An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wind & energy Iowa State University WESEP REU June 11, 2012 James McCalley (jdm@iastate.edu)

  2. Homework DOE20by2030 report: • Full report: http://www.nrel.gov/docs/fy08osti/41869.pdf • Summary www.nrel.gov/docs/fy11osti/49975.pdf 2

  3. Overview (focus mainly on US) • Preliminary energy concepts • Background on wind power growth • Policy issues for wind energy • Wind energy in context • Grand challenge questions 3

  4. A lawnmower engine is 3HP (2.2kW or 0.0022 MW). Typical car engine is 200 HP (150kw or 0.15MW). Typical home demands 1.2kW at any given moment, on avg. 1MW=106watts106w/1200w=833 homes powered by a MW. Ames peak demand is about 126MW. The US has 1,121,000MW of power plant capacity. Some preliminaries • Power: MW=1341HP. • Energy: MWhr=3.413MMbtu (106btu); 1btu=1055joules • E=P×T • Run 1.5 MW turbine at 1.5 MW for 2 hrs: 3 MWhrs. • Run 1.5 MW turbine at 0.5 MW for 2 hrs: 1MWhrs Power, P(t) 1 gallon gasoline=0.0334MWhr; Typical home uses 11000kWhrs=11MWhrs in 1 year (about 1.2kW×8760hrs). 1 ton coal=6MWhrs. 1.5 MW Time, t  • If P varies with t: Power, P Time, T Energy, E Capacity, Prated • Capacity factor: Actual annual energy production as a percentage of annual energy production at Prated 4

  5. Worldwide Source: RenewableS 2011, Global Status Report 5

  6. Worldwide Source: BTM Consultants, www.btm.dk/reports/world+market+update+2010 6

  7. Background on Wind Energy in US US Generation mix Wind & renewables are 3.6% by energy. Source: AWEA 2010 Annual Wind Report 7

  8. Background on Wind Energy in US U.S. Annual & Cumulative Wind Power Capacity Growth But what happened in 2010, 2011? Source: AWEA 2010 Annual Wind Report 8

  9. Background on Wind Energy in US 2010 is different! And 2011 is not much better. Why? Source: AWEA 2011 Fourth Quarter Market Report 9

  10. Why was wind growth in 2010/2011 less than in previous years? • Poor 2008-2009 economy: • Less willingness to load, to build projects • Less power demand! Declining natural gas prices 10

  11. Background on Wind Energy in US Percentage of New Capacity Additions. N. GAS WIND Source: AWEA 2010 Annual Wind Report 11

  12. Cur US/Can nat gas production= 26Tcf/yr Proven reserves=260Tcf: R/P=10yrs Prove+unprove reserves=2372Tcf: R/P=91 12

  13. Risks of a very high gas-electric future: • Lifetime: Infrastructure investments live for 40-60 years and are not easy to “turn” once developed. • Diversification: • Today’s national energy system portfolio consists primarily of electric (coal, nuclear, gas, renewables), heating/industrial (gas), & transportation (petroleum). A high gas-electric future, with transportation electrification, will decrease portfolio diversification, creating a national vulnerability. • Cost: Is heavy gas-electric investment the lowest cost option in terms of long-term {investment+production}? • Depletability: R/P ratios 10-90 yrs - what will be price effects as gas depletes? • Fracking: How much will public resistance grow? • CO2 emissions: Will coal-to-gas shift reduce it enough? • Alternative future: • Reduce coal in electric sector while growing gas & pipelines equally with wind+electric transmission. Co-optimize gas pipeline & electric transmission. • Replace significant petroleum for light-duty vehicles with CNG vehicles & PHEVs. • Conjecture: This approach will reduce CO2 more than a high gas-electric approach and will result in greater diversification of energy resources. 13

  14. Source: AWEA 2011 Third Quarter Market Report Top 20 states 14 of top 20 are in the interior of the nation. Top 3 coastal states are West. East coast is light on wind but heavy on load. Implication? 3 options for East coast use of wind: Build high cost inland wind, go offshore, or use transmission to move it from Midwest 14

  15. Source: AWEA 2012 First Quarter Market Report U.S. Wind Power Capacity By State 15

  16. Background on Wind Energy in US Source: AWEA Wind Power Outlook 2010 Source: AWEA 2010 Third Quarter Market Report 16

  17. Background on Wind Energy in US Market share of total 2008 wind installations Source: AWEA 2009 Annual Wind Report 17

  18. Background on Wind Energy in US Ownership by company and by regulated utility Source: AWEA 2009 Annual Wind Report 18

  19. Background on Wind Energy in US Wind plant size Source: AWEA 2009 Annual Wind Report 19

  20. 29 states, differing in % (10-40), timing (latest is 2030), eligible technologies/resources (all include wind) Background on Wind Energy in US

