1 / 2

16:00 Meeting

16:00 Meeting. Action Items. Transportation of EM2 TEM/PSU to bld 33 – Eliazar Ortiz Mechanical inspection of EM2 TEM/PSU connectors and standoff holes – Eliazar Ortiz, Rich Gobin, Tom Borden, Jerry Clinton Proof test of Mini-Tower assembly lift fixture – Dave Kiehl

baylee
Download Presentation

16:00 Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 16:00 Meeting

  2. Action Items • Transportation of EM2 TEM/PSU to bld 33 – Eliazar Ortiz • Mechanical inspection of EM2 TEM/PSU connectors and standoff holes – Eliazar Ortiz, Rich Gobin, Tom Borden, Jerry Clinton • Proof test of Mini-Tower assembly lift fixture – Dave Kiehl • Manufacture Van de Graaff part – Reggie Rogers • Repair Van de Graaff – Gary Godfrey • Prepare for Van de Graaff operations – Gary Godfrey, Mech. Team • Build Mini-Tower assembly cart/cage – Mech. Team • Setup operator workstations in room 102 – John Canfield • Operator training (Gary, Tune, Larry, Brian, John) for data taking – Online, Offline • Check Cosmic Ray test data – Xin Chen • Module time-in procedure – Brian Horwitz, Larry Wai • Determine schedule for delivery of EM2 EGSE to IFCT – Brian Horwitz • Setup for EM2 TEM/PSU bench tests – Eliazar Ortiz • EM2 TEM/PSU Safe-to-mate Test – Brian Horwitz • Swap-in EM2 TEM/PSU – Eliazar Ortiz • Setup for Single Bay LPT – Eliazar Ortiz • Execute Single Bay LPT (w/ EM2 TEM/PSU) – Brian Horwitz, John Canfield, Jim Panetta, Lester Miller • CAL pedestal and noise calibration (compare w/ EM1) – Brian Horwitz • Execute CAL CPT – Brian Horwitz, John Canfield • Execute TKR CPT – Brian Horwitz, John Canfield

More Related