An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Muon Shutdown meeting January 24, 2011 Burkhard Schmidt

  2. Work done in week 3 (January 17-21) • Chamber replacement: • At the end we decided not to replace GEM 17-A2 on the C-side. Interestingly, the high current on one of the GEMs disappeared (after we took this decision). • Chamber testing: • All replaced chambers have been tested successfully. However, the connectivity software is not yet working as it used to work. • Chamber conditioning: • Work on A-side has been finally completed. May thanks to Oleg! • Nacelles and M2-M5 closing: • Muon nacelles on the A-side have been removed. The tower has been closed (up to ~30 cm) to allow HCAL people start the maintenance work there. • The relay problem for the control electronics is understood and fixed. • M1 closing: • Closing test has been done successfully on Friday. However, we noticed that the station is lower by couple of mm with respect to the beam-pipe. This can have several reasons: Beam-pipe might have moved, ECAL and HCAL open, M1 might have moved. Before touching it, we need a survey.

  3. Plans for week 4 (January 24-28) • M1 final closing and survey: • Closing scheduled for tomorrow, survey for Wednesday. Dates to be confirmed tomorrow. • M2-M5 closing: • M2-M5 closing test and closing scheduled for Wednesday, survey for Thursday. • Chamber conditioning: • Start work on C-side today. We have nearly 3 weeks – but no access to the chambers any longer.  Utmost care is needed!

  4. Pending issues • Threshold scan: • Compare threshold scan between pit and lab for some chambers. May be Davide can help us. • HV settings: • Lower HV by about 50V on some regions. • System testing: • New ODE software: • Should be installed by next week, not later • Full system test: • Should be done ion the week of February 7

  5. Threshold versus HV M2/3R2W M2/3R1C (DCRO) M1R4W Only 70V M2/3R1W M1R3C M1R2C (DCRO) 100V