An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. V World Water Forum Managing risks associated with natural disasters Sergio Soto-Priante Deputy Director General for Hydraulic Infrastructure for Agriculture National Water Commission (Mexico) March 2009 1

  2. Emergency • Unpredictable and uncontrollable events with impact in the population and infrastructure that can be catastrophic. Situación fuera de control que se presenta por el impacto de un desastre Natural Emergencia causada por intervenciones andrógenas Situaciones derivadas de la ocurrencia de fenómenos hidro-meteorológicos extremos, en locales donde existen obras construidas por el hombre 2

  3. I. Measures to be taken before the Emergency: Prevention (1) • Prepare maps of risk areas. • Territorial management and relocation of human settlements. • Build control and regulation infrastructure in rivers (levees, dikes, channels, flood gates, diversion dams, spillways). • Maintainment in rivers (bridges, siphons, tunnels, dredge works). 3

  4. I. Measures to be taken before the Emergency: Prevention (2) • Install and operate early warning systems (weather forecast, flow measurement in real time, hydraulic and hydrological models). • Develop contingency plans in rivers and high-risk areas. • Establish communication and operation protocols with state and local authorities. 4

  5. II. Measures to be taken during the Emergency: Response • Preliminary diagnosis of type and extent of damage. • Planning of emergency measures. • Integration of teams and coordination with local authorities. • Monitoring the evolution of the hydro-meteorological phenomenon and its impact. • Assessment and correction of emergency measures. 5

  6. III. Measures to be taken after the Emergency: Reconstruction (1) • Assess damage to water infrastructure and monitor its behavior, including storage dams. • Restore and normalize the supply of drinkable water and sanitation services. • Dislodge water volumes in flooded towns. 6

  7. III. Measures to be taken after the Emergency: Reconstruction (2) • Provide potable water to the population where service cannot be restore. • Carry out reconstruction of the hydraulic infrastructure. • Start protocols for resource use of federal funds for reconstruction. 7

  8. IV. Case: State of Tabasco • The State of Tabasco is located in Southeastern Mexico and has a population of 2’034,507 inhabitants. • Average annual rainfall is 2,102 mm. 8

  9. Rivers of Tabasco 9

  10. Hydro-meteorological events 2007 • During the months of October and November 2007 there were two cold fronts, combined with a low pressure channel, and the tropical storm "Noel" in the Caribbean Sea. • During October 2007, precipitation mounted to 1,960 millimeters (93% of the annual average). • During October 28th, 29th and 30th the precipitation was 961 millimeters (46% of the annual average). 10

  11. Integrated Water Plan for Tabasco (IWPT) General Objective The fundamental objective of the IWPT is to optimize conditions to reduce risk and vulnerability upon the population, their economic activities and ecosystems in the occurrence of extreme hydro-meteorological events, and the possible effects of climate change. 11

  12. Integrated Water Plan for Tabasco (IWPT) Specific objectives (1) Management of the rivers Samaria, Carrizal, La Sierra, Pichucalco, and Usumacinta to protect 370,000 inhabitants and 46,000 farming hectares. Optimize the operation of the hydroelectric dam system of the Upper Grijalva River. Territorial management and the resettlement of population located in high risk areas. Support the development of local capacities through: research projects, specialized studies and preparation of professionals. 12

  13. Integrated Water Plan for Tabasco (IWPT) Specific objectives (2) 5. Integrated management of upper basins (reforestation, soil conservation and restoration) 6. Monitoring of the works and preventive policies on a regular basis. 7. Develop an efficient geographic information system. 13

  14. Investment Program 14

  15. Main results 2007-2008 15