1 / 14

PPAP Definition and Process

PPAP Definition and Process. Shane Wilson & Karl Lu. No More Defects……..Build Reliable Products…….Be The Reason. Open Discussion. How do you think that part can be approved completely?. What’s the current status? OEM v.s. Sub-tier.

Download Presentation

PPAP Definition and Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PPAP Definition and Process Shane Wilson & Karl Lu No More Defects……..Build Reliable Products…….Be The Reason

  2. Open Discussion • How do you think that part can be approved completely? • What’s the current status? OEM v.s. Sub-tier • Can you provide part approval documents anytime as requested?

  3. Table of Content • Open Discussion (done) • PPAP and AQP Introduction • Your Actions • Q & A

  4. Part Examples • Examples are • Plastic parts • Sheet metal parts • Magnesium parts • Mechanical Sub-assemblies (including secondary operations) • Coatings over substrates (i.e. plastic, aluminum, magnesium) • Badges • Hinges • Coatings (liquid & powder paints, plating, etc.)

  5. Definition & Elements Purpose Dell requires that both the part and process needs to be approved through the appropriate teams within Dell prior to start of mass production. There are 2 elements that need to be approved. These elements are the Production Part Approval Process (PPAP) and the Advanced Quality Planning (AQP) process. Elements Production Part Approval Process(referred to as PPAP) – owner is Dell Engineering Advanced Quality Planning(referred to as AQP) – owner is Dell Supplier Engineering & Quality

  6. Submittal Requirements Within each one of these elements the below documents are required to be submitted for approval: PPAP • Sample Part (ran on the equipment intended for mass production) • Drawing • First Article Inspection (FAI) • Gage Reproducibility and Repeatability (GR&R) • Process Capability (Cpk) AQP • Process Flow Diagram • Process Management Plan (PMP) • Process Failure Mode and Effect Analysis (FMEA) • Process Work Instructions (reviewed during QPA for the assembly being qualified) ** PPAP and AQP’s can be submitted in Parallel or Series. AQP’s cannot be submitted until Engineering has approved the PPAP.

  7. PPAP & AQP Quick View

  8. Situations • The following situations identify common instances where the Part Qualification Process is utilized, however, its use is not exclusive of other possible scenarios. • New Part or New Tool • Engineering Changes • Tooling Transfer, Replacement, Refurbishment • Correction of Discrepancy • Change to Optional material • Change in Part Processing/method of manufacture • Sub-supplier or Material Source Change

  9. PPAP Documents Examples of PPAP documents in Agile Mechanical PPAP Documents and Work Instructions -p/n ENG0000010 (PPAP worksheet) -p/n ENG0000011 (PPAP worksheet work instructions) -p/n ENG0000012 (Mechanical Part Qualification Process) -p/n ENG0000121 (Cable Part Qualification Process) Paint Supplier and Applicator PPAP Documents and Work Instructions -p/n ENG0000229 Paint Applicator PPAP Work Instruction -p/n ENG0000230 Paint Applicator Report - p/n ENG0000231 Paint Supplier PPAP Work Instruction -p/n ENG0000232 Paint Supplier Report

  10. AQP Documents AQP documents are loaded in Value Chain Cor.40.WWP.SQ.0257.Mechanical AQP AQP consist of: Process Flow Process Management Plan Failure Mode Effect Analysis (FMEA)

  11. PPAP & AQP Flowcharts

  12. Requirements Requirement #1: Sub-tier should provide AQP Doc. To OEM SQE and get OEM SQE’s approval (as previous requested situation) Owner: Sub-tier & OEM SQE Requirement #2: Any deviation from requirement#1, OEM SQE should escalate Dell responsible SEQ. Owner: OEM SQE Requirement #3: Both Sub-tier and OEM should maintain all AQP doc. And are able to deliver anytime as requested. Owner: Sub-tier & OEM SQE

  13. Any Question?

  14. Thank you!

More Related