An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KFA45 SAL6 TEST CAGE – Presentation of Pickup MeasurementsMay 2019 KFA45 Controls Upgrade Project

  2. Terminated Un-terminated versus terminated blocking output from KiTS to FIDS Un-terminated KFA45 Controls Upgrade Project

  3. Filter DS pickup with and without filter No Filter KFA45 Controls Upgrade Project

  4. DS pickup with integrator at 10kV kick Strength KFA45 Controls Upgrade Project

  5. MS Comparison of MS + integrator and DS + filter + integrator at 10kV DS KFA45 Controls Upgrade Project

  6. MS Comparison of MS + integrator and DS + filter + integrator at 10kV at different kick lengths Im DS 500ns 750ns 1000ns 1250ns KFA45 Controls Upgrade Project

  7. Comparison of MS + integrator and DS + filter + integrator at 10kV and 30kV MS 10kV DS 30kV KFA45 Controls Upgrade Project

  8. Comparison of MS + integrator and DS + filter + integrator at 60kV over 103 pulses Im standard deviation of 4.1mV (for 52.66V signal – indicating very good stability of DCPS) KFA45 Controls Upgrade Project

  9. KFA45 Controls Upgrade Project

  10. Un-terminated blocking output from KiTS to FIDS KFA45 Controls Upgrade Project