1 / 10

How to get the job done without a supercomputer

How to get the job done without a supercomputer. DEM generation using Mars Express data. By Jasper Van doninck. Used data. 771601 samples produced by image matching Cartesian geocentric coordinates: X, Y, Z Standard deviations σ X , σ Y , σ Z. Data Preparation.

edolie
Download Presentation

How to get the job done without a supercomputer

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How to get the job done without a supercomputer DEM generation using Mars Express data By Jasper Van doninck

  2. Used data • 771601 samples produced by image matching • Cartesian geocentric coordinates: X, Y, Z • Standard deviations σX, σY, σZ

  3. Data Preparation • Coordinate transformation: 10 iterations

  4. Data Preparation (2) • Mars Reference spheroid: IAU/IAG 2000 a=3396190 m b=3376200 m e=(a2-b2)/a2 • Study area: λ≈48˚50’ W - 47˚35’ W ψ≈0˚15’ S - 13˚37’ N ≈ 74 km x 822 km

  5. Data Preparation (3) -Partitioning of dataset into 8 tab delimited .txt files λ ψ H (σH) 7 files of 100 000 records 1 file of 71 601 records -Load data in Acces – import as XY-data in ArcGIS, convert to shapefiles

  6. Kriging • Create Prediction Map + Prediction Standard Error Map for every subset • Export prediction maps + standard error maps to raster • 1arcmin grid, block interpolation 12*12 cels (≈82m)

  7. Final Map Generation -Combine subsets to 1 map: Weighted average Vr,c= (Σ Vr,c,i/Er,c,i)/(Σ 1/Er,c,i) Vr,c = Predicted height of cel r,c Vr,c,i = Predicted height of cel in subset i Er,c,i = Prediction standard error in subset i

More Related