1 / 2

carrier02 revD (26 assembled and in hand)

Intermediate Board Stack. Intermediate Board Stack. Intermediate Board Stack. Carrier Rev. D (carrier02, carrier13). carrier02 revD (26 assembled and in hand). carrier13 revD (26 being assembled now) *should arrive in HI by Feb 20th.

bowen
Download Presentation

carrier02 revD (26 assembled and in hand)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Intermediate Board Stack Intermediate Board Stack Intermediate Board Stack Carrier Rev. D (carrier02, carrier13) carrier02 revD (26 assembled and in hand) carrier13 revD (26 being assembled now) *should arrive in HI by Feb 20th • need modified Al/SS spacers machined (4 per boardstack; design complete) • need PEEK pogo pin carriers machined (2 per board; design being tweaked) • need a jig to precisely align the pogo pins while soldering (design in progress)

  2. Pre-production Board Stack • SCROD revB / carrier revE: • will have preliminary designs by CD-2/3 (March) • design review & fabrication in April • ready for testing ASIC right when it comes back • form factor identical to mock-up (can re-use existing board spacers)

More Related