AL Garhoud Maintenance Facility for Marine Light Vessels at Dubai Creek

The purpose of the project was to provide maintenance for marine light vessels at the Al Garhoud, Dubai Creek. Encardio-rite was awarded the sub-contract for the monitoring work of the project. The scope of work included conducting a pre-construction (dilapidation) condition survey of bridge piers and building a viaduct, supply, installation, manual & automatic monitoring of tilt meters and manual & automatic surveying.

encardio
Download Presentation

AL Garhoud Maintenance Facility for Marine Light Vessels at Dubai Creek

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ONE STOP MONITORING SOLUTIONS | HYDROLOGY | GEOTECHNICAL | STRUCTURAL | GEODECTIC Over 50 years of Excellence through ingenuity PROJECT DOSSIER AL GARHOUD BRIDGE PROJECT OVEREVIEW The purpose of the project was to provide maintenance facility for marine light vessels Garhoud, Dubai proposed maintenance facility was in the close vicinity of 8~9 years old Al Garhoud Bridge which is 520 m long with 14 lanes and is ~16 m above the water. It was important to monitor the response of three piers of bridge during quay wall construction (in close vicinity) to ensure the safety and durability of existing Al Garhoud Bridge. Al Garhoud Maintenance Facility for Marine Light Vessels at Dubai Creek at Al Project Creek. The Location Dubai, UAE Client Roads & Transport Authority (RTA) Contractor Dutco Balfour Beatty LLC Consultants Consultant HSS Duration November 2016 to May 2017 www.encardio.com

  2. Monitoring solution Looking at the criticality of safety of existing running Al Garhoud Bridge, automatic online monitoring was decided. Data from both tilt meters and geodetic instruments were recorded dataloggers and automatic total stations and transferred to server using GSM/GPRS, to provide online data. with automatic Turnkey services Encardio-rite got the sub-contract for complete monitoring works of the project. Scope of works included: Pre-construction (Dilapidation) condition survey of bridge piers and viaduct.  Supply and Installation of geotechnical and geodetic instruments  Automatic monitoring of tilt meters at the 3 piers of Al Garhoud bridge  Automatic as well as manual surveying  INSTRUMENT USED Tilt meter: Installed at bridge piers to monitor tilt.  Building settlement point: Installed at pier base slab to monitor settlement  Prism target: Installed at bridge piers to monitor displacements and deformations  Installation of tilt meters & prism targets on the existing piers was very critical. Scaffoldings were fixed on pier base slab for installation and water boats were used to access piers. Monitored (geotechnical and geodetic) data was available online through our web based data management system to the client on their desktop in tabular as well as informative graphical formats. Monitoring reports were also submitted on weekly basis. Monitoring reports included interpretations of variations observed in instrument data with respect to the construction progress in the respective area. ENCARDIO-RITE ELECTRONICS PVT. LTD. A-7, Industrial Estate, Talkatora Road Lucknow, UP - 226011, India | P: +91 522 2661039-42 | Email: geotech@encardio.com | www.encardio.com International: UAE | Qatar | Bahrain | Greece | Singapore | USA | Bhutan India: Lucknow | Delhi | Kolkata | Mumbai | Chennai | Bangalore | Hyderabad | J&K