1 / 14

TCDI Setup and validation

TCDI Setup and validation. TCDI Setup. Changed by hand the beta functions in the TRIM application  collimator positions moved to 5 s and position thresholds to ±0.25 s (dump) and ±0.125 s ( warning) automatically. TCDI Setup.

carlo
Download Presentation

TCDI Setup and validation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TCDI Setup and validation

  2. TCDI Setup • Changed by hand the beta functions in the TRIM application  collimator positions moved to 5 s and position thresholds to ±0.25 s(dump) and ±0.125 s (warning) automatically.

  3. TCDI Setup • Changed by hand the beta functions in the TRIM application  collimator positions moved to 5 s and position thresholds to ±0.25 s (dump) and ±0.125 s (warning) automatically. • Energy thresholds set up by hand to 10 s + 1 s (equivalent in mm)

  4. Calibration BLM • Close 1 jaw to 1 nominal snom shot the beam onto the collimator  record losses at the near by BLM. 1 s Beam axis

  5. Calibration • Close 1 jaw to 1 nominal snom shot the beam onto the collimator  record losses at the near by BLM. • Normalize BLM reading with respect to the extracted beam intensity • Define real beam size sreal(measured emittance, dispersion, nominal Dp/p = 1e-4) • Define the fraction of beam intercepted by the collimator jaw (NORMDIST(snom,beam centre, sreal) )

  6. Validation BLM • Knob producing n soscillation in H and V plane for different phases 0-30-60…-360° (the knobs had to be regenerated on the spot because of the change in the optics) 5 s Nominal beam axis 5 s

  7. Validation • Knob producing n s oscillation in H and V plane for different phases 0-30-60…-360° (the knobs had to be regenerated on the spot because of the change in the optics) • Oscillations with 5 snom amplitude  look at BLM readings  normalize with respect to the extracted intensity • Convert BLM readings in fraction of beam intercepted • Convert fraction of beam intercepted in amplitude cut in sreal by the collimator jaws (to be added to the amplitude of the applied oscillation)  TCDI aperture in sreal

  8. Validation Results Knobs and validation fine for TI2 horizontal and TI8 vertical Should measure ~3 points per phase (4,4.5,5 σ) – here we aimed only at the 5 σ oscillation due to time constraints and previous validation

  9. Validation Results • Some problems with: • TI2 vertical knob: 10 s amplitude needed to have ~ 5 mm oscillation (1 s = 0.9 mm) in the TL Recalculated amplitudes

  10. Validation Results • Some problems with: • TI2 vertical knob: 10 s amplitude needed to have ~ 5 mm oscillation (1 s = 0.9 mm) in the TL • TI8 horizontal knob: 1.5-2 s amplitude needed to have ~ 5 mm oscillation in the TL Recalculated amplitudes

  11. Validation Results • Some problems with: • TI2 vertical knob: 10 s amplitude needed to have ~ 5 mm oscillation (1 s = 0.9 mm) in the TL • TI8 horizontal knob: 1.5-2 s amplitude needed to have ~ 5 mm oscillation in the TL • For 5 mm oscillation (seen in YASP) we see a loss level at the TCDIs as expected from the ‘good’ knobs  validation OK • In principle the validation was redundant since we already measured that the TCDIs at 5 ssettings provide the required protection

  12. Injection of 144 Bunches after Setup

  13. Injection of 144 Bunches after Setup

  14. General Critical Issues • TCDIs are the only protection in case of large trajectory drifts • TCDI setup and validation takes minimum 2-3 shifts • Knob generation is critical and should never be done on the spot • Two people are needed for both procedures • At least two teams covering 8h shifts are needed or at least 8h machine downtime has to be accepted between setup and validation • Automatize as much as possible both procedures • Automatics setup tool will be tested in MD on Wednesday

More Related