1 / 20

The Cahill Expressway Passenger Lifts

The construction of Sydney’s newest landmark………. The Cahill Expressway Passenger Lifts. Major Project Constraints:. Tourist exposure demanded shortest possible construction time, Difficult access due to expressway, Equipment exposure to weather,. The Solution…

audrak
Download Presentation

The Cahill Expressway Passenger Lifts

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The construction of Sydney’s newest landmark………. The Cahill Expressway Passenger Lifts

  2. Major Project Constraints: • Tourist exposure demanded shortest possible construction time, • Difficult access due to expressway, • Equipment exposure to weather,

  3. The Solution… Construct the Lift Cars and the Lift Shafts... SIMULTANEOUSLY

  4. The logistical process commences with the procurement of the equipment within our NSW store...

  5. Pre-assembly of the lift cars in our Matraville store

  6. In our controlled store environment assembly perfection was achieved…

  7. Pre-assembly of entire lift car including buttons & air conditioning…

  8. Meanwhile...on the other side of Sydney, construction of the lift shaft continues…

  9. Precise planning was necessary from both Reed Constructions & Liftronic...

  10. Taking shape... on multiple work faces...

  11. The busy Cahill Expressway remained open throughout construction process...

  12. Completed lift cars exit our Matraville Store...

  13. Transporting the completed lift cars from Matraville to site was a delicate operation...

  14. Night installation of the lift cars reduced inconvenience to city traffic…

  15. Final Commissioning...

  16. A team effort between Reed Constructions and Liftronic resulted in Sydney’s new landmark…

  17. The Cahill Expressway Passenger Lifts.

  18. A world renowned tourist destination… ... made even better.

  19. Project Details: Cahill ExpresswayClient: Road Traffic Authority (NSW)Architect: Noel Bell Riddley & Partners Builder: Reed Constructions Pty. Ltd Lift Specification:Type: UNITRONIC II PASSENGER LIFTSLoad: 1360 KG (20 PERSONS)Speed: 1.0 m/s Control: V.V.V.F. Duplex Travel: 16.3mFloors: 2

  20. Another successful lift installation completed byLIFTRONIC PTY LIMITED The Largest Australian OwnedLift Company

More Related