  21. Background on Wind Energy in US Tax incentives • Federal Incentives: • Renewed incentives Feb 2009 through 12/31/12, via ARRA • 2.2 cents per kw-hr PTC for 10 yrs or 30% investment tax credit (ITC) • State incentives: • IA: 1.5¢/kWhr for small wind, 1¢/kWhr for large wind • Various other including sales & property tax reductions 21

  22. In congress, “Energy bill” means Federal RPS, and “Climate bill” means CO2 emissions control. • Waxman-Markey Energy/Climate bill passed house 6/09. Climate part was “Cap and Trade.” • Related Kerry-Graham Climate bill did not pass Senate. • 2010 Carbon Limits & Energy For America’s Renewal, CLEAR Act (Sen Collins/Cantwell), “Cap & Refund” • Cap CO2 “upstream” via sales of coal, gas, petroleum • Producers/importers buys CO2 permits in monthly auction • 3/4 of auction revenues refunded to US citizens • Congressional attention died; Climate/energy bill non-issue in pres. campaigns • 7/11 EPA rules “Cross-State Air Pollution Rule” (CSAPR, for SO2, NOx), “Mercury/Air Toxics Standards” (MATS) have more effect, causing near-term power plant shut-down, but CSAPR stayed on 12/30/11 by US Court of Appeals, DC Circuit. Federal energy policy (don’t have one) 22

  23. Background on Wind Energy in US 23

  24. Grand Challenge Question For Energy: What investments should be made, how much, when, and where, at the national level, over the next 40 years, to achieve a sustainable, low cost, and resilient energy & transportation system? 24

  25. GEOTHERMAL SOLAR CLEAN-FOSSIL Where, when, how much of each, & how to interconnect? NUCLEAR BIOMASS Wind

  26. Grand Challenges For Wind: • Move wind energy from where it is harvested to where it can be used • Develop economically-attractive methods to accommodate increased variability and uncertainty introduced by large wind penetrations in operating the grid. • Improve wind turbine/farm economics (decrease investment and maintenance costs, increase operating revenues). • Address potential concerns about local siting, including wildlife, aesthetics, and impact on agriculture. 26

  27. Wind vs. people 27

  28. How to address grand challenges • #1. Move wind energy from where it is harvested to where it can be used. • Transmission • Eastern interconnection Midwest to East coast • National Superhighways at 765 kV AC and/or 600/800 kV DC • Right of way (rail, interstate highwys, existing transmission) • Cost allocation • Organizational nightmare • Conductor technologies: overhead/underground, materials • Offshore, lower CF turbines, higher turbines, but all of these result in higher cost of energy 28

  29. How to address grand challenges 29

  30. NETPLAN: multiperiod, multiobjective, multisector CPLEX LP inside evolutionary program; co-optimizes generation, transmission, gas pipelines to minimize 40 year investment+production costs, network flow. Investments mainly in renewables with some nuclear. • Flow is west to east. • Highest trans cap investment is MAIN (4) to ECAR (1) because: • CF (0.5 in MAIN, 0.3 in ECAR) • Load is very high in ECAR • High trans cap investment from SPP (10) to STV (9) because: • CF (0.4 in SPP, 0.1 in STV) • Load is very high in STV

  31. How to address grand challenges • #2. Develop economically-attractive methods to accom-modate increased variability and uncertainty introduced by large wind penetrations in operating the grid. • Variability: • Increase gas turbines • Wind turbine control • Load control • Storage (pumped hydro, compressed air, flywheels, batteries, others) • Increase geodiversity • Uncertainty: • Decrease it: improve forecasting uncertainty • Handle it better: Develop UC decisions robust to wind pwr uncertainty 31

  32. How to address grand challenges • #3. Improve wind turbine/farm economics (decrease investment/maint costs, increase operating revenues). • Investment: Improve manufacturing/supply chain processes, construction, collection circuit layout, interconnection cost, land lease, and financing • Operating & maintenance: • Improve monitoring/evaluation for health assessment/prediction/life-ext • Decrease maintenance costs (gearbox vs. direct-drive) • Enhance energy extraction from wind per unit land area • Improved turbine siting • Inter-turbine and inter-farm control • Increased efficiency of drive-train/generator/converters • Lighter, stronger materials and improved control of rotor blades • Taller turbines 32

  33. Wind turbine down-time distribution Reference: McMillan and Ault, “Quantification of Condition Monitoring Benefit for Offshore Wind Turbines,” 2007. 33

  34. How to address grand challenges • #4. Address potential concerns about local siting, including wildlife, visual/audible, impact on agriculture. • Migratory birds and bats: mainly a siting issue for birds. Bat-kill is more frequent. • Agriculture: Agronomists indicate wind turbines may help! • Visual: a sociological issue These issues have not been significant yet. Today, in Iowa, there are ~2600 turbines, with capacity 4200 MW. At 2 MW/turbine, a growth to 60 GW would require 30000 turbines, and assuming turbines are located only on cropland having class 3 or better winds (about 1/6 of the state), this means these regions would see, on average, one turbine every 144 acres. 34