Last years of the SC-ISOLDE and move to the PS-booster

Last years of the SC-ISOLDE and move to the PS-booster. H. Haas CICECO, Universidade de Aveiro , 3810-193 Aveiro, Portugal and CERN/PH-IS, CH-1211 Geneve-23, Switzerland. I S O L D E. Isotope Separator On Line D E. Isotope Separator On Line for Danish Experimentalists.

dbrowne
Download Presentation

Last years of the SC-ISOLDE and move to the PS-booster

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Last years of the SC-ISOLDE andmove to the PS-booster H. Haas CICECO, Universidade de Aveiro, 3810-193 Aveiro, Portugal and CERN/PH-IS, CH-1211 Geneve-23, Switzerland

  2. ISOLDE

  3. IsotopeSeparatorOnLineDE

  4. IsotopeSeparatorOnLine forDanishExperimentalists

  5. IsotopeSeparatorOnLine fürDeutscheExperimente

  6. IsotopeSeparatorOnLine fürDeutscheExperimente Thanks to Jürgen Kluge

  7. Status in 1987 ISOLDE collaboration: DK, S, N, F, D, C ISOLDE has some 200 users An ever increasing number of non-nuclear applications, primarily from solid state physics Workhorse ISOLDE 2 in full swing ISOLDE 3 separator almost completed

  8. Status in 1987 ISOLDE collaboration: DK, S, N, F, D, CERN ISOLDE has some 200 users An ever increasing number of non-nuclear applications, primarily from solid state physics Workhorse ISOLDE 2 in full swing ISOLDE 3 separator almost completed

  9. Problems facing SC-ISOLDE Beamlines for ISOLDE 3 in Proton Hall to be constructed (and financed !) SC becoming very old ! SC operating personnel at retirement age (or gone) CERN management considers SC shutdown by 1989 ! Our unconventional solution Final management decision: SC shutdown December 1990

  10. ISOLDE 3 completion First separator test February 1987 Special beam observation equipment required Construction of beamlines Thanks to Erich Kugler and Klaas Gase First beam for experiments: February 1988 First operation with isobar separation: November 1990

  11. New facilities RILIS (Laser ion source) NICOLE (low temperature on-line nuclear orientation) UHV beamline (first surface experiments) HV platform (moderate post acceleration)

  12. SC operation 1975 to 1990 8 hr shifts for ISOLDE He-3 beam Thanks to Brian Allardyce, …

  13. SC-ISOLDE operation Shifts for ISOLDE Used by ISOLDE 2 Used by ISOLDE 2+3 Thanks to Helge Ravn, Rudi Stöckli, …

  14. Radiation safety problems(off the record) Nuclear criminology 1 Nuclear criminology 2 The fire brigade incident

  15. Shutdown of SCDecember 19, 1990

  16. The future of ISOLDE? ISOLDE collaboration 1990: + B, GB, I 315 Registered users 35+35 Running experiments Nuclear physics requests post-acceleration ! Of special interest: Astrophysics Challenge: Catch up with TRIUMF

  17. Post-acceleration alternatives Earlier: Tandem considered, but unpractical Working party formed 1988: B.W. Allardyce, H. Haas, P.G. Hansen, B. Jonson, C.Rolfs PRIMA project proposed June 1989: Conventional RFQ – stripper – IH system Further extensions considered

  18. The big decision Transfer of ISOLDE program ? Earlier: move to PSI considered Move to RAL discussed in 1988: Financial demands excessive! CERN management decides: Move to PS-booster ! Special thanks to Carlo Rubbia

  19. Transfer to PS-booster Project taken over by CERN Layout proposed by ISOLDE collaboration:

  20. The future has started ! Thanks to Daniel Simon, …