1 / 17

Team 13: All For Angkor

Team 13: All For Angkor. Presentation #3 ENGR 340 March 3, 2006. Team Members. Kirk Starnes, Andy Lynch, Katie Anderson, Brad Jansen, and Jon Larsen. Outline. Project Description Design Norms Design Process Project Status Obstacles/Issues Project Future Questions.

galya
Download Presentation

Team 13: All For Angkor

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006

  2. Team Members Kirk Starnes, Andy Lynch, Katie Anderson, Brad Jansen, and Jon Larsen

  3. Outline • Project Description • Design Norms • Design Process • Project Status • Obstacles/Issues • Project Future • Questions

  4. Project Description We are working in conjunction with architecture students from Handong Global University in South Korea to design the first academic building of Angkor Global University in the Siem Reap province of Cambodia • Structural Design of Building • Land Development

  5. Project Description Section Cut Air Flow Diagram Floor Layout

  6. Design Norms • Cultural Appropriateness • Building Materials • Construction Methods • Stewardship • Minimizing Material Use

  7. Design Process • Loads & Codes • ASCE 7 • International Building Code (ACI18-02) • Top to Bottom Design • Roof/Floor Slabs • Beams/Columns • Foundation

  8. Project Status • Load Calculations • Slab Design • Beam Design • Column Design • STAAD Model • Land Development

  9. Project Status Load Calculations • Primary Environmental Considerations • Completed

  10. Project Status Slab Design • Preliminary Calculations Completed • Checked for Deflection

  11. Project Status Beam Design • Preliminary Calculations Completed • Steel Reinforcement Design Completed

  12. Project Status Column Design • Preliminary Calculations Completed b d' dt h d

  13. Project Status STAAD Model • Preliminary Design Complete Moment Diagram

  14. Project Status Land Development • Site Layout Complete • Began Site Gradation • Sized Septic Tanks

  15. Obstacles/Issues • Communication With Architecture Students • Change of Architectural Plans • Interdependency of Project Components NEW OLD

  16. Project Future • Finish Design Calculations • Produce Structural Plan Set • 3-D Model and Computer Walkthrough • Write Final Report

  17. Questions??