An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Neutrino factory:accelerator R&D bid against Sr2002accelerator fund Information from Joint [PPARC/CCLRC] Board on Accelerator R&D (JCBoARD) Personal (I hope informed) opinions about: Composition of accelerator bid How to organise NF accelerator bid … obviously for discussion! K. Long, UKNF, 24Jun03

  2. JCBoARD #1: 07Apr03 • Mainly administrative, but: • Grahame Blair presented draft of Linear Collider Steering Committee’s final report • Defines programme of R&D costing (from memory) £13.5M over 2003/04 – 2006/07 to put UK in position to take on beam delivery system for LC • Discusses detector R&D • Discusses strength of collaboration and organisation • KL presented neutrino factory machine R&D • MICE separate; since funded through Capital Fund • Key technologies: targetry, ion source & chopper

  3. JCBoARD #1: 07Apr03 From UKNF submission to Science Comm.

  4. JCBoARD #2: 02Jun03 • Main business: bids against accelerator fund • Total to bid against: £11.5M over 2003/04 – 2006/07 • Science Committee: ‘lion’s share for Linear Collider’ • Bid for: • Projects: e.g. targetry, ion source/chopper … • University accelerator centre: model IPPP • Deadline: 31Aug03 • PPARC strategy: Linear collider top priority Neutrino factory, should be supported • CCLRC strategy: under discussion

  5. Comment on SR2004 • PPARC strategy (again informed personal opinion): • Large bid for Linear Collider: building to ~ £40M/yr • Other accelerator work from core programme • CCLRC strategy? • Personal view: • Scientific, technical and opportunity case for UKNF programme first rate • Essential to organise so that we have strongest possible programme, documentation, organisation in place • Argue our case!

  6. Personal view: • Joined-up programme: • Off-axis beam • Neutrino factory R&D • Need to consider some work on FFAG’s in collaboration with Japanese groups

  7. Composition of UK-NF bid: • Project bid: • Exec. Summ. • Intro • History; MuScat, HARP, etc. • MICE; first priority, but separate funding line • Ownership of key technologies and develop leadership of design • Physics: • SNO/MINOS, OAB • Need for detector R&D • Key enabling technologies (KET): • Ionisation cooling (elsewhere) • Targetry • Ion beam and chopper • Structure of bid: • Embed KET R&D projects within end-to-end design study

  8. Composition of UK-NF bid (cont.): • Project bid (cont.): • Neutrino factory accelerator complex overview • From source to neutrinos, options (e.g. FFAGs) along way • Targetry • Ion source and chopper • Development of team for end-to-end design study • Requirements for SR2004 • Summary • ‘Management annexes’ • (Not quite) … as detailed as MICE-UK document – but close! • University involvement, care with MICE commitments • Opportunities for training students

  9. Organisation/management: • Formal organisation required! • Peer review, as robust as MICE? • Demonstrate our ability, enthusiasm, determination • Put UKNF science, technology, opportunity case as strongly as possible as require, from 01Sep03! UKNF steering group group ASTeC, Industry, ISIS, University Ion source/chopperManager/team Targetry Manager/team …. Design study Manager/team