface

Supplier Internal

Calling Mechanism

TESTER

OS

“Open

Datalog”

“Write

Unit Data”

“Close

Datalog”

NEW Test Result Format and Transport Standard

1c

3a

4b

Test Program

NEW Test Process Program Content Standard (Exx.yy)

Network File Server

“TestProgram Load”

Next Gen Tester

Test Program

NEW Test Process Program Transport Standard (Exx.yy)

1b

Test Equipment Control and Data Collection “Vision State” Architecture

ITRS Factory Integration TWG


Test equipment control architecture alternatives claims of intent

Test Equipment Control Architecture Alternatives Claims of Intent

  • The following 4 architecture alternative diagrams are not mandates for compliance with the TSEM, HSEM or PSEM standards.

  • The purpose of the diagrams is to illustrate potential implementations of the TSEM, HSEM and PSEM standards.

    • i.e. the TSEM, HSEM and PSEM standards should not preclude any one of these architectures.

  • It is left up to the IC Manufacturer and Supplier to negotiate and choose their mutually preferred architectural implementation.

ITRS Factory Integration TWG


Test equipment control architecture alternative 1

Legend:

IC Manu Owned SW

Vendor Owned SW

HW Boundary

Manufacturing Execution System

Factory MES Server(s)

IC Manufacturer Proprietary Interface

  • Notes:

  • The diagram does not intend to imply a specific physical network topology.

  • One or more physical network connections may emanate from each HW boundary.

  • GJG refers to all applicable GJG SW standards to a particular piece of equipment.

Test Cell

Host 2

Test Cell

Host 1

Workstation / PC

Workstation / PC

HSEM/PSEM + GJG

HSEM/PSEM + GJG

TSEM + GJG

TSEM + GJG

Prober/Handler 2

Prober/Handler 1

Tester 2

Tester 1

Workstation / PC

Workstation / PC

Workstation / PC

Workstation / PC

Test Equipment Control Architecture Alternative 1

ITRS Factory Integration TWG


Test equipment control architecture alternative 2

Legend:

IC Manu Owned SW

Vendor Owned SW

HW Boundary

Manufacturing Execution System

Factory MES Server(s)

IC Manufacturer Proprietary Interface

  • Notes:

  • The diagram does not intend to imply a specific physical network topology.

  • One or more physical network connections may emanate from each HW boundary.

  • GJG refers to all applicable GJG SW standards to a particular piece of equipment.

Test Cell

Host 1

Test Cell

Host 2

TSEM + GJG

TSEM

Tester 1

Tester 2

Workstation / PC

Workstation / PC

Prober/Handler 2

Prober/Handler 1

HSEM/PSEM + GJG

HSEM/PSEM + GJG

Workstation / PC

Workstation / PC

Test Equipment Control Architecture Alternative 2

ITRS Factory Integration TWG


Test equipment control architecture alternative 3

Legend:

IC Manu Owned SW

Vendor Owned SW

HW Boundary

Manufacturing Execution System

Factory MES Server(s)

IC Manufacturer Proprietary Interface

  • Notes:

  • The diagram does not intend to imply a specific physical network topology.

  • One or more physical network connections may emanate from each HW boundary.

  • GJG refers to all applicable GJG SW standards to a particular piece of equipment.

Test Cell

Host 1

Test Cell

Host 2

HSEM/PSEM + GJG

HSEM/PSEM + GJG

Handler/Prober 1

Handler/Prober 2

Workstation / PC

Workstation / PC

Tester 2

Tester 1

TSEM + GJG

TSEM + GJG

Workstation / PC

Workstation / PC

Test Equipment Control Architecture Alternative 3

ITRS Factory Integration TWG


Test equipment control architecture alternative 4

Legend:

IC Manu Owned SW

Vendor Owned SW

HW Boundary

Manufacturing Execution System

Factory MES Server(s)

IC Manufacturer Proprietary Interface

Test Cell

Host 1

Test Cell

Host 2

HSEM/PSEM + GJG

HSEM/PSEM + GJG

TSEM + GJG

TSEM + GJG

Handler/Prober 1

Tester 1

Handler/Prober 2

Tester 2

Workstation / PC

Workstation / PC

  • Notes:

  • The diagram does not intend to imply a specific physical network topology.

  • One or more physical network connections may emanate from each HW boundary.

  • GJG refers to all applicable GJG SW standards to a particular piece of equipment.

Test Equipment Control Architecture Alternative 4

ITRS Factory Integration TWG


Test cell communication model

Unit Test Cycle

SC Performance

Eqp Vendor/Eng Scope

2

3

5

1

6

7

8

4

Test Cell Communication Model

  • Unit Test Time component breakdown:

    • SC processing (Index to next unit)

    • SC – handler/prober communication (Index to next unit)

    • Handler/prober indexing

    • SC – handler/prober communication (Ready to Test)

    • SC processing (Start Test)

    • SC – tester communication (Start Test)

    • Test Program execution

    • SC – tester communication (End Test)

Automation/IT

Scope

Eqp Vendor Scope

Automation/IT

Scope

Engineering Scope

Automation/IT

Scope

ITRS Factory Integration TWG


Non standard test equipment control communication model s non standard

  • 3 SW Possible Deployment Models:

  • SC lives on Tester HW

  • SC lives on Prober/Handler HW

  • SC lives on separate HW

SC processing (Index to next unit)

SC – handler/prober communication (Index to next unit)

Handler/prober indexing

SC – handler/prober communication (Ready to Test)

SC processing (Start Test)

SC – tester communication (Start Test)

Test Program execution

SC – tester communication (End Test)

Test Cell Business Logic

5

1

Tester

Communication

Flow

Prober/Handler

Communication

Flow

4

8

2

6

Prober/Handler

Controller

Tester

PLC

Equipment

Interface

7

3

Prober/Handler Equipment

Tester Equipment

GPIB

Non Standard Test Equipment Control Communication Model(s) - (Non Standard)

ITRS Factory Integration TWG


Proposed test equipment control model

Station Controller PC

5

1

Test Cell Business Logic

SC processing (Index to next unit)

SC – handler/prober communication (Index to next unit)

Handler/prober indexing

SC – handler/prober communication (Ready to Test)

SC processing (Start Test)

SC – tester communication (Start Test)

Test Program execution

SC – tester communication (End Test)

Tester

SECS/GEM Driver

Handler

SECS/GEM Driver

Tester

Communication

Flow

Prober/Handler

Communication

Flow

OS

TCP/IP Protocol Stack

8

6

4

2

10/100BaseT Ethernet Network

HSMS/SECS/GEM/HSEM/PSEM

HSMS/SECS/GEM/TSEM

New Datalogging Standard

External Factory Systems and Storage

Tester

Embedded Control Logic

Prober/Handler

Embedded Control

Logic

7

3

Tester PC

External Servers

Prober/Handler PC

Proposed Test Equipment Control Model

ITRS Factory Integration TWG