Changjiang River Scientific Research Institute of Changjiang Water Resources Committee

The Fluvial Changes of Jingjiang Reach during the Preliminary Period of the TGP Operation. HUANG LI. Changjiang River Scientific Research Institute of Changjiang Water Resources Committee. content. 1 Introduction. 2 calculation analysis. 3 field data analysis. 1 Introduction.

emiko
Download Presentation

Changjiang River Scientific Research Institute of Changjiang Water Resources Committee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Fluvial Changes of Jingjiang Reach during the Preliminary Period of the TGP Operation HUANG LI Changjiang River Scientific Research Institute of Changjiang Water Resources Committee

  2. content • 1 Introduction • 2 calculation analysis • 3field data analysis

  3. 1 Introduction • Jingjiang is the major reach in the middle and lower reach of Changjiang river.Jingjiang reach is 347.2km. • The upper Jingjiang is presently about 171.7km long from Zhicheng to Ouchi-mouth,and is a slightly curved fork river type. • The lower Jingjiang is about 175.5km long from Ouchi-mouth to Chenglingji, and is typical of sinuous stream.

  4. Upper-Jingjiang reach Lower-Jingjiang reach Middle reach of Changjiang river,955km long

  5. The schematic diagram of the upper Jingjiang reach

  6. The schematic diagram of the lower Jingjiang reach

  7. 2 calculation analysis • Main conclusions (1) • at the end of the twentieth year,the river reach from Yichang to Chenglingji will be scoured,the quantity will be 17.97×108 t and about 13.31×108 m3. • The scouring intensity increased gradually along the river reach. • The erosion above Taiping-mouth will reach an equilibrium approximately.

  8. Table1 Accumulated deposition-erosion amounts from Yichang to Chengliji

  9. Table2 Accumulated deposition-erosion areas from Yichang to Chengliji unit:m2

  10. Deposition-erosion amounts (104 m3) Yichang-Songzikou Songzikou-Taipingkou Fig1 1-10 year deposition-erosion process from Yichang to Chenglingji Taipingkou-Ouchikou Ouchikou-Chenglingji The years after the TGP operation

  11. Deposition-erosion amounts (104 m3) Taipingkou-Ouchikou Ouchikou-Chenglingji The years after the TGP operation Fig2 11-20 year deposition-erosion process from Taipingkou to Chenglingji

  12. Main conclusions (2) • At the end of year 2009,the main river channel of the upper Jingjiang reach will be scoured 3.71×108 ton when the discharge in Yichang is 5500m3/s,and the lower Jingjiang reach, 2.16 ×108 ton. • At the end of year 2022,the upper Jingjiang reach, 4.88 ×108 t,the lower Jingjiang reach, 8.05 ×108 t.

  13. Elevation (wu song,m) Distance from the dam (km) Fig3 Changes of the thalweg from Yichang to Chenglingji after the operation of the TGP

  14. Elevation (wu song,m) Distance from the dam (km) Fig4 Changes of the thalweg from Yichang to Chenglingji after the operation of the TGP

  15. Main conclusions (3) • Because of the scouring from Yichang to Chenglingji,the relation between water level and the discharge will change correspondingly.For the mid and lower river discharge the water level will descend to some extent.

  16. Table3 The decrease of water level after the operation of the TGP (compared to 2003) (m) Yichang Shishou Shashi Jianli

  17. 3field data analysis • Field data analysis from hydrological bureau of Changjiang Water Resources Committee show that,after TGP is put into operation in June 2003,the downstream of the TGP dam from Yichang to Chenglingji have occurred a long-distance erosion.

  18. Table4 the amounts of erosion from Yichang to Chenglingji Note : Erosion capacity ( unite : 108 m3);Erosion intensity (unite : m3/m )