1 / 70

UNIT 2: THE ANALYTICAL SIZEUP PROCESS

UNIT 2: THE ANALYTICAL SIZEUP PROCESS. OBJECTIVES. The students will: Discuss the scientific method. Describe the primary sizeup factors and determine their impact on objectives and strategies. Analyze the command sequence action planning cycle. . USE THE SCIENTIFIC METHOD.

freja
Download Presentation

UNIT 2: THE ANALYTICAL SIZEUP PROCESS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UNIT 2: THE ANALYTICAL SIZEUP PROCESS

  2. OBJECTIVES The students will: • Discuss the scientific method. • Describe the primary sizeup factors and determine their impact on objectives and strategies. • Analyze the command sequence action planning cycle.

  3. USE THESCIENTIFIC METHOD • Observe the facts. • Test the accuracy of the facts through observation. • If the facts are accurate, logical hypotheses can be deduced. • If hypothesis is proved true, outcomes may be predicted in similar situations. • These hypotheses are called principles.

  4. PRIMARY FACTORS CHART Introduce the Primary Factors Chart

  5. PRIMARY FACTORS (SIZEUP) Column 1: The conditions and elements that should be recognized and evaluated on arrival and during operations.

  6. INCIDENT OBJECTIVES Column 2: • Safe Removal of Occupants:When life hazard for occupants is the limiting or strategic factor. • Contain and Control Fire to Room/Building of Origin: No life hazard for occupants, and fire is considered to be controllable by a direct or indirect attack. • Contain, Control, and Limit Fire in Exposures:No life hazard for occupants and the situation is temporarily uncontrollable.

  7. INCIDENT STRATEGIES Column 3: • Rescue • Exposure protection  • Confine/Extinguish  • Overhaul  • Ventilation  • Salvage

  8. MAKING DECISIONS Primary Factors OBJECTIVES Strategic Activities

  9. PRIMARY FACTORS Evaluating the effect of the primary factors on incident strategies.

  10. LIMITS • LIFE HAZARD FOR OCCUPANTS Risks to firefighters, ranging from merely unusual to extreme, may be warranted. • NO LIFE HAZARD FOR OCCUPANTS Firefighters are never to be jeopardized unnecessarily.

  11. LIFE HAZARD • What effect would "status of occupants" have on your strategy? • What effect would "firefighter safety" have on your strategy?

  12. LOCATION OF FIRE ON ARRIVAL • Fire building • Exposures What effect would "location of fire on arrival" have on the strategy?

  13. EXTENT OF FIRE AFTER ARRIVAL • Fire building • Exposures What effect would "extent of fire after arrival" have on your strategy?

  14. CONSTRUCTION • Residential • Commercial What is the effect of "ordinary construction" on objectives?

  15. ORDINARY CONSTRUCTION - MODERN

  16. CONSTRUCTION (cont'd) What is the effect of "wood-frame construction"on objectives?

  17. CONSTRUCTION (cont'd) What is the effect of "fire-resistive construction" on objectives?

  18. Fire-resistive Construction

  19. Spray-on Fireproofing

  20. Enclosed Stairs

  21. CONSTRUCTION (cont'd) What effect would "non-combustible construction" have on your strategy?

  22. CONSTRUCTION (cont'd) What is the effect of "buildings under construction" on objectives?

  23. Building Under Construction

  24. CONSTRUCTION (cont'd) What is the effect of "buildings under demolition" on objectives?

  25. Building Under Demolition

  26. OCCUPANCY What effect would "occupancy" have on your strategies? • Type of occupancy • Contents of structure (fire load) • Exposures

  27. HEIGHT • Fire building • Exposures What effect would "height of building" have on your strategy?

  28. AREA • Fire building • Exposures What effect would "area of building" have on your strategy?

  29. STRUCTURAL COLLAPSE • Fire building • Exposures • Collapse zone • Apparatus placement What effect would "structural collapse" have on your strategy?

  30. WEATHER What effect would "weather" have on your strategy? • Low temperatures • High temperatures • Rain • Wind

  31. RESOURCE REQUIREMENTS What effect would "resource requirements" have on your strategy? • Water • Apparatus • Equipment • Personnel • Special extinguishing agents

  32. AUXILIARY APPLIANCES What effect would "auxiliary appliances" have on your strategy? • Sprinkler systems • Pressurization of stairways or other building areas

  33. TOPOGRAPHY What effect would "topography" have on your strategy? • Steeply graded streets/roads • Leveling portable ladders on grades • Congested streets/roads • Snow/Ice covered streets/roads • .

  34. EXPLOSIONS • Smoke explosions • Bomb explosions What effect would "explosions" have on your strategy?

  35. DURATION OF OPERATIONS What effect would "duration of operations" have on your strategy? • Long-duration incidents are difficult to deal with. • May indicate heavy involvement and structural collapse. • Maximizes the exposure hazard. • Consider relief for personnel.

  36. COMMAND SEQUENCE CYCLE Critical factors of incident operations are often overlooked (or not given enough emphasis). • Poor use of resources • Inappropriate strategies • Safety problems • High incident costs • Lower effectiveness This can result in:

  37. COMMAND SEQUENCE CYCLE (cont'd) Consists of six sequential steps: 1. Understanding the situation 2. Establishing incident objectives 3. Developing strategy 4. Directing tactical and resource assignments 5. Implementing the plan 6. Evaluating the plan

  38. COMMAND SEQUENCE

  39. COMMAND SEQUENCE (cont'd) Sizeup

  40. UNDERSTANDING THE SITUATION Involves knowing: • What has occurred • If the incident will expand (or get smaller) • Present (and future) resource and organizational needs

  41. COMMAND SEQUENCE Sizeup Problem ID

  42. PROBLEM IDENTIFICATION The analysis and comparison of incident primary factors and cues are the basis for problem identification.

  43. COMMAND SEQUENCE Sizeup Problem ID Establish Objectives Develop Strategy Select Tactics

More Related