An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PSB C04 RF system Consolidation or upgrade? M. Paoluzzi – CERN BE-RF

  2. C02 : 4 cavities in 2 straight sections freq= 0.6-1.8 MHz Vgap=8 kV Rs≈350Ωseen by the beam C04 : 4 cavities in 1 straight section freq 1.2 3.6 MHz Vgap=8 kV Rs≈350Ωseen by the beam C16 : 4 cavities in 1 straight section freq 6.0- 16 MHz Vgap=6 kV Rs≈2 kΩ seen by the beam

  3. Consolidation foreseen C02, C16 • Replacement of ITL, power supplies, cables • (rebuilt the systems keeping the cavities and amplifiers) • Possibly move AVC and Tuning loops to Low Level • Consolidation foreseen C04 • Same as above but power stage replacement • (improve mean available power and current for beam • loading compensation) • Is it the time to envisage a technology change?

  4. Narrow band Tuned systems Highly optimized Almost no room for Vgap increase Further reduction of Rs very difficult

  5. Finemet LEIR Cavity • A single cavity covers the range 0.35÷5 MHz • Cavity length 0.5 m • Gap voltage 4 kV (tested at 5 kV) • No tuning • AVC integrated in Low Level • But… • … diameter incompatible with PSB overlapped rings

  6. Finemet in PSB • Maximum outer diameter OD=330mm • Inner diameter ID=200mm • Standard Finemet thickness 25mm • Two kind of material: • Standard LEIR like : FT3M (data available from small rings) • New low loss : FT3L (Thanks to KEK and Chihiro Ohmori for • providing data)

  7. Air cooling test on small rings (OD=133mm) : • Simple blower on each ring side • With 500kW/m3 t MAX≈70°C • Maximum inside temperature unknown • Limit temperature • Suggested from Hitachi t MAX≤100°C • KEK booster experience t MAX≈100°C • J-PARC experience t MAX≈200°C for few hours

  8. Minimum peak voltage 380V for FT3L 300V for FT3M @ 1 MHz Note: f Injection ≈1 MHz with LINAC4 One C04 cavity contains 50 rings In the range 1÷4 MHz : VGAP=15÷17 kV with FT3M VGAP=19÷29 kV with FT3L

  9. Basically working on a capacitor Almost no difference with increased number of rings

  10. Alternative approach based: use two rings (FT3L) and 1 gap Each ring can accept 500pF and still cover the 1÷4 MHz band . RPmin is ≈100 Ω (per ring) P≈1500W for 700V across two rings This can be supplied by a solid-state amplifier (in PSB solid state amps used since 1987!!!)

  11. Sine shape approximation Beam current φL , TL For a pure h1 or h2 beam, the beam peak current is 22.7 A @ ej 1st rf harmonic : ÎH1 = 9.56 A 2nd rf harmonic: ÎH2 = 6.06 A w/o acceleration, the h1 bunch length: φL 138o (2.4 rad or 220 nsh1 @ej.) Total charges per bunch= 2 E13h1 (sinus shape approx.) Slide provided by A. Blas CERN BE-RF

  12. MRF157 Mosfet 600W up to 80MHz To provide 800W (2 units push-pull) ID-peak≈32A ID-DC≈10A MRF151 Mosfet 150W to 175MHz To provide 200W (2 units push-pull) ID-peak≈12A ID-DC≈4A

  13. Shunt resistance of each gap Rs≈200 Ω • To get the present 8kV need 12 gaps • Total impedance seen by the beam Rstot≈2400 Ω • Impedance of present cavities (including FB) ≈350 Ω • We must reduce Rstot and compensate beam loading with: • ≈20 dB RF feedback seems possible with 10 ns delay in the loop. • 1 turn feedback: difficult (nevertheless possible) because revolution time is only ≈500 ns at extraction. • Combination of both

  14. The cavity could be used as combiner for push-pull operation and driven by 2 amplifiers similar to the LEIR 1kW drivers. The total power could easily be brought to 2 x 2 kW simply increasing the DC supply by 15%. The 120W (200W) power module delay is 12 ns and the 9 ways combiner 4ns. Both could be reduced and 10 ns total seems within reach.

  15. Simulated system response: 1 Finemet ring driven by 9 combined 200W modules and feedback including delay . 200W module. 1 ring impedance. Amplification chain response.

  16. Advantages • Modular system. • Reduced machine space and/or increased installed voltage. • Possibility of installing spare cavities as hot back-up. • No tuning loop. • Simplified solid-state system. • Risks • Additional new system at restart with LINAC4. • New technology and configuration. • Complete new design.

  17. How could we proceed… • 2010-2011 Design and produce a first section. • … if successful then: • 2012 produce and install and test a full set of cavities for the required 8 kV. • They should fit in the place of one of the present C04 cavities. • 2013 Tests with beam (1 ring and C02 system still in place) • … if successful then: • 2014-2015 Proceed with full scale construction and • C02/C16 renovation • 2016 Installation • … but for security • 2011 Design a first C04 improved RF power amplifier. • 2012 Produce and install C04 improved RF power amplifier. • 2013 Tests with beam (1 ring) • 2014-2015 Depending on 2013 tests start C02/C04/C16 renovation or • stop C04 renovation it and proceed with new system. • 2016 Installation