Experiences & directions of SHIFT/CORE at CERN October 13, 1994. Designed in 1990 • fast access to large amounts of data • good tape support • cheap & easy to expand • vendor independent First implementation in operation in Jan 1991. SHIFT. SHIFT Model. CPU Server. CPU Server.

Download Presentation

Experiences & directions of SHIFT/CORE at CERN October 13, 1994

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Experiences directions of shift core at cern october 13 1994

Experiences & directionsof SHIFT/COREat CERNOctober 13, 1994


Shift

Designed in 1990

• fast access to large amounts of data

• good tape support

• cheap & easy to expand

• vendor independent

First implementation in operation in Jan 1991

SHIFT


Shift model

SHIFT Model

CPU

Server

CPU

Server

CPU

Server

CPU

Server

CPU

Server

CPU

Server

Disk

Server

Disk

Server

High Speed network

Tape

Server

Tape

Server

Tape

Server


Experiences directions of shift core at cern october 13 1994

• Centrally Operated RISC environment

Grouped CSF, SHIFT, HOPE,PIAF, TAPES, Network, Racks ...

CERNVM vs. CORE

CORE


1993 1994 strategy

Decision to run down the CRAY X/MP

Decision to run down the IBM 9000

Migrate batch by end of 94

Migrate interactive by end of 95

Decision to acquire a 64 node SP2

1993-1994 Strategy


Experiences directions of shift core at cern october 13 1994

1992

shift

Crimson

Crimson

CHEOPS

cassette tapes

and robot

~250 GBytes

SCSI disk

SGI 340

SGI 340

SGI 340

SGI 340

Cray

X-MP/48

FDDI

Data Analysis

Facility

UltraNet

cisco AGS+

IP router

CERN site LAN

SUN

4/630

SUN

4/330

SUN

4/330

ethernet

10 GBytes

SCSI disk

Simulation

Facilities

EXABYTE

JUKEBOX

25 H-P 9000-720s

STK 4280

STK 4280

STK 4280

CSF

STK 4280

STK 4280

STK 4280

H-P Apollo DN10040

HOPE

EXABYTE


Core in 1994

CORE in 1994

Put les core picture


Core in 19941

CPU server

HP 9000-735/755

SGI Challenge

SGI Power Series

DEC 3000/400,500

IBM RS/6000-370

Disk servers

SGI Power series

SGI Crimson

DEC 3000-600

IBM RS/6000 970

SUN Sparc 10

Tape servers

IBM RS/6000-370

Sun 4/330

Monitors,consoles,YP,...

Sun SPARCstations

TOTAL

CORE in 1994

# CPUs

43

44

4

11

10

4

2

3

1

1

8

3

8

143

# Systems

43

4

1

11

3

1

2

3

1

1

8

3

8

90


Core operation issues

• Reliability

Manpower/machine decreases

Automation

Monitoring

"Standard" tools

Centralize management

CORE operationissues


Core 1994

CORE 1994

Here MTBI's per manuf


Core 1995

• CORE is the infrastructure

operation, network, racks, cables, ...

• Public services

CSF,PIAF,SP2,CS/2

• Public staging pool

• Tape servers

CORE 1995


Shift cpu 1992

SHIFT CPU 1992


Core cpu 1992 94

CORE CPU 1992-94


Shift 1995

SHIFT 1995

here LEP Z0 + Req for 95 + NA 48/49 + LHC

Plus data flows LEP LHC


Disks 07 94

DISKS 07/94

Vendor Model Formatted capacity Number Total size (MB)

IBM OEM 0664CSH

IBM OEM 0664M1H 1920 12 23040

IBM OEM 0664N1D 1920 228 437760

SGI 0664N1D 1920 1 1920

MICROP 2112 1001 1 1001

HP C2247 1001 10 10010

DEC DSP5350 3406 31 105586

DEC RZ26-VA 1075 10 10750

DEC RZ28-VA 2150 6 12900

DEC RZ74 3406 63 214578

SEAGATE ST12400 2048 52 106496

SEAGATE ST2383N 317 2 634

SEAGATE ST41200 990 44 43560

SEAGATE ST41600 1331 1 1331

SEAGATE ST41650 1351 162 218862

SEAGATE ST41651 1350 6 8100

SEAGATE ST42100 1812 12 21744

SEAGATE ST43400 2778 61 169458

SEAGATE ST4766N 669 1 669

Total 704 1392239


Tape mounts week 1 43 1992

Tape mounts week 1-43 1992


Tapes in 1994

TAPES in 1994


Tapes in 19941

Tapes in 1994


Tapes 1995

NTP robots

3494 & central data recording

DLT robot

Any "reasonable" media support

TAPES 1995


Network

UltraNet still the most used

FDDI used more and more

1995 : HIPPi, FCS ...

Spectrum

Network


Ultranet bandwith oct 92

UltraNet BandwithOct 92

MB/S

DAY No

293

294 295 296 297 298 299 300 301


Network1

Network

Jacek Foils


Ultranet software

UltraNet Software

User application Software

Socket Compatibility Library

NFS

Sockets

UltraNet Driver

UDP

TCP

Transport

IP

Network

Data Link

Driver

Data Link

EtherNet

FDDI

UltraNet

Physical Link

Hardware Assisted

Protocol Engine


Shift software

• Unix Tape subsystem

multi-user, labels, multi-file, operation

• Fast Remote File Access system

• Remote Tape Copy System

• Disk Pool manager

• Tape Stager

• Clustered NQS Batch System

• Integration with standard I/O packages

Fatmen, Zebra, EPIO

• Network Operation

• Monitoring

SHIFT Software


Remote tape copy system

• select a suitable tape server

• initiates the tape-disk copy

tpread -v I29127 -g SMCF -q 4,6 pathname

tpread -v CUT322 ‘sfget -p opaldst filename‘

Remote Tape Copy System


Experiences directions of shift core at cern october 13 1994

High performance, reliability (improve on NFS)

• C I/O compatibility

Fortran subroutine interface

• rfio daemon started by open on remote machine

• optimized for specific networks

• asynchronous operation (read ahead)

• optional vector preseek

RFIO


Experiences directions of shift core at cern october 13 1994

SW

show what has changed since 1992

AFS


Stager

up to now : dpm + tpread

lack of robustness faced to system errors

concurrency not handled

• staging space not handled

Stager


Stager architecture

Stager architecture

stgcat

CPU

Server

Tape

Server

Disk

Server

CPU

Server

Tape

Server

Disk

Server

CPU

Server

Tape

Server


Stager functions

• process stage requests

• manage space

- By default purge oldest file when space needed

- if (size < 1024) w=max(atime, mtime)

else w=max(atime,mtime)-(86400*log(size/1024))

• a different algorithm may be provided

Stager functions


Stager commands

• stagein

• stageout/stageput

• stagewrt

• stageclr

• stageqry

Stager commands


Stager future extensions

• Staging of disk files

• Transfer of files already staged on CERNVM

• Access control lists

• Prioritization of requests

• Tape to Tape copy

• Automatic file migration to robots

Stager future extensions


Shift sw futures

SHIFT library in CERNLIB

RFIO review for high speed protocols

RFIO wide area

RFIO "gateway" for SP/2

RFIO per platform tuning

VMS final port

RFIO Checkpoint/Restart

Ports to Irix 6, AIX 4, HP/UX 10

SHIFT SW Futures


  • Login