Office Building-G EASTERN UNITED STATES. Carl Hubben – Structural Option Ae senior thesis - 2011. Outline. Office Building-G Eastern United States. Carl Hubben Structural Option. Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions.

Download Presentation

Carl Hubben – Structural Option Ae senior thesis - 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Office Building-G EASTERN UNITED STATES Carl Hubben – Structural Option Ae senior thesis - 2011

  2. Outline Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions

  3. Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions Project Information

  4. Project Information Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions Owner Restrictions: Occupancy Type: Square Footage: Project Cost: Number of Stories: Project details cannot be disclosed Mixed use office 649,641 sf $70,000,000 14 levels of office space 4 levels of parking below grade

  5. Office Building-G Eastern United States Carl Hubben Structural Option • Project Information • Existing Structure • Foundation • Superstructure • Project Goals • Structural Depth • Architectural Breadth • Conclusions Existing Structure

  6. Carl Hubben Structural Option Foundation Office Building-G Eastern United States Key Points • Project Information • Existing Structure • Foundation • Superstructure • Project Goals • Structural Depth • Architectural Breadth • Conclusions • Spread Footings • Up to 3100 axial kips • Parking garage and superstructure • Perimeter Foundation Wall Figure 8

  7. Superstructure Office Building-G Eastern United States Carl Hubben Structural Option Key Points • Project Information • Existing Structure • Foundation • Superstructure • Project Goals • Structural Depth • Architectural Breadth • Conclusions Existing Core • Cast in place reinforced concrete • Post-tensioned girders with 7” thick one-way slab • Structural depth of 18” • Exposed round and rectangular columns • 10” thick shear wall core

  8. Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions Project Goals

  9. Project Goals Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions • Column Free Space • Remove Shear Wall Core • Maintain Floor to Floor Height • Determine Architectural Impacts

  10. Office Building-G Eastern United States Carl Hubben Structural Option • Project Information • Existing Structure • Project Goals • Structural Depth • Loads • Floor System • Columns • Lateral System • Connections • Architectural Breadth • Conclusions Structural Depth

  11. Loads Office Building-G Eastern United States Carl Hubben Structural Option • Project Information • Existing Structure • Project Goals • Structural Depth • Loads • Floor System • Columns • Lateral System • Connections • Architectural Breadth • Conclusions Wind: Seismic: Flexible Structure Reduced Dead Load New Lateral System

  12. Floor System Office Building-G Eastern United States Carl Hubben Structural Option Floor Slab Framing Plan • Project Information • Existing Structure • Project Goals • Structural Depth • Loads • Floor System • Columns • Lateral System • Connections • Architectural Breadth • Conclusions Composite and Composite Castellated Beams • Composite metal decking • 4 ½” total thickness

  13. Floor System Office Building-G Eastern United States Carl Hubben Structural Option Castellated Beam Design Secondary Forces Primary Forces • Project Information • Existing Structure • Project Goals • Structural Depth • Loads • Floor System • Columns • Lateral System • Connections • Architectural Breadth • Conclusions • Spans range between 45’ – 65’ • Vierendeel Bending • Primary and secondary forces

  14. Floor System Office Building-G Eastern United States Carl Hubben Structural Option Existing Design Redesign • Project Information • Existing Structure • Project Goals • Structural Depth • Loads • Floor System • Columns • Lateral System • Connections • Architectural Breadth • Conclusions

  15. Columns Office Building-G Eastern United States Carl Hubben Structural Option General • Project Information • Existing Structure • Project Goals • Structural Depth • Loads • Floor System • Columns • Lateral System • Connections • Architectural Breadth • Conclusions 12 Lateral Columns 23 Gravity Columns Located on the façade or around vertical transportation ~40’ between columns on exterior W14 Sizes

