Ex post evaluation 2007-2013 of ERDF and CF: State of play

An overview of the work packages and progress made in evaluating the 2007-2013 ERDF and CF programs.

coakleyd
Download Presentation

Ex post evaluation 2007-2013 of ERDF and CF: State of play

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ex post evaluation 2007-2013 of ERDF and CF: State of play DG Regional and Urban Policy Brussels, 18 June 2015 Cohesion Policy

  2. Overview of work packages

  3. Where do we stand? • Overall on track, some (manageable) delays • Ground work / case studies largely finished before August - thank you for your co-operation! • Some first findings – see below. • Seminars with case study regions ongoing

  4. WP 1: Synthesis Consultant: Applica, Ismeri Europa • Discussion in EGESIF on effectsofthecrisis 20 May 2015 • (papercirculated) • Ultimate useforsynthesisreport in 2016

  5. WP 2: Support to SME: research & Innovation and SME development Consultant: CSIL (IT), CSES (UK), ZEW (DE) • 7 regional case studies being finished • Seminar with case study regions on 29 April • Start of 3 theory-based evaluations on policy instruments • Final report in December

  6. WP 3: Financial instruments Equity, loan and guarantee instruments – support to enterprise only Consultant: T33, EPRC • Stocktaking report finalised. Covers 12 MSswhichaccount for 92% of support • 9 case studyOPsbeingcarried out • Seminar on 11 September, • Final report in November.

  7. WP 4: Support to large enterprises Consultant: KPMG (HU) • Stocktaking report finalised. Covers 8 MSswhichaccount for 75% of support • 8 case studiesbeingcarried out • Seminar on 9 July, • Final report in November.

  8. WP 5: Transport Consultant – AECOM + KPMG (Italy) • Interim report – August 2015 (10 major project case studies + 6 MS case studies + draft catalogue of challenges) • Seminar – 9 October 2015 • Final report – December, 2015

  9. WP 6: Environment Environmental infrastructure projects (drinking water, wastewater and waste). Consultant – COWI • Interim report finalised (cohesion policy contribution, review of financial analysis for 20 major projects) • 10 project case studies by mid-August and catalogue of challenges by mid-September • Seminar - 8 October 2015 • Final Report in December 2015

  10. WP 8: Energy Efficiency Consultant – Ramboll / Institute for European Environmental Policy • Case studies being finalised • Seminar on 26 June 2015 • Final Report by the end of August 2015

  11. WP 9: Culture and Tourism Consultant – IRS, CSIL BOP Consulting • Interim report (Literature review / Data analysis) finalised • Survey of MA finalised • 7 studies and 12 mini-case studies being carried out • Seminar - 9 September 2015 • Final Report by the end of October 2015

  12. WP 10: Urban Development and Social Infrastructures Consultant – METIS • Interim report (Distribution of Investments and reported outputs / Analysis of OPs and AIRs) finalised • Survey to MA finalised • Survey to project Implementation Bodies going on • Seminar – 15 July • Final Report by the end of September 2015

  13. WP 11: ETC Consultant – ADE • Interim report (review of achievements in AIR ) finalised • 9 CBC case studies being carried out • Later case study on transnational andinterregionalcooperation • Seminar - 11 December 2015 • Final Report mid-March 2016

  14. WP 12: Delivery Systems Consultant – KPMG (DE) / Prognos • Interviews with MA and seminars in MS ongoing • Survey still open until Mid July – please participate! https://surveys.kpmg.de/cohesion-policy • Interim report on TA in selected MS in autumn • Draft final report by January 2016 • Final Report by the end March 2016

  15. WP 13: Geography of expenditure Consultant: The Vienna Institute for International Economic Studies & Ismeri Europa • Breakdown of 86 priority themes by NUTS 3 • Database almost ready • Final Report by the end of August 2015 – data series from 2000 – 2013! Thankyouforyourcooperation!

  16. WP 14c / 14d: Effect on GDP etc • - regression discontinuity design (G Pellegrini) • - Propensity score matching (D Bondonio) • Questions: • - Effect of SF on GDP and other variables on NUTS2 level • - Attempt to capture effect of different aid intensity on regions • Interim report end of June

  17. Studies by Policy Development Unit New Provisions Ex Ante Conditionalities Performance Frameworks Partnership Project Thresholds Cohesion Policy