1 / 3

Massiivide koduülesandest

Massiivide koduülesandest. Töö esitamise tähtaeg on 13. õppenädal ehk 25.november 2010 Samas tunnis toimub ka kolmas kontrolltöö. Kodutöö esitamine. Valmis kodutöö sisaldab: töötav proge; aruanne; 1:1 (üksühene) algoritm; veidike selgitusi enda poolt tehtud tööst.

Download Presentation

Massiivide koduülesandest

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Massiivide koduülesandest Töö esitamise tähtaeg on 13. õppenädal ehk 25.november 2010 Samas tunnis toimub ka kolmas kontrolltöö.

  2. Kodutöö esitamine Valmis kodutöö sisaldab: • töötav proge; • aruanne; • 1:1 (üksühene) algoritm; • veidike selgitusi enda poolt tehtud tööst. Tunnis näitad ette töötava proge ja annad ära oma aruande.

  3. Kodutöö punktid • max 15 p -> töötav proge ja ideaalne aruanne; • min 3 p -> aegajalt mitte kokkujooksev proge, mis arvutab enam vähem õigesti ja ideaalne analüüs aruandes, miks proge nii käitub. • Kõik teised punktid vahepeal on töötava, kuid viimistlust nõudva proge ja aruande eest.

More Related