  16. Lateral System Office Building-G Eastern United States Carl Hubben Structural Option North Elevation General • Project Information • Existing Structure • Project Goals • Structural Depth • Loads • Floor System • Columns • Lateral System • Connections • Architectural Breadth • Conclusions Concentrically Braced 8 Chevron Frames Span 2 floors V and inverted V design Symmetrical Design

  17. Lateral System Office Building-G Eastern United States Carl Hubben Structural Option Yellow Brace Green Brace Design • Project Information • Existing Structure • Project Goals • Structural Depth • Loads • Floor System • Columns • Lateral System • Connections • Architectural Breadth • Conclusions HSS14X14 Braces: 1/2 5/16 Load Combination: 1.2D + 0.5L + 0.5Lr + 1.0E Overstrength and redundancy factor: Ωo = 2.0, ρ = 1.0 Top Floor Deflection: H/400, 5.2” < 5.3” Inherent Torsion: CM-CR = 6.7’ 3/8 5/16 1/2 3/8 Beam Size: W27X161 Beam Size: W27X94 1/2 5/16 5/8 1/2 1/2 1/2 5/8 5/8

  18. Connections Office Building-G Eastern United States Carl Hubben Structural Option Limit States • Gusset Limit States: • Tension Yielding • Tension Rupture • Local Buckling • Gusset/Beam Limit States: • Weld Rupture • Base Metal Strength • Gusset • Beam • Beam Limit States: • Web Tension Yielding • Web Crippling • Web Buckling • Project Information • Existing Structure • Project Goals • Structural Depth • Loads • Floor System • Columns • Lateral System • Connections • Architectural Breadth • Conclusions • Brace Limit States: • Tension Yielding • Tension Rupture • Brace/Gusset Limit States: • Weld Rupture • Base Metal Strength • Brace • Gusset North Elevation West Elevation

  19. Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions Architectural Breadth

  20. Architecture Breadth Office Building-G Eastern United States Carl Hubben Structural Option Exterior Plan View Floor Section Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions

  21. Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions Conclusions

  22. Conclusions Office Building-G Eastern United States Carl Hubben Structural Option Goals: Disadvantages: Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions • Column Free Space • Remove Shear Wall Core • Maintain Floor to Floor Height • Determine Architectural Impacts More Coordination Increased Cost Foundation Impacts

  23. Acknowledgements Office Building-G Eastern United States Carl Hubben Structural Option Turner Construction Company: Carlos Flores Ryan-Biggs Associates: Chris Latreille The Pennsylvania State University: Dr. Ali Memari Dr. Linda Hanagan Dr. Louis Geschwindner Robert Holland Kevin Parfitt I would also like to give a special thanks to my friends and family for their help and support throughout the year. Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions

  24. Questions Office Building-G Eastern United States Carl Hubben Structural Option

  25. Yellow Brace Green Brace HSS14X14 Braces: 1/2 5/16 3/8 5/16 1/2 3/8 Beam Size: W27X161 Beam Size: W27X94 1/2 5/16 5/8 1/2 1/2 1/2 5/8 5/8

  26. Brace Limit States: • Tension Yielding • Tension Rupture • Brace/Gusset Limit States: • Weld Rupture • Base Metal Strength • Brace • Gusset • Gusset Limit States • Tension Yielding • Tension Rupture • Local Buckling • Gusset/Beam Limit States • Weld Rupture • Base Metal Strength • Gusset • Beam • Beam • Web Tension Yielding • Web Crippling • Web Buckling • Shear Yielding • Beam/End Plate • Weld Rupture • Base Metal Strength • Beam • End Plate • End Plate Limit States • Gross Shear • Net Shear • Block Shear • Angle Limit States • Prying Effects • Shear Yielding • Shear Rupture • Block Shear • Bolt • Shear • Tension • Bearing and Tear Out • Gusset/Plate • Weld Rupture • Base Metal Strength • Gusset • Plate • Plate • Plate bending • Plate/Column • Weld Rupture • Base Metal Strength • Plate • Column • Column • Local Flange Yielding • Local Flange Bending • Local Flange Crippling