An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ‘Toward TIARA’Final Plan for the collaborative R&D Program WP4 Presented by Paolo Pierini 26/11/2013

  2. Deliverables One still to go TIARA-PP Final

  3. Milestones One still to go TIARA-PP Final

  4. Collaborative Programme • Task 4.3 will propose a coherent collaborative R&D programme to be carried on in the TIARA framework. • 4.3 DAP Definition of the coherent collaborative Accelerator R&D Program and identification of the necessary infrastructures. • This programme will identify the infrastructures needed to validate new technologies and to tests prototypes. The R&D Programme will also ensure appropriate coordination with non European accelerator R&D programs to be established. TIARA-PP Final

  5. KARA/KTI • WP4 work started with the identification of the Key Accelerator Areas and Key Technical Items • Listed in D4.1, updated at MS17 • All KARA/KTI are part of the TIARA potential Workplan • The TIARA R&D Work Plan assembled by agreeing on a number of main R&D topics (“themes”) TIARA-PP Final

  6. Groundwork for Work programme TIARA-PP Final

  7. KARA/KTI & Projects Presented at Madrid mid-Term TIARA-PP Final

  8. Towards TIARA Workplan • The TIARA R&D Work Plan assembled by agreeing within WP4 on a number of main R&D topics (“themes”) • Topics of sufficiently wide interest which aggregate several KARAs and KTIs • Emphasize that R&D items have potential impact on several applications • Address the needs of a broad set of communities • Not only HEP and Nuclear Physics, but also Light Sources, Medical, and Industrial applications • Identify Trends • Ongoing processes to develop EC stategies (ex. ESPP + others), no contrast with those • leads to need of periodic reassessment of workplan TIARA-PP Final

  9. Shortlist/1 • High Energy Frontier • Including Circular Colliders, High energy Linear Colliders, Gamma Colliders, Muon Colliders and Plasma Acceleration Schemes • High Intensity/Luminosity Frontier • Including Spallation Sources, Radioactive Ion Beam Facilities, Higgs Factories, p-bar Factories, Neutrino Factories • Light Sources Development • Including the large variety of schemes under discussion, as Ultimate Rings, FEL-based facilities, 5th generation light sources, ERL-based light sources TIARA-PP Final

  10. Shortlist/2 • Medical Applications • Environmental and Industrial Applications • Accelerator Cost Effectiveness, Energy efficiency & Reliability • Any R&D project enabling major improvements on these topics • Emerging Ideas & Technologies • This may be needed to cover KTIs which may not fall completely in the previous categories TIARA-PP Final

  11. Draft deliverable available ~70% • For each theme we provide • A description of the scope • Class of facilities are encompassed in the topic • The context and the applications • Identify trends of the community interest, if any • A (non-comprehensive) list of projects which are currently ongoing or been planned in this topic on national, European, or international level • Try to highlight specific challenges in each • A list of KARA/KTI’s involved • A list of ARIinvolved • This is still pending, but ARIs will be retrieved from DB by their mapping to KTI TIARA-PP Final

  12. High Energy Frontier • Based on ESPP • Projects mentioned • LHC • CLIC • Future Hadron Colliders • TLEP • LHeC • ILC • Muon • Plasma Colliders TIARA-PP Final

  13. High Intensity • Either • Rare phenomena • High flux for applications • Projects mentioned • ESS • EURISOL • FAIR • IFMIF • Missing • Neutrino factories • ... TIARA-PP Final

  14. Light Sources • Trends • Towards ultimate rings • Soft/Hard Xray FELs and high d.f. (cw) • ERLs • Projects mentioned • ESRF upgrade(s) • MAX IV • XFEL • SWISSFEL • LCLSII • ALICE • BERLINPRO • CORNELL ERL TIARA-PP Final

  15. Medical Applications • Context • Therapy • Facilities • Gantries • Future developements • Radioisotope Production • Listing of existing facilities and proposals, mostly in Eu contexts TIARA-PP Final

  16. Towards TIARA Workplan • What we do not/will not deliver • Priority ranking • Variety of institutions with different goals • Hard to build consensus in this preliminary phase • Discussed several times, but WP4 members feel analysis of priorities is not within our mandate • Costing estimates for KARA/KTI • Huge effort, require the technical expertise across many fields and manpower of several cost engineers to cover all the KTIs TIARA-PP Final

  17. KARA & Workplan mapping DRAFT TIARA-PP Final

  18. Status • Goal: Deliver D4.3 before end of TIARA-PP contract • Status: 70% of the work done (currently 26 pp) • 4 out of 7 «themes» drafted • Editing/Revision in progress • Raw contribution for the «Industrial Application» • Minute notes for drafting «Accelerator Cost Effectiveness, Energy efficiency & Reliability» • As soon a complete draft is assembled, it will be distributed to GC for comments • Approval at next GC during TIARA extension? TIARA-PP Final