1 / 12

Intersection Redesign

Intersection Redesign. New Delhi, India. Joe-Hill Court Engineering, LLC. Project Engineers: Hillary Field Courtney Sweeney Joe Zongol. Outline. Existing Conditions: Delay & Costs Alternatives: Delay & Costs Alternative 1: EB Thru w/ signalization Alternative 2: Overpass

dewei
Download Presentation

Intersection Redesign

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Intersection Redesign New Delhi, India Joe-Hill Court Engineering, LLC Project Engineers: Hillary Field Courtney Sweeney Joe Zongol

  2. Outline • Existing Conditions: Delay & Costs • Alternatives: Delay & Costs • Alternative 1: EB Thru w/ signalization • Alternative 2: Overpass • Alternative 3:Roundabout Joe-Hill Court Engineering, LLC

  3. Calculations • Number of conflicts was determined by summing volumes of traffic in the conflict area • The accident rate factor was applied to the specific types of conflicts • Volumes were calculated for the entire year • Daily travel costs were distributed as specified in project document Joe-Hill Court Engineering, LLC

  4. Base Case • Yearly estimated delay: 4,400,000 veh-hours • Yearly volume: 6,300,000 vehicles Joe-Hill Court Engineering, LLC

  5. Base Case • Delay: 1531 veh-hrs • Delay cost: $66,000,000 • Total cost: $88,000,000 • Construction cost: $0 • No net present value or additional cost associated Joe-Hill Court Engineering, LLC

  6. Alternative 1 • Yearly estimated delay: 2,850,000 veh-hours • Yearly volume: 10,600,000 vehicles Joe-Hill Court Engineering, LLC

  7. Alternative 1 • Delay: 991.0 veh-hrs • Delay Cost: $43,000,000 • Total Cost: $45,000,000 • Savings: $43,000,000 • Net Present Value: $389,000,000 over a lifetime of 20 years Joe-Hill Court Engineering, LLC

  8. Alternative 2 • Yearly estimated delay: 640,000 veh-hours • Yearly volume: 15,000,000 vehicles • Adjustment of Synchro model yielded an overall LOS E Joe-Hill Court Engineering, LLC

  9. Alternative 2 • Delay: 224.0 veh-hrs • Delay Cost: $10,000,000 • Total Cost: $23,000,000 • Savings: $65,000,000 • Net Present Value: $377,000,000 over a lifetime of 20 years Joe-Hill Court Engineering, LLC

  10. Alternative 3 • Yearly estimated delay: 4,650,000 veh-hours • Yearly volume: 7,400,000 vehicles Joe-Hill Court Engineering, LLC

  11. Alternative 3 • Delay: 1618.0 veh-hrs • Delay Cost: $70,000,000 • Total Cost: $86,000,000 • Savings: $2,500,000 • Net Present Value: $85,500,000 over a lifetime of 20 years Joe-Hill Court Engineering, LLC

  12. Questions? Joe-Hill Court Engineering, LLC