An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the 2014 American Industrial Hygiene Conference and Exposition June 2, 2014 David J Weitzman Industrial Hygienist Department of Energy Office of Health and Safety, HS-10

  2. Integrated Safety Management (ISM) Thanks to CH2MWG, Idaho, LLC

  3. ISM

  4. ISM Activity Level Activity Level Work Planning Work Planning Activity-Level Work Planningand Control (ALWPC) • Where the ISM rubber meets the road • Applicable to all types of work activities including operations, maintenance, research, decommissioning, construction, etc. • Protects both the worker from the plant and the plant from the worker You

  5. Defense Nuclear Facilities Safety Board (DNFSB) • Expressed concern about work control processes in Recommendation 2004-1 • Several DNFSB letter with WP&C concerns • Reviewed WP&C at DOE sites with defense nuclear facilities from 2008-2012 • Issued DNFSB/TECH-37 ISM at the Activity Level: Work Planning and Control in 2012

  6. The Deputy Secretary outlined the following major actions in his November 2012 letter: Develop a DOE Handbook on ALWPC for contractor implementation Develop DOE CRADs and other guidance for oversight of ALWPC Conduct a workshop and evaluate operating experience • DOE’s Response

  7. Special ISM Champions Workshop DOE Forrestal HQ Building and Video and Web Conferencing Washington, DC May 15-16, 2013

  8. 8

  9. New Handbook-1211-2014 Activity-level Work Planning and Control Implementation • Approved, soon to be published • Objectives: • Improve implementation of Activity-level Work Planning and Control (ALWPC) and activity-level work; • Assist contractors in more effectively meeting requirements of ISM at the activity level; • Provide a resource to clarify DOE requirements that govern activity-level work; • Provide good practices for implementing activity-level work; and • Show the linkage between safety culture and effective ALWPC practices.

  10. New Handbook-1211-2014 Activity-level Work Planning and Control Implementation • Addresses: • Implementation of work planning and control • Skill of the worker • Work planning and control metrics, analysis, and trending • Collaborative team approaches • Activity-level work control document writer’s guide • Activity-level work control document verification and validation guidelines • Multi-week scheduling management • Fostering an environment to promote a positive safety culture and a safety-conscious work environment • DOE requirements citations as performance expectations

  11. New Handbook-1211-2014 Activity-level Work Planning and Control Implementation • Implementation Sections: • Work planning and control and ISM • Defining the scope of work • Planning the Work – Identify and Analyze Hazards • Planning the Work – Develop and Implement Hazard Controls • Planning the Work – Scheduling • Performing Work within Controls • Providing Feedback on Adequacy of Controls and Continuing to Improve Safety Management

  12. HDBK-1211-2014 Example ALWPC Process

  13. DOE G 226.1-2A Federal Line Management Oversightof DOE Nuclear Facilities • Published April 14, 2014 • Objectives: • Revise DOE-G 226.1-2 to enhance guidance for ALWPC oversight • Measure effectiveness of ALWPC systems and identify situations in which the desired outcome is not achieved • Provide a clear set of expectations and evaluationcriteria • Share best practices rather than promoting a single acceptable approach

  14. DOE G 226.1-2A Federal Line Management Oversightof DOE Nuclear Facilities • Published April 14, 2014 • Revised DOE-G 226.1-2 to enhance guidance for Activity-level Work Planning and Control (ALWPC) oversight • Can use for measuring effectiveness of ALWPC systems and identify situations in which the desired outcome is not achieved • Provides a clear set of expectations and evaluationcriteria • Shares best practices rather than promoting a single acceptable approach

  15. DOE G 226.1-2A Federal Line Management of DOE Nuclear Facilities • Based on: • The DOE requirements and guidance documents for ISM • URS Inc. procedures and an EFCOG guidance document, where appropriate • DOE analysis of ALWPC lessons learned, best practices, and DOE’s Operating Experience Program data • Lessons learned from implementation of ongoing DOE improvement actions • Ongoing efforts to improve safety culture across the DOE complex

  16. DOE G 226.1-2A Federal Line Management of DOE Nuclear Facilities • WP&C sections: • Field Element WP&C Assessments • Program Definition • Program Implementation • Operational Awareness • Oversight Schedule • Oversight Roles and Functions

  17. DOE G 226.1-2A Federal Line Management of DOE Nuclear Facilities • WP&C sections: • Analysis, Tracking, and Trending • Headquarters WP&C Oversight • CRAD Usage • Preparation for Oversight of Work Activities • Conducting Oversight of Work Activity Execution • Graded Approach for Conducting Oversight of Work Activities

  18. DOE G 226.1-2A Federal Line Management of DOE Nuclear Facilities • Includes Criteria Review and Approach Documents (CRADs): • Programmatic CRADs • Implementation CRADs • CRADs include: • References to requirements • Lines of Inquiry (LOIs) • Are tailored to the level of hazard: • From high hazard and complexity to activities appropriate for Skill of the Worker • Are useful for: • Planned reviews as well as routine operational awareness

  19. Sustained Federal and Contractor Oversight of ALWPC • Sample NNSA Work Planning and Control improvements during FY2013 and FY2014(courtesy Jim Winter, NA-00-10): • NNSA biannual reviews of Field Offices emphasize WPC oversight in the Maintenance and Conduct of Operations CRADs • A growing number of Field Offices are collaboratively targeting ALWPC oversight more holistically with Facility Representatives and SMEs such as IHs. • Several M&O Contractors are applying elements of the EFCOG WPC CRADs to Contractor Assurance activities • WPC performance improvement plans are actively managed by M&O Contractors and Field Offices

  20. Sustained Federal and Contractor Oversight of ALWPC • Sample EM Work Planning and Control improvements during FY2013 and FY2014(courtesy Don Rack, EM-42): • All EM contractors include ALWPC oversight as part of their contractor assurance systems and have incorporated ALWPC oversight into their annual assessment schedules • Each EM field element has Identified a ALWPC SME to conduct programmatic oversight • EM HQ ALWPC oversight is performed by the Office of Operational Safety (EM-42) • EM's FY 2014 ALWPC oversight will continue to focus on ALWPC program implementation 20

  21. Work Planning and Control Training • National Training Center Course SAF-269: Fundamentals of Work Planning and Control • Provides foundational level knowledge of work planning and control concepts and processes • For DOE contractor and Federal oversight personnel • Pilot tested May 5-6, 2014 at Nuclear Facility Safety Programs Workshop 21

  22. Contact • david.weitzman@hq.doe.gov, 301 903-5401