TEM METRICS & INDICATORS
This presentation is the property of its rightful owner.
Sponsored Links
1 / 1

Measuring Your Test Environment Management | Enov8 PowerPoint PPT Presentation


A key component of Test Environment Management is the ongoing measurement and optimization of your TEM practices. For more information visit us at : http://enov8.com/products/ecosystem-em/

Download Presentation

Measuring Your Test Environment Management | Enov8

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Measuring your test environment management enov8

TEM METRICS & INDICATORS

A key component of Test Environment Management is the ongoing measurement and optimization

of your TEM practices. Below is a list of metrics and indicators that should be captured as part of

establishing a Test Environment Management capability.

Note: These are not exhaustive, however capturing this information will set you on your way to

implementing a successful TEM services organisation.

ENVIRONMENT AVAILABILITY

• Availability of Environment

• Availability of Systems

(Instances)

ENVIRONMENT USAGE

• Historical Usage of Test Environment Systems (Instances)

• Future (Planned) Usage of Test Environment Systems (Instances)

ENVIRONMENT COVERAGE

• % of Test Environment Systems (Instances) under management (within

CMDB)

• % of Test Environment Systems (Instances) with rich knowledge (IP)

attached

ENVIRONMENT AGILITY

• Time to Set Up an E2E Environment

• Time to Setup Systems (Instances)

OPERATIONAL METRICS – DATA REFRESH

• Number of System Data Refreshes

• Time to do a Data Refresh

• % of Failed v Successful Data Refresh’s

• % of Tasks Automated versus Manual

OPERATIONAL METRICS - CHANGE

• Number of System Changes

• Outage caused by Change

• % of Failed v Successful Changes

• % of Tasks Automated versus Manual

OPERATIONAL METRICS - RELEASE

• Number of System Releases

• Outage caused by Release

• % of Failed v Successful Releases

• % of Tasks Automated versus Manual

Learn more at Enov8.com


  • Login